Atch_4-Safety_Appendix.pdf
PDF 383 KB Posted
- Attached to
- Tunner CLS Bridge Federal contract opportunity
- Solicitation number
- FA8534-24-R-0008
About this file
This document is a Safety Appendix that outlines the industrial safety and health requirements for a Contractor Logistics Support contract for the Tunner Aircraft Cargo Loader. The appendix details the contractor's required safety and health plan, which must address specific elements such as pedestrian crosswalks, walking/working surfaces, housekeeping, confined space programs, personal protective equipment, hazardous materials handling, electrical safety, and fall protection. The contractor must comply with relevant OSHA, NFPA, and Air Force standards. Key requirements include appointing a safety manager, establishing impoundment procedures, and addressing safety for activities like welding, painting, and aerial lift operations. The appendix provides a comprehensive list of applicable safety regulations and guidance documents that the contractor must incorporate into their safety plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8534-24-R-0008.pdf | ||
| FA8534-24-R-0008.pdf | ||
| Tunner CLS Portfolio - updated.pdf | ||
| Tunner_CDRL_Portfolio.pdf | ||
| Atch_2-QASP.pdf | ||
| Atch_5_Tunner_GFP_02Apr2024.xlsx | XLSX spreadsheet | |
| Atch_9-Cost_Proposal_Adequacy_Structure.pdf | ||
| Atch_8-Tunner_Registration_Numbers.pdf | ||
| Atch_3-TDP.pdf | ||
| Atch_7-Provisions_for_SOFA_ROK.pdf | ||
| Atch_6-Tunner_TSSA_Determination.pdf | ||
| FA8534-24-R-0008.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAFETY APPENDIX
Industrial Safety and Health Requirements for:
PR/Contract/Project#: FD2060-24-31554
Date: 27 February 2024
Type Work: Contractor Logistics Support, Tunner Aircraft Cargo Loaders Non-Aircraft
Weapon System
PART I
Instructions: The contractor Safety and Health Plan (required in accordance with AFI 91-202, AFMC Sup) shall address in detail the items listed in Parts II and III, as applicable. Repeating the referenced standard without addressing the company’s specific processes or procedures will not suffice (i.e., “Comply with AFI 91-202”). If task specific procedures are incorporated into a contractor’s document, those procedures must be attached to the submitted Safety and
Health Plan. If the company's local procedure/document is not attached, the submitted Safety
Plan will be returned.
All references in this document will use the current version when this document is signed.
Specific revisions, dates, etc. are not included within the text due to their dynamic nature.
PART II
1. Environmental, Safety, And Occupational Health (ESOH): The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and
Health Act (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and
1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
2. Contractor Employees: Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note:
The Air Force Occupational Safety, File, and Health Standards (AFMAN 91-203) is frequently annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) Part 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs bilingual speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
3. Inspections: Air Force Environmental, Safety, Occupational Health and Fire protection officials or responsible Quality Assurance Evaluator (QAE) may periodically enter a contractor’s workplace to verify working conditions of Air Force personnel. If an Air Force employee observes improper procedures or unsafe conditions exits which place Air Force personnel or equipment/facilities in jeopardy, the contractor will remove personnel and/or equipment from the unsafe condition and immediately notify the Defense Contract Management Agency (DCMA) representative or the Contracting Officer. They, in turn, shall notify the contracting unit’s Safety
Office. For AFLCMC this notification can be performed by sending an e-mail to AFLCMC
Safety: AFLCMC.SE@us.af.mil .
4. Mishap Notification: The contractor shall notify the DCMA representative of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. For AFLCMC, DCMA will notify the
AFMC Command Center and ask for the AFLCMC/SE Director of Safety within four (4) business hours after initial notification A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the
Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the contracting unit’s Safety Office
(AFLCMC.SE@us.af.mil). The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Final Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
Note: If requested by Government Personnel (PCO/ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is finalized and closed out.
