1. Playground Assessment 2.pptx

PPTX presentation 3 MB Posted

Attached to
B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Solicitation number
22-0024
Issued by

View the file

Other files

File Type Posted
3. SOO (CZQZ22-00024) - CE FINAL.pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
1. Site Plan (CZQZ22-0024).pdf PDF
Atch 06 - CAFB CAD Standards.docx DOCX document
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 03 - Temp Laydown Area.doc.docx DOCX document
Atch 5- QASP- Customer Complaint Record (CCR).docx DOCX document
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 10 - AF Fm 3000.pdf PDF
3. SOO (22-00024) - 8.12.2022.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 13 - HAZMAT Worksheet.pdf PDF
Atch 7- QASP- Performance Assessment Report (PAR).doc DOC document
Atch 2- QASP- Surveillance Checklist.docx DOCX document
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Photos.pdf PDF
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).docx DOCX document
Atch 05 - Mobile District Design Manual.pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).docx DOCX document
Atch 07 - AF3064 Schedule example.xls XLS spreadsheet
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Atch 3- QASP- Corrective Action Report (CAR).docx DOCX document
Atch 7- QASP- Performance Assessment Report (PAR).docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

27th Special Operations Wing Playground Assessment

13 May 2021

AIR COMMANDOS

Task#

TASK NAME:

BLDG: Doc Stewart 2-5 & 5-12 Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: It was recommend to install the canopies over both playground areas (2-5 & 5-12) in Doc Steward park. This will help ensure expanded UV protection for the playground users and their families.

Recommend: FSS CBR Parts Cost:

Labor:

Fire Dept.: Base Architect:

Environmental: Bio Environmental:

Real Property: SFS / WG Safety:

TASK NAME:

BLDG: Doc Steward (2-5) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: Requested to cover exposed screws and remove unessential parts of the playground equipment that are hazards.

Recommend: Shop Parts Cost: N/A Labor: 1 person / 1 hour Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (2-5) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The broken swinging bridge should be replaced or removed. This is the only way to access the slide.

Recommend:

Parts Cost:

Labor:

Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (2-5) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The landscape fabric is exposed, torn, and presents tripping hazards. Need to relevel the whole area, install new landscape fabric, and top with rubber mulch.

Recommend:

Parts Cost:

Labor:

Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (2-5) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The following pictures are of cracks within the playground structure. They illustrate the aging and decay of the entire playground structure and is recommended to be replaced in its entirety.

Recommend: Contract Services Parts Cost: $10K Labor:

Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (5-12) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The current swinging bridge needs to be corrected. Currently, there is a 9 inch drop before you reach the bridge platform. The picture on the left is the same bridge with an acceptable step onto the bridge.

Recommend:

Parts Cost:

Labor:

Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (5-12) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The landscape fabric is exposed, torn, and presents tripping hazards. Need to relevel the whole area, install new landscape fabric, and top with rubber mulch.

Recommend:

Parts Cost:

Labor:

Fire Dept.: Base Architect:

TASK NAME:

BLDG: Doc Steward (5-12) Playground REQUESTOR: MSgt Lease / TSgt Norwood UNIT: 27 SOW / Safety DESCRIPTION: Playground safety concerns SUB-AMP MANAGER: TSgt Kalili Comments: The following pictures are of cracks within the playground structure. They illustrate the aging and decay of the entire playground structure and is recommended to be replaced in its entirety.

Recommend: Contract Services Parts Cost: $18K Labor:

Fire Dept.: Base Architect:

ANY QUESTIONS?

image1.jpeg image2.png image3.png image4.jpg image5.jpg image6.jpg image7.jpg image8.jpg image9.jpg image10.jpg image11.png image12.jpg image13.jpg image14.jpg image15.jpg image16.jpg image17.png