Atch 4 - Design Analysis _MUHJ 25-4026 Repair Building Envelope Facility 703.pdf
PDF 6 MB Posted
- Attached to
- Joint Base Langley - Eustis (JBLE) - Langley AFB, VA, Repair Building Envelope, Facility 703
- Solicitation number
- FA480025B0005
About this file
This document is a Design Analysis for the repair of the building envelope at Facility 703 on Langley Air Force Base, prepared by DJG Inc. The project involves comprehensive exterior improvements, including selective roof repair, replacement of downspouts and gutters, exterior masonry repairs with pointing and pre-cast concrete panel restoration, and basement window replacements. Additional site work encompasses selective landscaping demolition, creating a new muster pad near the main entrance, installing basement waterproofing with perimeter foundation drainage, storm drainage systems, and a new fire service waterline.
The design analysis covers multiple technical aspects, including erosion and sediment control, stormwater management, vegetation removal, and utility modifications. Specific technical interventions include grading turf areas to improve drainage, installing 6" PVC roof drain piping, implementing perforated underdrain piping with a stone reservoir, and removing vegetation within 33 feet of the building to comply with Antiterrorism and Force Protection guidelines. The project is scheduled for completion by July 31, 2026, with various phases including procurement, site demolition, construction, and testing and commissioning, and is estimated to cost between $1,000,000 and $5,000,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN ANALYSIS
REPAIR BUILDING ENVELOPE,
ACC/DSF, FACILITY 703
MUHJ 25-4026
LANGLEY AIR FORCE BASE, VA
100% SUBMISSION
JUNE 19, 2025
DJG #2250280-A
DESIGN LIKE YOU MEAN IT!
449 McLAWS CIRCLE ● WILLIAMSBURG, VA ● 23185 ● 757-253-0673
1620 HILLSBOROUGH STREET, SUITE 100 ● RALEIGH, NC ● 27605 ● 984-288-1300
Design Analysis
JBLE – Langley Facility 703
MUHJ 25-4026
TABLE OF CONTENTS
Tab A Basis of Design
Tab B Submittal Register
Tab C Warranty Schedule
Tab D Construction Schedule
Tab E Hazardous Report
DJG# 2250280A Page 1 of 12 June 19, 2025
BASIS OF DESIGN
JBLE – Langley Facility 703 Repair Building Envelope
Project MUHJ 25-4026
Executive Summary
General Description
Facility 703 is an existing administrative office building situated between Dodd
Boulevard, Ward Road, and Andrews Street in the historic area of Joint Base Langley-
Eustis in Hampton, Virginia. The gross area of the building’s footprint is approximately
13,650 square feet. The total square footage of the building is 54,600 and includes a basement and three floors. The building houses administrative offices and support spaces on the first, second, and third floors. The building’s basement is currently unoccupied and unfinished. During the life of the facility an elevator addition has been constructed near the center of the original building to comply with accessibility requirements.
The scope of work for this project is to include exterior improvements to the building.
Work includes selective roof repair, replacement of all downspouts and gutters, exterior masonry repairs to include pointing and pre-cast concrete panel repairs. Windows at the basement level will be replaced. Exterior site work includes selective demolition of the existing landscaping, creating a new muster pad adjacent the main entrance walks, new basement subgrade waterproofing with perimeter foundation drainage, storm drainage to capture the new downspouts, and a new fire service waterline to serve the facility. New ancillary concrete stoops and landings shall be constructed at the new egress points from the renovated facility.
Site Work
Existing Conditions
Topography/Stormwater
Survey of the site indicates that the finished floor elevation of the first floor is +/- 9.00’.
The surrounding site is at approximately elevation 4.5’ – 5.5’ and is very flat. Stormwater flows via sheet flow to catch basins and curb drop inlets in parking lots to the northeast and southwest of the facility.
Indicative of many buildings on LAFB, ground water is seeping into the basement of
Facility 703, and areas adjacent to the facility remain wet for extended periods of time.
The basement of the facility currently contains two sump pumps that discharge into the base sanitary sewer system. There are several sump pumps in prefabricated sump vaults with concrete collars located around the perimeter of 703. The basement has two floor
DJG# 2250280A Page 2 of 12 June 19, 2025
Project MUHJ 25-4026 elevations, with ceiling from 8’-3” in height to 14’ in height. Accounting for the first-floor slab, the lowest basement elevation is estimated to be at approximately elevation
-6.00’ and the higher elevation is 0.50’.