file://///RG0ABWCS0009001/uhd03/Valerie.Smith/-%20AFLCMC%20Safety%20WORK/__z%20other%20processes/Contracting%20stuff/1709%20update%20AppendC/AFLCMC.SE@us.af.mil file://///RG0ABWCS0009001/uhd03/Valerie.Smith/-%20AFLCMC%20Safety%20WORK/__z%20other%20processes/Contracting%20stuff/1709%20update%20AppendC/AFLCMC.SE@us.af.mil
5. Impoundment Procedures: The contractor shall establish written impoundment procedures, as part of their Safety and Health Plan. Impound data must be included in the Mishap
Notification Procedures as applicable. As a minimum, the procedures must address:
a. Appointment of Impound Authority in writing (copy faxed to QAP and Safety Office)
b. Impound Authority e-mail address and phone numbers
c. Specific instructions (cordon, facility locked facility, etc.) to secure the site or government asset, to prevent tampering with the aircraft, site or government assets
d. Specific instructions or measures to ensure only authorized personnel directly involved in management, SAFING, troubleshooting, or repair of aircraft or equipment gain access to the impound site
e. Additional guidance is located within Aircraft and Equipment Maintenance
Management, AFI 21-101, AFMC Supplement
6. Contractor Safety and Health Program: The contractor shall establish and maintain an acceptable safety and health program.
a. Contractor Safety and Health Manager. As part of the Contractor Safety and Health
Program, the contractor shall assign in their plan, by name, phone number and e-mail, a person who will be the primary point of contact for safety and health issues for the on-site operation.
b. Contractor’s Safety and Health Plan. Contractor shall prepare a safety and health plan in accordance with PART I, PART II, and PART III, incorporating the listed elements in PART II and addressing in detail, as applicable, the items below in PART
III of this Appendix.
(1) Government acceptance. The plan must be accepted by the government and will be incorporated into the awarded contract. Should a master safety and health plan remain on file with the contracting unit’s Safety Office, the contractor must ensure that it is current, updated, and includes all elements below. An addendum to the plan must include the processes noted below:
(2) Changes to the Plan. If, during the performance of this contract, changes to the contractor’s Safety and Health Plan are required, the contractor shall submit a revised Safety and Health Plan to the Contracting Monitor and/or Contracting
Officer’s Representative (COR). The same process of review and negotiation (if applicable) involved in the original submission applies to any revision submitted after contract award. The accepted revised Safety and Health Plan shall then be incorporated by contract modification as an attachment or by reference.
PART III
The following items represent a list of required elements, as applicable, for the performance of this contract. The contractor’s safety and health plan shall address how compliance with these requirements will be ensured. The safety plan shall clearly define company procedures on specific tasks/processes, personnel qualifications, how facilities comply with fire requirements to include the electrical wiring and fire protection systems installed (i.e., fire suppression, fire detection, fire extinguishers, firewall ratings, etc.), required equipment used to accomplish tasks and other necessary requirements to ensure the protection of government personnel and property.
The contractor’s safety and health plan shall meet, but may exceed the referenced standards.
GENERAL – PEOPLE
1. Pedestrian Crosswalks. All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians do not have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
a. Contractor shall comply with the standards in: Local base policy
2. Walking/Working Surfaces. All interior walking and working surfaces which are part of the means of egress shall remain clear at all times. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls are in place to minimize tripping hazards, the accumulation of flammable/combustible materials, etc. Portable metal ladders – methods and controls are in place to ensure inspection and safe use. Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910, Subpart D
(2) NFPA 101, Life Safety Code
3. Housekeeping. Clean as you go will be enforced. Refuse, trash, and debris will be collected daily and not left on site to prevent hazards during high winds and inclement weather.
