Atch 6-Air Force Form 66-Blank.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Repair Wells 3 SCADA Automation Federal contract opportunity
- Solicitation number
- FA480325B0002
About this file
This is an Air Force Form 66 (AF Form 66) template used for tracking material submittals on construction projects. The blank form includes columns for tracking line items, descriptions, types of submittals required, submission dates, review dates, and approval status. The template specifically lists several key submittals including Construction Schedule (due within 1 week of Notice to Proceed), O&M Manuals, design drawings at 35%, 65%, and 95% completion stages, As-Built Drawings, and HMI Graphics.
The form appears to be associated with a pre-solicitation for Shaw AFB Well 3 SCADA Automation project (FA480325B0002) which requires installation of process equipment, controls systems integration and remote SCADA access using Allen Bradley and Stratix switches equipment. The project must comply with Shaw AFB Design and Construction Standards as well as ANSI, AWWA, NEC and UPC requirements, though the form itself is just a submittal tracking template rather than containing specific technical requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 3-HMI Screen Reference.pdf | ||
| Atch 4-Site Pictures CLIN 0001.pdf | ||
| Atch 1-Statement of Work- VLSB 18-0010 Repair Well 3 with SCADA Upgrade.pdf | ||
| Atch 2- Shaw AFB Well Utility Controls Schematic.pdf | ||
| Atch 5-Pricing Sheet-Well Automation BLANK-NO FORMULA.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | ||||||||||||||||||||
| 3 | O&M Manuals | x | ||||||||||||||||||
| 4 | 35% Drawings | x | ||||||||||||||||||
| 5 | 65% Drawings | x | ||||||||||||||||||
| 6 | 95% Drawings | x | ||||||||||||||||||
| 7 | As-Built Drawings | x | ||||||||||||||||||
| 8 | HMI Graphics | x | x | |||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N
File details come from the government source that posted it. Updated .