There are aluminum downspouts on the building that discharge to grade onto splash blocks.
Vegetation
There are sporadic foundation plantings and screen plantings in front of mechanical equipment adjacent to the building that do not comply with Antiterrorism and Force
Protection Unified Facilities Criteria, section 3-2.1.1, Unobstructed Space. This section states that an unobstructed space of 33 feet surrounding the buildings shall be provided. This area shall not contain any obstructions, vegetation, or structures that could potentially conceal an explosive ordinance eight inches in height.
Utilities
An existing water main is located approximately 50’ from the northwest side of Facility
703, running parallel with the building. The building is currently not sprinkled. Domestic water enters the building at the south corner.
Gravity sanitary sewer surrounds the northwest, north, and southeast sides of the building. The building’s sanitary sewer leaves the facility at the northwest corner and outfalls into a sanitary manhole located northwest of the building.
A natural gas line with a gas meter enters the building on the east side.
Pavement
There are asphalt parking lots 20’ to the northeast of Facility 703 and 100’ southwest of the facility. A small asphalt parking lot and concrete mechanical equipment pad surround Facility 700 located approximately 60’ west of Facility 703.
Concrete sidewalks connect primary entrances on the northeast and southwest sides of the building to the parking lots. There is a concrete sidewalk parallel to the building and parking lot on the northeast side, and parallel to the building on the northwest side, connecting to the concrete sidewalk leading to the main southwest entrance.
DJG# 2250280A Page 3 of 12 June 19, 2025
Project MUHJ 25-4026
Design Solution
General
Site work for this project shall include waterproofing the foundation, providing an underdrain system adjacent to the basement wall, and providing storm drain piping to convey stormwater from new downspouts and the new underdrain system to the existing storm drain system.
Erosion and Sediment Control
Erosion and sediment control will be required to be provided in accordance with
Virginia DEQ code requirements, Minimum Standards 1-19, and the Virginia Erosion and
Sediment Control Handbook.
Silt fence will be required downstream of all earth disturbance. A construction entrance or wash rack will be required to prevent tracking of sediment and soil off site. A concrete washout shall be required on site. Temporary seeding will be required if graded areas are left undisturbed for 14 days.
Constant dewatering of excavations for new building foundation underdrains and utility trenching is anticipated due to the high groundwater table in the area. All dewatering shall pass through a sediment filter prior to discharging off site.
Stormwater
Turf areas adjacent to the foundation will be graded to increase slope away from the building.
New 6” PVC roof drain piping shall be connected to downspout boots and discharge into the existing storm drain system. Area drains shall be provided at low points adjacent to the building to relieve ponding stormwater. Cleanouts in traffic rated boxes will be provided at the upstream ends of long storm pipe runs.
New perforated underdrain piping in a stone reservoir shall be provided adjacent to the building foundation. Most of this underdrain system will discharge into a prefabricated vault that will house a duplex sump pump to discharge stormwater at a new inlet via a force main. A portion of this underdrain system at the lower basement elevation shall discharge into the interior sump pump assembly at the northeast corner of the building where it will eventually be pumped into the storm sewer system. Backwater valves will be provided on outfall piping to the existing storm system.
DJG# 2250280A Page 4 of 12 June 19, 2025
Project MUHJ 25-4026
Vegetation
Trees and shrubs that are located within 33’ of the building and do not comply with
“Antiterrorism and Force Protection Unified Facilities Criteria, section 3-2.1.1, Unobstructed Space” shall be removed. The existing foundation plantings will be removed to accommodate the new work.
New foundation plantings and mechanical equipment screening plants that permit visibility beneath them shall be provided in hardwood mulch beds.
Pavement
Existing concrete sidewalks will be removed and replaced to provide the new storm drain system and grade to ensure positive drainage away from the building.
The existing brick paving rear of the building shall be removed and reinstalled to provide sanitary sewer and storm sewer utility lines and connections.
The existing exterior metal stairs in the courtyard area shall be removed and replaced with concrete stairs. Concrete pavement shall be removed and to install the concrete stairs.
Utilities
Sleeves shall be installed at the basement wall for both the new domestic water and fire water line installation under the future renovation project.
A gravity sanitary sewer lateral shall be installed through the building courtyard and wye into an existing sanitary sewer piping. Cleanouts shall be provided at all changes in pipe direction.