a. Contractor shall comply with the standards in: OSHA Standard 29 CFR 1910.141
4. Confined Space Program Elements. A confined space must meet the following three criteria:
(1) Is large enough and so configured that an employee can bodily enter and perform assigned work; and
(2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry.); and
(3) is not designed for continuous employee occupancy. Examples: underground vaults, tanks, storage bins, manholes, pits, silos, process vessels, and pipelines.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.120, 146
(2) 29 CFR 1926.21 and 353
(3) AFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards
b. Contractor’s Safety Plan shall address:
(1) Hazards of confined space
(2) Permit and Non-permit confined spaces
(3) Responsibilities of management, entry supervisor, authorized entrant, and authorized attendants
(4) Training requirements
(5) Permit handling and approval
(6) Emergency and rescue plans
(7) Testing and monitoring requirements
(8) Special hazards
(9) Posting requirements (applicable to subcontractor operated facilities)
5. Personal Protective Equipment. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.132, 134, 136, Subpart I
(2) 29 CFR 1926.28, 95, 100, 101, 102, and 951
b. Contractor’s Safety Plan shall also address:
(1) Eye and face protection
(2) Head protection
(3) Foot Protection
(4) Electrical protective equipment
(5) Hand protection
(6) Safety harnesses, lifelines, and lanyards
6. Respiratory Protection Program Elements. Respirators are required to be worn if employees are exposed to inhalation hazard.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.134
(2) 29 CFR 1926.134
b. Contractor’s Safety Plan shall also address:
(1) Training
(2) Medical evaluation
(3) Fit tests
(4) Selection of respiratory equipment
(5) Storage of respiratory equipment
(6) Maintenance of respiratory equipment
(7) Pre-use checks
7. Hearing Conservation Program Elements. Note: Noise exposures are based on ACGIH guidelines of 85 dB TWA.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.95
(2) 29 CFR 1926.52
b. Contractor’s Safety Plan shall also address:
(1) Monitoring (survey of noise producing equipment)
(2) Audiometric testing
(3) Hearing Protectors
(4) Training
(5) Recordkeeping/Access to information and training material
8. Medical and First Aid.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910, Subpart K
(2) 29 CFR 1926, Subpart C
b. Contractor’s Safety Plan shall also address:
(1) Adequate first aid supplies
(2) Trained employee to render first aid
(3) Recordkeeping
(4) Reporting and investigating accidents/incidents
(5) Off-site physician(s)
(6) Maintenance of and employee access to exposure monitoring data and medical records
ENVIRONMENTAL
9. Toxic and Hazardous Substances.
(1) 29 CFR 1910, Subpart Z
(2) 29 CFR 1926, Subpart Z
b. Contractor’s Safety Plan shall also address a section related to working with toxic and hazardous substances, such as asbestos, benzene, lead, and styrene, where the following areas are addressed:
(1) Threshold Limit Values (TLV)-Exposure monitoring
(2) Medical surveillance
(3) Work practices
(4) Engineering controls
(5) Respiratory protection
(6) Protective clothing (PPE)
10. Hazardous Waste Operations.
(1) 29 CFR 1910.120
(2) 29 CFR 1926.65
b. Contractor’s Safety Plan shall also address:
(1) Emergency Response Plan
(2) Personal Protective Equipment
(3) Medical Surveillance
(4) Health and Safety Plan (HASP– required elements have been incorporated)
(5) Employee Training
11. Hazardous Materials.
a. Contractor shall comply with the standards in: 29 CFR 1910.120, Subpart H (chemicals, compressed air, acetylene, etc.).
b. When handling the hazardous material the Contractor’s Safety Plan shall address:
(1) Training, handling, storage, use and PPE
(2) Explosives and blasting agents
(3) Dipping and coating operations
12. Hazardous Communications.
a. Contractor shall comply with the standards in: 29 CFR 1910.1200.
b. Contractor’s Safety Plan shall also address:
(1) Written Program-list of hazardous chemicals
(2) Identify the hazardous chemical(s) - labeling system
(3) MSDS data sheet location
(4) Employee information and training-methods used to inform employees of the hazards, and precautionary measures
13. Welding, Cutting and Brazing.
(1) 29 CFR 1910.251 thru 255
(2) 29 CFR 1926.102, 153, 453
(3) AFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards
(4) NFPA 410, Standard on Aircraft Maintenance
(5) NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot
Work.
b. Contractor’s Safety Plan shall also address:
(1) Welding Permit Required from Fire Department
(2) Training/worker knowledge
(3) Equipment inspections, service, and use
(4) Fire protection and prevention
(5) Protective equipment & welding shields
(6) Health protection (PPE)
(7) Ventilation
(8) Cylinders and containers
(9) Cylinder storage
14. Batteries.
(1) For battery servicing in accordance with OSHA Standard 29 CFR 1910.178, 305
(2) Site specific applicable aircraft T.O.s.
GENERAL - EQUIPMENT
15. Motor Vehicles. Applies to all persons (contractors, sub-contractors, vendors, commercial delivery companies, etc.) and vehicles (owned, leased, privatized, etc.) operated anywhere on an
Air Force installation, including the airfield and/or industrial areas.
a. Contractor shall comply with the standards in:
(1) DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations
(2) DoDI 6055.4, DoD Traffic Safety Program
(3) AFI 91-207, USAF Traffic Safety Program
(4) AFI 13-213, Airfield Driving, paragraph 2.8
(5) Local guidance (appropriate AFI 13-213 location supplement)
(6) 40 U.S.C., Section 318c; Public Buildings, Property and Works
16. System Modification which Alters Form, Fit or Function.
a. Contractor shall comply with: Mil Standard 882E, System Safety for system modifications which alter form, fit, or function.
