Atch 4 - Tech Worksheet - Singapore 7-23-21.docx
DOCX document 39 KB Posted
- Attached to
- S&RTS Ports of Singapore
- Solicitation number
- HTC71122RR003
About this file
This document is a technical worksheet for solicitation number HTC71122RR003 for stevedoring and related terminal services at ports in Singapore. The contractor will be required to provide all necessary labor, material handling equipment, and management services to receive, transfer, stage, load and discharge cargo for vessels, trucks, and rail on a 24/7 basis. The contractor must demonstrate capabilities for handling various cargo types safely and securely, including hazardous materials and explosives. Equipment lists, staffing plans, and procedures for yard management and inventory control are to be detailed. The response is not to exceed 25 pages and is due by the date specified in the solicitation. Failure to fully complete the technical worksheet or meet page limits may result in the proposal being deemed ineligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 - Questions and Answers and Extended due date.docx | DOCX document | |
| Atch 2 - SOR - Singapore (Final)_v2_11-4-21.xlsx | XLSX spreadsheet | |
| Round 2 Questions and Answers 11-10-21.xlsx | XLSX spreadsheet | |
| Amend 2 Q and A Rd 1.pdf | ||
| Round 1 Questions and Answers.xlsx | XLSX spreadsheet | |
| SF30 OPSEC PWS Language Change.pdf | ||
| Atch 1 - PWS - Singapore (Final) (BM) 10-20-21 v1.docx | DOCX document | |
| Atch 2 - SOR - Singapore (Final) (BM) 7-23-21.xlsx | XLSX spreadsheet | |
| Atch 1 - PWS - Singapore (Final) (BM) 7-23-21.docx | DOCX document | |
| Atch 5 - Contractor Plan for Continuation of Essential Contractor Services.docx | DOCX document | |
| HTC711-22-R-R003 Ports of Singapore.pdf | ||
| Atch 3 - RFP Information Sheet.docx | DOCX document | |
| Atch 6 - SRTS General Compliance Tool.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHEN FILLED IN THIS DOCUMENT BECOMES CUI
RFP HTC711-22-R-R003: Attachment 4 Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL WORKSHEET
SOLICITATION #: HTC711-22-R-R003 (Attachment 4)
STEVEDORING AND RELATED TERMINAL SERVICES (S&RTS)
Ports of Singapore
When completing this technical worksheet based on the posted requirements, the Offeror/Quoter shall assume the Government has no prior knowledge of the Offeror/Quoter experience past or present the Offeror/Quoter may have or performed.
The evaluator(s) will base their evaluation SOLELY on the information presented for EACH question based on the Offeror/Quoter answer given in this Technical Worksheet questioner.
**Submission Rules**
· The Offeror/Quoter proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet each item in the worksheet in accordance with the PWS. Statements that the Offeror understands, can or will comply with the PWS; statements paraphrasing the PWS or parts thereof, flowcharts simply listing activities related to performance of the PWS; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc, without a description/explanation of how services will be performed shall be considered unacceptable.
· The entire submission of this Technical Worksheet shall not exceed 25 single sided pages in length. Page size shall be no larger than 8.5x11 inches.
· Sections 1 through 4 of this Technical Worksheet shall not exceed 25 pages (a single-side is equal to 1-page). Section 6 of this Technical Worksheet will not be counted against the 25 pages however still remains a requirement for submission. .
· If more than 25 pages are received for Sections 1 through 5, only the first 25 pages will be evaluated and all other pages will be removed and therefore not evaluated.
· Documentary evidence (photos) and Material Handling Equipment (MHE) lists will not count against the page limits.
· Failure to provide a response to Sections 1 through 5, completing this document in its entirety and failure to attach all requested documentation may result in the Offeror proposal being ineligible for award.
**Technical Evaluation Questions**
1. Labor/Management (PWS Section 4)
1a. Describe/explain your capability to provide all labor within the required timeframes listed in the requirement, in order to support multiple work sites, reception of cargo for truck, and loading/discharging multiple vessels. (PWS paragraphs 4.1.5, 4.4.2, 4.6) Click here to enter text.
1b. Describe/explain your plan for addressing labor shortages due to competing requirements (e.g., commercial vs military, and moving from normal work schedules to working 24/7) and how you would mitigate those personnel shortfalls. (PWS paragraphs 4.2, 4.5.4, 4.7.1.4, 4.11.1, 4.13) Click here to enter text.