Architectural
Existing Conditions
The existing Facility 703 is constructed of cast-in-place structural concrete system including columns, beams, and floor slabs with exterior masonry mass walls and a steep-sloped, wood-framed roof. An elevator addition is constructed of CMU and is located between the two sets of covered exterior steel stairs on the north face of the building.
The exterior steel stairs are constructed of steel stringers with concrete-filled steel pan stair treads and show significant corrosion and deterioration. Steel guardrails and handrails are present along each stair tower. A steel guardrail with square pickets lines the perimeter of the outdoor covered areas on each floor.
DJG# 2250280A Page 5 of 12 June 19, 2025
Interior
The building’s basement is currently unoccupied and unfinished. Periodic flooding has created significant moisture problems in the basement. Standing water is present in limited areas and signs of previous flood events are visible throughout. Existing steel surfaces, including door frames and ceiling-mounted pipe supports, are severely rusted.
Existing paint is peeling on all surfaces.
New Work
Exterior
The sloping terracotta roof over the main building of Facility 703 shall remain and be repaired only where necessary. The prefinished metal gutters and downspouts located along the building’s eaves shall be replaced with copper gutters and downspouts.
Exterior brick and cast stone repointing will occur on all existing facades. New brick mortar color to be specified and sympathetic to the original and existing facades to meet SHPO guidelines.
Windows
The existing windows at the basement will be completely removed and replaced with new fixed aluminum windows to meet the current AT/FP requirements and to provide better insulation and acoustical performance. The basement windows will not have window treatments.
Hazardous Materials
Bulk samples of suspect ACM and existing paints were collected from visibly accessible materials expected to be disturbed by the renovation/demolition work. Destructive activities such as breaking into wall cavities or entering confined spaces were not performed.
In September 2020 and May 2023, GER collected 75 bulk samples of suspect ACM from
FAC. 703. Materials which were sampled included CMU block filler, drywall/joint compound, plaster, floor tile/mastic, sheet flooring, base cove/mastic, suspended acoustical ceiling tiles, mastics, sealants, and roofing materials.
Based on laboratory results and field observations, the following materials were reported to contain asbestos or assumed:
Waterproofing behind exterior brick (assumed ACM)
DJG# 2250280A Page 6 of 12 June 19, 2025
Abatement Considerations: All friable and non-friable asbestos-containing materials to be disturbed must be removed by a Virginia licensed asbestos abatement contractor prior to renovation.
Lead, Cadmium, and Chromium
In September 2020, GER collected 5 paint chip samples from existing painted surfaces.
The purpose of the sampling was to obtain representative data on the concentrations of lead, cadmium, and chromium in the existing painted surfaces scheduled to be disturbed by the renovation/demolition. Laboratory results show samples collected and analyzed were found to have lead, cadmium, and chromium concentrations above the laboratory's minimum detection limit. The painted ships ladder leading to the attic was identified as LBP.
Abatement Considerations: As the results indicate, all samples were determined to contain lead, cadmium, and chromium concentrations. Therefore, all painted surfaces must be considered lead, cadmium, and chromium-containing. Appropriate precautions should be taken during the disturbance of all painted surfaces to ensure the protection of workers and the environment as established by OSHA for lead.
Waste Stream Classification
EPA Resource Conservation and Recovery Act (RCRA) regulations define the TCLP limits for leachable metals. Laboratory results with metal concentrations above the TCLP limit classify the generated waste as hazardous. Waste that equals or exceeds the RCRA limit must be transported to a hazardous waste treatment, storage, or disposal facility.
Laboratory results indicate that the TCLP concentrations of lead are below the RCRA
TCLP limits; therefore, we anticipate that all generated waste will be nonhazardous.
Structural
Facility 703 is a historic building constructed circa 1932 as a barracks. This facility is currently utilized as an office/administrative building. The existing three-story structure consists of concrete and masonry foundation walls enclosing an existing basement, masonry exterior walls, concrete two-way elevated floor slabs, concrete exterior balconies, and a wood framed roof. The purpose of the project is to renovate and repair the existing facility to create state-of-the-art office space.
DJG# 2250280A Page 7 of 12 June 19, 2025
Project MUHJ 25-4026
Repairs to Existing Exterior Walls
As part of the renovation project, the repairs will be specified to the exterior brick veneer, windows, flashings, and other exterior elements in need of repairs. Structural repairs will be specified as needed to facilitate the architectural remedial repairs.