17. General Environmental Controls.
(1) 29 CFR 1910, Subpart G and J
(2) 29 CFR 1926, Subpart D
b. Contractor’s Safety Plan shall also address:
(1) Sanitation-toilet and washing facilities
(2) Accident prevention signs and tags
MATERIAL RELATED
18. Materials Handling and Storage.
(1) 29 CFR 1910.101, Subparts F, H & N
(2) 29 CFR 1910.178
(3) 29 CFR 1926.250, 953, 957
b. The Contractor’s Safety Plan shall also address:
(1) Storage and handling of materials
(2) Disposal of trash from elevations
(3) Personnel lifting techniques--proper storage to prevent shifting, for stability, etc.
(4) Rigging (requirements, inspection, components, and qualifications)
(5) Equipment (use in handling materials)
(6) Industrial trucks (training, inspection, maintenance, and safe use)
19. Machinery and Machine Guarding.
a. Contractor shall comply with the standards in: 29 CFR 1910, Subpart O
b. Contractor’s Safety Plan shall also address:
(1) Control of rotating parts, flying chips, and sparks
(2) Inspection
(3) Maintenance
20. Hand and Portable Powered Tools and other Hand-Held Equipment.
(1) 29 CFR 1910, Subpart P
(2) 29 CFR 1926, Subpart I
b. Contractor’s Safety Plan shall also address:
(1) Inspection
(2) Proper use
(3) Required PPE
(4) Guarding
(5) Maintenance
(6) Control of rotating parts, flying chips, and sparks
21. Painting and Paint Removal.
a. Contractor shall comply with the guidance in:
(1) T.O. 1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment
(2) NFPA 33, Spray Application Using Flammable or Combustible Materials
(3) NFPA 410, Standard on Aircraft Maintenance.
22. Cleaning/Corrosion Control for Avionics and Electronics.
a. Contractor shall comply with guidance in: T.O. 1-1-689-3, Cleaning and Corrosion
Control Volume III Avionics and Electronics.
AIR & LIQUIDS
23. Handling, Storage, and Use of Flammable/Combustible Liquids.
(1) NFPA 30, Flammable and Combustible Liquids Code
(2) NFPA 33 Spray Application Using Flammable or Combustible Materials
24. Compressed Gas and Compressed Air Equipment.
a. Contractor shall comply with the standards in: 29 CFR 1910.169, Subpart M.
b. Contractor’s Safety Plan shall also address:
(1) Employee Training
(2) Inspections
(3) Storage and Handling
25. Liquid Gaseous Oxygen/Cryogenics.
a. Contractor’s procedures shall comply with:
(1) AFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, Chapters 22 and 26
(2) T.O. 00-25-172, Ground Servicing of Aircraft and Static Grounding/Bonding
(3) NFPA 51, Design & Installation of Oxygen–Fuel Gas Systems for Welding, Cutting, and Allied Processes.
ELECTRICAL
26. Electrical. Electrical wiring and equipment shall be a type listed by Underwriters
Laboratory (UL) or another recognized listing agent.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910, Subpart S
(2) 29 CFR 1926, Subpart K
(3) AFMAN 91-203, Air Force Occupational Safety, Fire, and Health Instruction, chapter 8
(4) NFPA 70, National Electrical Code
b. Contractor’s Safety Plan shall also address:
(1) Selection and use of work practices
(2) Training (basic electrical safety knowledge)
(3) Use of equipment (handling, visual inspection, rating of equipment)
(4) GFCI Protection for outside contractor drops and wet/damp areas
(5) Arc Flash
27. Soldering.
a. Contractor shall comply with the requirements in:
(1) T.O. 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, chapter 3
(2) 29 CFR 1910.253
28. Electronic/Electrostatic Discharge Sensitive Components.
a. Contractor shall comply with the requirements in:
(1) MIL-HDBK-263B, Electrostatic Discharge Control Handbook for Protection of
Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically
Initiated Explosive Devices)
(2) MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of
Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically
Initiated Explosive Devices)
(3) T.O. 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment
(4) ANSI/ESD S20.20, Protection of Electrical and Electronic Parts, Assemblies and
Equipment (Excluding Electrically Initiated Explosive Devices)
