Atch 7- QASP- Performance Assessment Report (PAR).docx

DOCX document 19 KB Posted

Attached to
B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Solicitation number
22-0024
Issued by

View the file

Other files

File Type Posted
3. SOO (CZQZ22-00024) - CE FINAL.pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
1. Playground Assessment 2.pptx PPTX presentation
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
1. Site Plan (CZQZ22-0024).pdf PDF
Atch 06 - CAFB CAD Standards.docx DOCX document
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 03 - Temp Laydown Area.doc.docx DOCX document
Atch 5- QASP- Customer Complaint Record (CCR).docx DOCX document
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 10 - AF Fm 3000.pdf PDF
3. SOO (22-00024) - 8.12.2022.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).doc DOC document
Atch 2- QASP- Surveillance Checklist.docx DOCX document
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Photos.pdf PDF
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).docx DOCX document
Atch 05 - Mobile District Design Manual.pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).docx DOCX document
Atch 07 - AF3064 Schedule example.xls XLS spreadsheet
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Atch 3- QASP- Corrective Action Report (CAR).docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE

5. QAP PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)

|_| NEW

|_| REPEAT

|_| NO DEFICIENCY NOTED

8. SERVICES SUMMARY or SOW PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF QAP CITED DEFICIENCY

III. ACTION CORRECTED

14. |_| CONCUR |_| NON-CONCUR QAP SIGNATURE AND DATE

15. QAP REMARKS (REQUIRED)

16. CONTRACTOR REPRESENTATIVE REMARKS

Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQCP)

PERFORMANCE ASSESSMENT REPORT

Continuation Sheet (Number to correspond with applicable Item Number on reverse)

QASP Attachment 7 Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQC) Performance Assessment Report (PAR) Instructions

Block 1. Quality Assurance Personnel (QAP) enters contract or task order number.

Block 2. QAP enters contractor name.

Block 3. QAP enters type of services.

Block 4. QAP signs and dates.

Block 5. QAP enters telephone number.

Block 6. QAP assigns suspense date for Contractor Representative validation if a deficiency box was checked in Block 7.

Part I. Contractor Performance

Block 7. QAP checks all boxes that apply.

Block 8. QAP enters Services Summary or Statement of Work (SOW) paragraph item reviewed.

Block 9. QAP enters brief description of deficiency and tracking number if the deficiency box was checked in Block 7. Detailed description will be on Corrective Action Report (CAR).

Block 10. QAP enters a detailed performance assessment if the deficiency box in Block 7 was not checked.

Parts II and III will be used only if a deficiency was documented in Part I.

Part II. Contractor Validation

Block 11. Contractor Representative checks one box in response to QAP cited deficiency. If Concurrence is indicated, Contractor Representative continues to Block 12. If Non-Concurrence is indicated, continue to Block 13 and state reason(s) for Non-Concurrence with QAP cited deficiency and return PAR to QAP.

Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.

Block 13. Contractor Representative details Corrective Action and the Action Taken to Prevent Recurrence or Reason for Non-Concurrence of QAP cited deficiency.

Part III. Deficiency Corrected

Block 14. QAP checks appropriate block, signs, and dates.

Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to Prevent Recurrence. If Non-Concur was checked, this block should be very detailed to explain why.

Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with Contractor’s Corrective Action and Action Taken to Prevent Recurrence.

Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.