1c. Describe the type/class of labor that makes up the different work parties/gangs (i.e., truck, rail, and vessel operations), and their supervision structure. (PWS paragraphs 4.1.3, 4.1.3, 4.1.5, 4.14) Click here to enter text.
2. Material Handling Equipment (MHE) (PWS section 5/6) 2a. Describe and provide a list of equipment you have in your inventory that is available to use to handle all classes of supply (to include HAZMAT and Explosives). Please include details for LO/LO and RO/RO operation for vessel, rail, and truck operations. (PWS paragraphs 5.9.5, 6.1.19, 6.1.23) Click here to enter text.
2b. Describe how would you supply equipment for working multiple vessels while conducting stevedoring operations working 24/7 operations to support loading/discharging vessels while performing reception and depositing of USG cargo. (PWS paragraphs 5.1.1, 5.1.1.1, 6.7) Click here to enter text.
2c. Describe and provide photos of equipment you have in your inventory that would be used to tow/dray dead lined vehicles up to 160,000 lbs. on and off a vessel with deck heights up to 10’6’’. (PWS paragraphs 6.1.24, 6.1.24.1, 6.1.24.2) Click here to enter text.
3. Reception - Disposition – Yard Management (PWS Section 5/6) 3a. The Government requires our stevedore contractor to provide receipt and disposition and transfer of cargo.
Please explain your current or past business practices with reception, transferring, and disposition of cargo at each of the named ports, per the requirements. (PWS paragraphs 6.1.9, 6.1.10, 6.1.11, 6.1.12, 6.1.12.1, 6.1.12.2, 6.1.13, 6.1.14, 6.1.15, 6.1.15.1, 6.1.15.2, 6.1.15.3, 6.1.15.4) Click here to enter text.
3b. The Government maintains positive control of all cargo being imported and exported. Please explain or show evidence of how (based on the requirements) you would yard management & maintain control of cargo placed in your care, including tallying, checking and inventory of cargo. (PWS paragraphs 5.7.2, 5.7.5, 5.8.6, 5.8.6.1, 5.8.6.2) Click here to enter text.
3c. The Government may elect to operate on a 24/7 basis. Please explain or show evidence of your management services to operate under those conditions, include available labor, skills sets, and include certifications, licensing, and training as described in the requirement. (PWS paragraphs 5.1.1, 5.1.1.1, 5.1.2.1, 5.4, 5.4.1, 5.4.2, 6.4.1) Click here to enter text.
4 Truck operations (PWS section 5/6)
4a. Explain your capabilities to successfully and efficiently conduct trucking operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per its requirements. (PWS paragraphs 5.1.3, 5.1.4, 5.2, 5.8.6.1, 5.8.6.2, 5.9.3. 5.9.5.1, 5.10, 5.19, 5.24, 5.26, 6.1.5, 6.4.11, 6.10, 6.10.1, 6.7) Click here to enter text.
4b. Explain your capabilities for cargo reception & disposition via trucks. Is the area used for loading/discharging trucks in close proximity of staging areas, and piers? (PWS paragraphs 5.7.3, 5.10, 5.10.1, 5.11, ) Click here to enter text.
4c. During truck operations there may be a need for portable end ramps (weight capacity of 140 tons). Please show evidence and describe your access to the named items above (photos accepted). (PWS paragraphs 5.8.6, 5.27.1, 6.7, 6.7.1, 6.7.1.3) Click here to enter text.
4d. Government cargo as stated elsewhere is unique, and loading or discharging trucks takes a broad range of MHE and skilled labor, Please describe (photos accepted) your ability to handle loading and unloading RO/RO and describe how you would handle dead lined or inoperable vehicles weighing from 15,000 to 150,000 lbs. (PWS paragraphs 5.9.4, 5.9.5, 6.1.24, 6.1.24.2) Click here to enter text.
4e. Describe/explain your ability to provide security for handling sensitive, classified, HAZMAT cargo. (PWS paragraph 6.4.8, All Sections, SAFETY, SECURITY & HAZMAT COMPLIANCE) Click here to enter text.
WHEN FILLED IN THIS DOCUMENT BECOMES CUI
File details come from the government source that posted it. Updated .