29. Hazardous Energy Control Program Elements (Lockout-Tagout).
(1) 29 CFR 1910, Subpart S
(2) 29 CFR 1926, Subpart K
(3) AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, chapter 21
(4) NFPA 70 – Standard for Electrical Safety in the Workplace
b. Contractor’s Safety Plan shall also address:
(1) Purpose of hazardous energy control program
(2) Employee training
(3) Lockout/tagout procedures-Removal of locks and tags
(4) Periodic inspections
(5) Restoring equipment to normal operations
(6) Arc Flash
(7) Portable Fire Extinguishers (proper type, inspection, maintenance, testing, and training)
AIRFIELD & FACILITIES
30. Foreign Object Damage (FOD) Awareness, Prevention and Responsibilities. The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents.
Contractors and site/operations evaluators will ensure tools; equipment, rags, residue and hardware are properly stored and accounted for. “Clean as you go” methods are required.
a. Contractor shall comply with the standards in:
(1) AFI21-101 Aircraft and Equipment Maintenance Management
(2) AFI 21-101 AFMC Sup 1, Aircraft and Equipment Maintenance Management, chapter 11
(3) National Aerospace Standard (NAS) 412, Foreign Object Damage/Foreign Object
Debris (FOD) Prevention Program
(4) AFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, chapter 24
(5) Applicable local guidance
b. Contractor’s Safety Plan shall also address FOD minimizing techniques to include (but not limited by):
(1) Waste dumpsters
(2) Waste hauling trucks
(3) Barriers to stop migrating FOD from dirt/gravel piles
(4) Daily clean up
(5) Weekly briefings
(6) FOD Awareness and Prevention training
(7) Flight Line Drivers Training
(8) Vehicle Foreign Object (FO) inspection
(9) Vehicle FO control (cover loads, secure loads, etc.)
(10) Any other contract specific potential FOD impact correction
31. Fire Protection for Facilities.
(1) NFPA 10, Portable Fire Extinguishers
(2) NFPA 13, Installation of Sprinkler Systems
(3) NFPA 33 Standard for Spray Application Using Flammable or Combustible Materials
(4) NFPA 70, National Electrical Code
(5) NFPA 72, National Fire Alarm and Signaling Code
(6) NFPA 91, Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Particulate Solids
ELEVATED SURFACES
32. General Fall Protection. If a person can fall 4 feet or more, fall protection must be provided to prevent injury.
(1) 29 CFR 1910.66, Appendix C, Subpart F
(2) 29 CFR 1926.500-502, Subpart M
b. Contractor’s Safety Plan shall also address:
(1) Guardrail System (height and load rating)
(2) Safety Net System (location, inspection, and testing)
(3) Personal Fall Arrest System (PFAS)
(4) Life line, lanyard, component strength, and anchorage
(5) Fall Protection Plan
(6) Qualifications of persons
33. Work Stands/Platforms.
a. Contractor’s procedures shall comply with:
(1) AFMAN 91-203, Air Force Consolidated Occupational Safety, Fire, and Health
Standards, chapter 24
(2) 35A4 series T.O.s, Ground Support Equipment (various maintenance stands)
34. Scaffolding. Scaffolds are used for persons engaged in work that cannot be done safely from the ground or from solid construction. A competent and qualified person must be on site to make decisions on scaffolding operations.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910, Subpart D
(2) 29 CFR 1926, Subpart L
b. Contractor’s Safety Plan shall also address safety requirements for construction (as applicable), operation, maintenance, inspections, fall protection, and use:
(1) Rails
(2) Railings
(3) Bracing
(4) Toeboards
(5) Fall Protection
35. Personal Protective Equipment For Aerial Lift Devices. Fall restraint is the preferred standard for DoD installation operations with aerial devices.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.66, Subpart F, Appendix C
(2) 29 CFR 1910.133, Eye and Face Protection
(3) 29 CFR 1926.453, Aerial Lifts
(4) 29 CFR 1926.104, Safety Belts, Lifelines & Lanyards
(5) 29 CFR 1926.501, Duty to Have Fall Protection
b. Contractor’s Safety Plan shall also address:
(1) Fall restraint on all aerial lift devices (unless so certified for fall arrest by the manufacturer)
(2) Fall restraint shall consist of a harness (no body belts allowed) and a lanyard shortened to the minimum length to allow work but not allow the employee to leave the platform cage or stand on toe-boards or mid-rails
(3) Energy absorbing lanyards are not authorized for fall restraint
(4) Lanyards shall have self-closing; self-locking keepers which remain closed and locked until unlocked and pressed open for connection or disconnection
(5) Contractor employees operating, observing and spotting for aerial devices shall wear approved hard hats
36. Powered Platforms, Manlifts and Vehicle-Mounted Work Platforms. Manlifts are used for the purpose of allowing workers to perform duties at elevated levels. A competent and qualified person must be onsite to make decisions on manlift operations. Note: Fall restraint is the preferred method for fall protection.
