Atch_5_DC_Booth_Shop_Bid_Schedule_2_Sheets_Rev_25_May.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
CONSTRUCT NEW SHOP BLDG, DC BOOTH NFH
Solicitation number
140F0621R0021
Issued by

About this file

This document includes a bid schedule and proposal for the construction of a new shop building at the DC Booth National Fish Hatchery in Spearfish, South Dakota. The project involves site work including utility extensions, paving, and removal of an existing storage shed. The bid schedule provides a cost breakdown for materials, labor, and equipment for various construction divisions including concrete, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, special construction, plumbing, HVAC, electrical, earthwork, and exterior improvements. It includes general conditions and allows for overhead and profit. The related federal contract opportunity posting is seeking bids for the construction of the new shop building in accordance with the project description and specifications. The contracting officer point of contact is provided for any questions regarding the solicitation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Schedule

PROJECT DESCRIPTION:
Construction of new shop building at the DC Booth hatchery. Building to be placed on the south end of the site in the "Bone Yard" and include utility extenstions, new paving and removal of existing storage shed.
A. GENERAL CONDITIONS:
Division 1: General Requirements
Mobilization and demobilization$
Bond$
General Requirements (testing)$
General Requirements (other)$

Division 1 Total $ $0.00

B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Div. 3 Concrete $

Div. 5 Metals $

Div. 6 Wood & Plastics $

Div. 7 Thermal & Moisture $

Div. 8 Openings $

Div. 9 Finishes $

Div. 10 Specialties $

Div. 13 Special Construction $

Div. 22 Plumbing $

Div. 23 HVAC $

Div. 26 Electrical $

Div. 31 Earthwork $

Div. 32 Exterior Improvements $

Div. 33 Utilities $

BID TOTAL $ $0.00

OH&P % 0% $ $0.00

BID TOTAL PLUS OVERHEAD AND PROFIT $ $0.00

&"Times New Roman,Regular"&12PROPOSAL SCHEDULE

NEW SHOP BUILDING 21-034

DC BOOTH HISTORIC NATIONAL FISH HATCHERY

SPEARFISH, SOUTH DAKOTA

Summary for CLIN's Accounting

Contractor to translate cost breakdown from above into identified Lines of Accounting. Loaded costs to include General Conditions and Overhead & Profit. Spreadsheet lines 50 from proposal schedule and 30 below totals should match.
CLIN 0010 Site Work
Items Included
Strom water pollution plan & silt fenceINCLUDED
Remove ShedINCLUDED
6" Rip Rap & separation fenceINCLUDED
Open trench dry utilities (power, data, gas)INCLUDED
4" sewer serviceINCLUDED
1.25" water serviceINCLUDED
Dirtwork (site grading, cut/fill & disposal of surplusINCLUDED
HydroseedingINCLUDED
Erosion blanketINCLUDED
Remove treesINCLUDED
CLIN 0010 Site Work:$ - 0
CLIN 0030 Paving Work
Items Included
Demo Concrete PavementINCLUDED
Demo AsphaltINCLUDED
4" asphalt patch/pavingINCLUDED
6" concrete pavement & valley planINCLUDED
6" base course for paving sections & site aggregateINCLUDED
Geotextile fabrics for paving areasINCLUDED
Drain tile system for ditch bottom (pipe & drain rock)INCLUDED
CLIN 0030 Paving Work:$ - 0

CLIN 0020 Building Construction (everything else) Building Construction: $ - 0

Total Offer: $ - 0

LINE OF ACCOUNTING AND SUMMARY BREAKDOWN