Atch 13 - HAZMAT Worksheet.pdf

PDF 3 MB Posted

Attached to
B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Solicitation number
22-0024
Issued by

View the file

Other files

File Type Posted
3. SOO (CZQZ22-00024) - CE FINAL.pdf PDF
Atch 08 - AF Form 3065 Progress Report.xlsx XLSX spreadsheet
1. Playground Assessment 2.pptx PPTX presentation
Atch 01 - Contractor Security Hnbk 2021.pdf PDF
Atch 12 - AF Fm 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
1. Site Plan (CZQZ22-0024).pdf PDF
Atch 06 - CAFB CAD Standards.docx DOCX document
Atch 04 - AF103v16 Feb 2020 with attacher.pdf PDF
Atch 11- SOMs.xlsx XLSX spreadsheet
Atch 03 - Temp Laydown Area.doc.docx DOCX document
Atch 5- QASP- Customer Complaint Record (CCR).docx DOCX document
Atch 02 - CAFB Architectural Compatibility Guide-2012.pdf PDF
1. Specifications (General Requirements).pdf PDF
Atch 10 - AF Fm 3000.pdf PDF
3. SOO (22-00024) - 8.12.2022.pdf PDF
Atch 1- QASP- Surveillance Schedule.xlsx XLSX spreadsheet
Atch 13a - HAZMAT Worksheet instructions.pdf PDF
2. CAFB Design Deliverables.docx DOCX document
Atch 7- QASP- Performance Assessment Report (PAR).doc DOC document
Atch 2- QASP- Surveillance Checklist.docx DOCX document
Atch 07 - AF3064 Schedule example.xlsx XLSX spreadsheet
Atch 14 - HAZMAT Usage Worksheet.pdf PDF
Photos.pdf PDF
Atch 6- QASP- Combating Trafficking in Persons Checklist (CTIP).docx DOCX document
Atch 05 - Mobile District Design Manual.pdf PDF
Atch 4- QASP- Record of Contractors Preformance (CPR).docx DOCX document
Atch 07 - AF3064 Schedule example.xls XLS spreadsheet
Atch 09 - Aug 21 Comm Call out Template.pdf PDF
Atch 3- QASP- Corrective Action Report (CAR).docx DOCX document
Atch 7- QASP- Performance Assessment Report (PAR).docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

CAFB & MAFR Contractor

HAZMAT Worksheet

1. Contractor Information

Contractor Name:

Contract Number:

Project Number:

Estimated Start Date:

Estimated Completion Date:

Assigned Shop Code, if known:

2. Material Information

Material Name (from SDS):

Material Stock No. (MSN), or National Stock No.

(NSN), or Local Stock No. (LSN), enter if known:

Container Type (check one):

Box

Bag Tube

Bottle Can

Drum

Container Volume or Weight (check one):

Weight Oz. GramsPounds Tons

Quarts

Gallons

Other(Specify):

Total No. of Containers: Container Size: Total HAZMAT

Quantity:

3. Process Information

Process Type:

Process Description:

4. Engine ering

Describe process engineering controls:

5. Personal Protective Equipment (PPE)

Describe process PPE:

6. Location Information

Process will be performed on/at (check all that apply):

Existing Facility Aircraft Outdoors

E quipment New Facility

Other (Specify):

Physical location of process:

Staging location of HAZMAT:

Other (Specify)

Kilograms Fluid Oz Pints

Cartridge

ATTACHMENT A-1

Cannon AFB & Melrose AFR

Contractor HAZMAT

IAW FAR 52.223-3/AFI 32-7086 3.4.1; All HAZMAT brought onto an installation for use shall be authorized via the process described in this section.

NOTE: Manufacturer’s Safety Data Sheet (SDS) is required for every worksheet

The information submitted is complete. The HAZMAT noted above may enter Cannon AFB and/or Melrose AFR

The information submitted is incomplete and/or erroneous. Please follow the instruction below and resubmit.

7. Additional Information

Will a hazardous waste be generated (circle one)?

Yes No TBD Describe method(s) of waste management, transport, and disposal:

8. Contractor Signature Block

Title Phone Number

Printed Name Date

Signature

9. Environmental Approval Signature Block

Title Phone Number

Printed Name Date

Signature

Contractor Name:
Contract Number:
Project Number:
Estimated Start Date:
Estimated Completion Date:
Assigned Shop Code if known:
Material Name from SDS:
Material Stock No MSN or National Stock No NSN or Local Stock No LSN enter if known:
Weight Oz Pounds Tons Grams Kilograms Fluid Oz Pints Quarts Gallons Other SpecifyTotal No of Containers:
Container Size:
Total HAZMAT Quantity:
Process Type:
Process Description:
Describe process engineering controls:
Describe process PPE:
Other Specify:
Describe methods of waste management transport and disposal:
Title:
Phone Number:
Printed Name:
Date:
Title_2:
Phone Number_2:
Printed Name_2:
Date_2:
Specify:
Location:
Staging location of HAZMAT:
Group11: Off
Group12: Off
Group13: Off
Clear Form:
Group4: Off
Check Box1: Off
Dropdown9: [N/A]
Text10:
Check Box11: Off

File details come from the government source that posted it. Updated .