a. Contractor shall comply with the standards in:
(1) Appropriate -35 series T.O.s: TOs, the -35 series
(2) 29 CFR 1910, Subpart F
b. Contractor’s Safety Plan shall also address:
(1) Personal Fall Arrest Systems (PFAS) (body harness, lanyard, lifeline, etc., inspections)
(2) Manlift – maintenance, inspection, and operation
37. Aerial Lift Equipment. Aerial lifts have inherent risks associated with their use. The Air
Force has established procedures to ensure only trained and qualified personnel are operating aerial lifts.
a. Contractor shall comply with the standards in:
(1) 29 CFR 1910.66, Subpart F
(2) ANSI/SAIA A92.2 Vehicle-Mounted Elevating and Rotating Aerial Devices
(3) AFMAN 91-203, Air Force Consolidated Occupational Safety, Fire, and Health
Standards, chapter 16
b. Contractor’s Safety Plan shall also address:
(1) Types of Aerial devices used to elevate personnel to job sites above ground:
- Extendible boom platforms
- Aerial ladders
- Articulating boom platforms
- Scissor lifts
- Vertical towers and a combination of any of the above
- Deemed aerial lifts whether or not they are capable of rotating about a substantially vertical axis
(2) Construction of Aerial devices include:
- Metal
- Wood
- Fiberglass reinforced plastic
- Other material
(3) Power source
- Powered
- Manual
38. Contractor Aerial Lift Devices. Contractors, subcontractors, vendors, commercial delivery companies, and all other private business vehicles will comply with the following requirements while operating any type of aerial lift as described above, while on a DoD installation. This includes contractor owned equipment, leased or rented equipment acquired to support the contractual activities
a. Contractors shall comply with the standards in:
(1) 29 CFR 1910.66 and 67
(2) 29 CFR 1926.453
(3) ANSI/SAIA A92.2 Elevating and Vehicle Lift Devices
b. Aerial lifts acquired for use before 1 Jul 75 shall be modified to conform to the above guidance
c. Aerial lift devices acquired on or after 1 July 1975, shall be designed and constructed in conformance with the above guidance.
d. Prior to bringing an aerial device onto a DoD installation, the contractor shall ensure:
(1) Aerial devices meet the above 29 CFR 1910.66 and 1910.67 requirements
(2) Aerial devices meet certification and classification for the designated work area
(3) Aerial devices are serviceable, and all safety devices, warning devices, and interlocks operate
(4) Aerial devices (regardless of guardrail, mid-rail or toe board configuration) will have fall protection attach points installed
(5) Aerial devices will contain the manufacturer’s manual and operator’s safety manual.
The applicable ANSI Standard will satisfy the requirement for a safety manual.
The contractor and operating employee will be trained and certified on the leased/rental device and provide visual certification upon request
(6) Aerial lifts will not be used to deliver employees to higher levels unless so certified
39. Cranes, Derricks, Hoists, Elevators and Conveyors. Cranes are used to move material, simplify materials handling and heavy or bulky supplies and equipment.
a. Contractor shall comply with the standards in: 29 CFR 1926, Subpart N
b. Contractor’s Safety Plan shall also address:
(1) Load capacities and operating speeds must be posted
(2) Special hazard warnings and instructions – visible to operator
(3) Hand signals – per ANSI standard for type of crane in use
(4) Inspections
(5) Personnel must be trained/qualified/certified by a nationally recognized crane certification league to operate these items.
