Atch_5_DC_Booth_Shop_Bid_Schedule_2_Sheets_Rev_25_May.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH Federal contract opportunity
- Solicitation number
- 140F0621R0021
About this file
This document includes a bid schedule and proposal for the construction of a new shop building at the DC Booth National Fish Hatchery in Spearfish, South Dakota. The project involves site work including utility extensions, paving, and removal of an existing storage shed. The bid schedule provides a cost breakdown for materials, labor, and equipment for various construction divisions including concrete, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, special construction, plumbing, HVAC, electrical, earthwork, and exterior improvements. It includes general conditions and allows for overhead and profit. The related federal contract opportunity posting is seeking bids for the construction of the new shop building in accordance with the project description and specifications. The contracting officer point of contact is provided for any questions regarding the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0621R0021_Amd_0003.pdf | ||
| Amend_3_Atch_1_DC_Booth_Shop_Geotechnical_Report-Final_0003.pdf | ||
| R0021_DC_Booth_Shop__IVL_12_Jul_0002.pdf | ||
| Sol_140F0621R0021_Amd_0002.pdf | ||
| SAM_posting_Notice_Interested_Vendor_List_0001.pdf | ||
| Sol_140F0621R0021_Amd_0001.pdf | ||
| Atch_2_DC_Booth_Shop_Drawings-Half_Scale-Signed.pdf | ||
| Atch_4_DC_Booth_DBA_Wage_Det_SD.pdf | ||
| Sol_140F0621R0021.pdf | ||
| Atch_6_DC_Booth_Shop_Past_Perf_Quest.doc | DOC document | |
| Atch_3_DC_Booth_Shop_Submittals.pdf | ||
| Atch_1_DC_Booth_Shop_Specs-Final.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROJECT DESCRIPTION: |
| Construction of new shop building at the DC Booth hatchery. Building to be placed on the south end of the site in the "Bone Yard" and include utility extenstions, new paving and removal of existing storage shed. |
| A. GENERAL CONDITIONS: | |||
| Division 1: General Requirements | |||
| Mobilization and demobilization | $ | ||
| Bond | $ | ||
| General Requirements (testing) | $ | ||
| General Requirements (other) | $ |
Division 1 Total $ $0.00
B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT
Div. 3 Concrete $
Div. 5 Metals $
Div. 6 Wood & Plastics $
Div. 7 Thermal & Moisture $
Div. 8 Openings $
Div. 9 Finishes $
Div. 10 Specialties $
Div. 13 Special Construction $
Div. 22 Plumbing $
Div. 23 HVAC $
Div. 26 Electrical $
Div. 31 Earthwork $
Div. 32 Exterior Improvements $
Div. 33 Utilities $
BID TOTAL $ $0.00
OH&P % 0% $ $0.00
BID TOTAL PLUS OVERHEAD AND PROFIT $ $0.00
&"Times New Roman,Regular"&12PROPOSAL SCHEDULE
NEW SHOP BUILDING 21-034
DC BOOTH HISTORIC NATIONAL FISH HATCHERY
SPEARFISH, SOUTH DAKOTA
Summary for CLIN's Accounting
| Contractor to translate cost breakdown from above into identified Lines of Accounting. Loaded costs to include General Conditions and Overhead & Profit. Spreadsheet lines 50 from proposal schedule and 30 below totals should match. | |
| CLIN 0010 Site Work | |
| Items Included | |
| Strom water pollution plan & silt fence | INCLUDED |
| Remove Shed | INCLUDED |
| 6" Rip Rap & separation fence | INCLUDED |
| Open trench dry utilities (power, data, gas) | INCLUDED |
| 4" sewer service | INCLUDED |
| 1.25" water service | INCLUDED |
| Dirtwork (site grading, cut/fill & disposal of surplus | INCLUDED |
| Hydroseeding | INCLUDED |
| Erosion blanket | INCLUDED |
| Remove trees | INCLUDED |
| CLIN 0010 Site Work: | $ - 0 |
| CLIN 0030 Paving Work | |
| Items Included | |
| Demo Concrete Pavement | INCLUDED |
| Demo Asphalt | INCLUDED |
| 4" asphalt patch/paving | INCLUDED |
| 6" concrete pavement & valley plan | INCLUDED |
| 6" base course for paving sections & site aggregate | INCLUDED |
| Geotextile fabrics for paving areas | INCLUDED |
| Drain tile system for ditch bottom (pipe & drain rock) | INCLUDED |
| CLIN 0030 Paving Work: | $ - 0 |
CLIN 0020 Building Construction (everything else) Building Construction: $ - 0
Total Offer: $ - 0