Annex 1 – Quick reference to paragraphs
Page # Para # Description
4 GENERAL-PEOPLE
4 1 Pedestrian Crosswalks
4 2 Walking/Working Surfaces
4 3 Housekeeping
4 4 Confined Space Program Elements
5 5 Personal Protective Equipment
5 6 Respiratory Protection Program Elements
5 7 Hearing Conservation Program Elements
6 8 Medical and First Aid
6 ENVIRONMENTAL
6 9 Toxic and Hazardous Substances
6 10 Hazardous Waste Operations
6 11 Hazardous Materials
7 12 Hazardous Communications
7 13 Welding, Cutting and Brazing
7 14 Batteries
7 GENERAL-EQUIPMENT
7 15 Motor Vehicles
8 16 System Modifications which alters Form, Fit or Function
8 17 General Environmental Controls
8 MATERIAL RELATED
8 18 Materials Handling and Storage
8 19 Machinery and Machine Guarding
8 20 Hand and Portable Powered Tools and other Hand-Held Equipment
9 21 Painting and Paint Removal
9 22 Cleaning/Corrosion Control for Avionics and Electronics
9 AIR & LIQUIDS
9 23 Handling, Storage, and Use of Flammable/Combustible Liquids
9 24 Compressed Gas and Compressed Air Equipment
9 25 Liquid Gaseous Oxygen/Cryogenics
9 ELECTRICAL
9 26 Electrical
10 27 Soldering
10 28 Electronic/Electrostatic Discharge Sensitive Componenents
10 29 Hazardous Energy Control Program Elements (Lockout-Tagout)
11 AIRFIELD & FACILITIES
11 30 Foreign Object Damage (FOD) Awareness, Prevention and
Responsibilities
11 31 Fire Protection for Facilities
11 ELEVATED SURFACES
11 32 General Fall Protection
12 33 Work Stands/Platforms
12 34 Scaffolding
12 35 Personal Protective Equipment for Aerial Lift Devices
13 36 Powered Platforms, Manlifts and Vehicle-Mounted Work Platforms
13 37 Aerial Lift Equipment
13 38 Contractor Aerial Lift Devices
14 39 Cranes, Derricks, Hoists, Elevators and Conveyors
Annex 2 – Document Links
Guidance Name Link
29 CFR 1910
OSHA Standards - Occupational Safety and Health Standards https://www.osha.gov/laws-regs/regulations/standardnumber/1910
29 CFR 1926
OSHA Standards - Safety and Health Regulations for Construction https://www.osha.gov/laws-regs/regulations/standardnumber/1926
40 U.S.C. 318c Public Buildings, Property and Works https://www.govinfo.gov/app/details/USCODE-2001-title40/USCODE-2001-title40-chap4-sec318c/summary
AFI 13-213 GM Airfield Driving https://static.e-publishing.af.mil/production/1/af_a3/publication/afi13-213/afi13-213.pdf
AFI 13-213 location supps Supplements for different locations https://www.e-publishing.af.mil/Product-Index/#/?view=search&keyword=13-213&isObsolete=false&modID=449&tabID=131
AFI 21-101
Aircraft and Equipment Maintenance Management https://static.e-publishing.af.mil/production/1/af_a4/publication/afi21-101/afi21-101.pdf
AFI 21-101 AFMC Sup Aircraft and Equipment Maintenance Management https://static.e-publishing.af.mil/production/1/afmc/publication/afi21-101_afmcsup/afi21-101_afmcsup.pdf
AFI 91-207 The US Air Force Traffic Safety Program https://static.e-publishing.af.mil/production/1/af_se/publication/afi91-207/afi91-207.pdf
AFMAN 91-203 GM
Air Force Occupational Safety, Fire, and Health Standards https://static.e-publishing.af.mil/production/1/af_se/publication/afman91-203/afman91-203.pdf
ANSI/ESD-S20.20
Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) https://webstore.ansi.org/Standards/ESDA/ANSIESDS20202014?gclid=EAIaIQobChMI0urj0OLc4wIVi5yzCh1x0wREEAAYASAAEgKiCvD_BwE
ANSI/SAIA A92.2
Vehicle-Mounted Elevating and Rotating Aerial Devices https://ewb.ihs.com/#/document/ZFYXMFAAAAAAAAAA?qid=637003629239513948&sr=re-1-10&kbid=4%7C20027&docid=942378737#hb7194838
DoDD 5525.4, chg3 Enforcement of State Traffic laws on DoD Installations https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodd/552504p.pdf?ver=2019-04-29-080311-413
DoDI 6055.4, ch4 DoD Traffic Safety Program https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/605504p.pdf
FAR Part 12 Acquisition of Commercial Items https://www.acquisition.gov/far/part-12 https://www.osha.gov/laws-regs/regulations/standardnumber/1910 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.govinfo.gov/app/details/USCODE-2001-title40/USCODE-2001-title40-chap4-sec318c/summary https://static.e-publishing.af.mil/production/1/af_a3/publication/afi13-213/afi13-213.pdf https://www.e-publishing.af.mil/Product-Index/#/?view=search&keyword=13-213&isObsolete=false&modID=449&tabID=131 https://static.e-publishing.af.mil/production/1/af_a4/publication/afi21-101/afi21-101.pdf https://static.e-publishing.af.mil/production/1/afmc/publication/afi21-101_afmcsup/afi21-101_afmcsup.pdf https://static.e-publishing.af.mil/production/1/af_se/publication/afi91-207/afi91-207.pdf https://static.e-publishing.af.mil/production/1/af_se/publication/afman91-203/afman91-203.pdf https://webstore.ansi.org/Standards/ESDA/ANSIESDS20202014?gclid=EAIaIQobChMI0urj0OLc4wIVi5yzCh1x0wREEAAYASAAEgKiCvD_BwE https://ewb.ihs.com/#/document/ZFYXMFAAAAAAAAAA?qid=637003629239513948&sr=re-1-10&kbid=4%7C20027&docid=942378737#hb7194838 https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodd/552504p.pdf?ver=2019-04-29-080311-413 https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/605504p.pdf https://www.acquisition.gov/far/part-12
MIL-HDBK 263B
Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) http://everyspec.com/MIL-HDBK/MIL-HDBK-0200-0299/MIL_HDBK_263B_162/
MIL-STD 882E System Safety https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=36027
MIL-STD 1686C
Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=37095
NAS 412
Foreign Object Damage (FOD) Prevention Guidance Document https://global.ihs.com/doc_detail.cfm?document_name=NAS412&item_s_key=00278892
NFPA 10 Portable Fire Extinguishers https://codesonline.nfpa.org/code
NFPA 13
Standard for the Installation of Sprinkler Systems https://codesonline.nfpa.org/code
NFPA 30 Flammable and Combustible Liquids Code https://codesonline.nfpa.org/code
NFPA 33
Standard for Spray Application using Flammable or Combustible Materials https://codesonline.nfpa.org/code
NFPA 51
Standard for the Design and Installation of Oxygen-Fuel Gas Systems for Welding, Cutting, and Allied Processes https://codesonline.nfpa.org/code
NFPA 51B
Standard for Fire Prevention During Welding, Cutting, and Other Hot Work https://codesonline.nfpa.org/code
NFPA 70 National Electrical Code https://codesonline.nfpa.org/code
NFPA 72 National Fire Alarm and Signaling Code https://codesonline.nfpa.org/code
NFPA 91
Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Particulate Solids https://codesonline.nfpa.org/code
NFPA 101 Life Safety Code (search within AF Portal) https://codesonline.nfpa.org/code
NFPA 410 Standard on Aircraft Maintenance https://codesonline.nfpa.org/code
T.O. 00-25-172 Ground Servicing of Aircraft and Static Grounding/Bonding https://tosune5.robins.af.mil/gwtmp/00-25-172_3580.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723 http://everyspec.com/MIL-HDBK/MIL-HDBK-0200-0299/MIL_HDBK_263B_162/ https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=36027 https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=37095 https://global.ihs.com/doc_detail.cfm?document_name=NAS412&item_s_key=00278892 https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://codesonline.nfpa.org/code https://tosune5.robins.af.mil/gwtmp/00-25-172_3580.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723
T.O. 00-25-234, chg11 General Shop Practice Requirements for the Repair, Maintenance, and Test of Electrical Equipment https://tosune5.robins.af.mil/gwtmp/00-25-234_7527.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723
T.O. 1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equipment https://tosune5.robins.af.mil/gwtmp/1-1-8_8418.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723
T.O. 1-1-689-3 Cleaning and Corrosion Control Vol III Avionics and Electronics https://tosune5.robins.af.mil/gwtmp/1-1-689-3_1985.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723
UL Underwriters Laboratory Website https://www.ul.com/ https://tosune5.robins.af.mil/gwtmp/00-25-234_7527.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723 https://tosune5.robins.af.mil/gwtmp/1-1-8_8418.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723 https://tosune5.robins.af.mil/gwtmp/1-1-689-3_1985.pdf?pageTitle=Active+Technical+Order+Results&TDGVersion=v5.17.6-20200723 https://www.ul.com/
File details come from the government source that posted it. Updated .