Fire Protection Systems
Automatic Fire Sprinkler System
The existing building is not protected by a fire sprinkler system. A new sprinkler system is planned to be provided throughout the building under a separate project.
Fire Protection Water Supply
Currently, the building has no fire protection water supply. Refer to the Site Work
(Utilities) section of this report regarding the new water line that will be provided to support the future building fire sprinkler system.
The fire protection water supply, including fire hydrants, serving the buildings is required to comply with UFC 3-600-01 Chapter 9-3.
Water supply test information was supplied by Bowman Fire & Life Safety, Inc.
Location: Ward Rd & Sweeney Blvd
Date: 06/18/2024
Static: 64 pounds per square inch
Residual: 59 pounds per square inch
Flow: 1,130 gallons per minute
In accordance with NFPA 1 Table 18.4.5.2.1, the required fire flow for a 55,000-square foot Type III (200) building is 5,000 gallons per minute for 4 hours. A 75% reduction is allowed by the exception under NFPA 1 Section 18.4.5.3.2 for a building protected throughout by an approved automatic sprinkler system. If the building is protected throughout with a sprinkler system, the minimum resulting fire flow of 1,250 gallons per minute for 1 hour is required. A flow test conducted at the site indicates an available supply of 3,657 gallons per minute at 20 pounds per square inch.
Plumbing and Mechanical
The plumbing and mechanical work for Phase A primarily consists of waterproofing the sub-grade exterior walls and installing a foundation drain system. There are currently several existing piping and conduit penetrations in the basement walls that are
DJG# 2250280A Page 8 of 12 June 19, 2025 contributing to the water leaks into the basement.
Additionally, the basement contains several water mitigation systems such as sump pumps and dehumidifiers which must remain operational during any repairs. Several of these pumps and dehumidifiers discharge immediately outside of the exterior walls above grade onto concrete splash blocks.
On the eastern side of the facility lies the point of entry for the facility natural gas and geothermal systems as well as the point of exit for the boiler flue. Additionally, there are seven split-system heat pumps located on a steel platform approximately 5ft from the exterior wall and have linesets that enter the building through the basement. While most of the services exit the basement above grade, the sanitary main, geothermal piping, and natural gas piping are underground.
Exterior to the building, there is also a buried PVC irrigation system that encroaches on the space needed to install a foundation drain system.
In order to provide a new foundation drain system and waterproof the foundation, a trench will need to be dug around the perimeter of the building. There are currently several systems and piping that will need to be relocated temporarily in order to perform this that include:
• Natural gas main and gas meter
• Seven heat pumps and their associated linesets, controls and power circuits
• Domestic water service entrance (valve box)
• Several Irrigation valve boxes and associated piping
Other systems, such as the sanitary and geothermal systems, will need to be worked around as relocation is not feasible.
New piping sleeves will be installed through the basement’s exterior wall for existing systems and future renovation work anticipated in Phase B. The basement wall will be penetrated for new pipe sleeves at elevations appropriate to support future utility service. For existing piping, a split-field-welded steel pipe sleeve system will be utilized along with EDPM/stainless steel link-seal systems. New/future piping sleeves will be constructed of High-Density Polyethylene (HDPE) and extend 12” on both sides of the basement wall and be capped/sealed watertight. New/future piping sleeve will need to be large enough to accommodate the anticipated piping and a system appropriate link-seal system. All penetrations located lower than 4’-0” above grade will
DJG# 2250280A Page 9 of 12 June 19, 2025 need to be sealed with a sleeve and link-seal to help mitigate damage from flooding.
A new foundation drain system and duplex grinder pump will be installed to relocate water away from the foundation. The foundation drain will drain into the basin of the pumping system with a direct pipe connection. Additionally, the north-eastern most sump pump located in the basement will need its concrete basin piped directly through the foundation into the foundation drain (with a backwater valve). This will involve saw cutting the basement slab in order to reach the appropriate depth.
Electrical
All the existing electrical and telecommunications infrastructure will remain during this project unless otherwise noted. The existing electrical system currently serving the building is a 1200A, 480Y/277V, 3phase, 4-wire electrical service. This electrical is to remain as present with minor alterations to service the new loads as identified in the construction documents.
This project has minor telecommunications scope, which is identified below and on the construction drawings.
All interior panelboards, distribution equipment, lighting, wiring devices, conduit, and conductors will remain as at present unless otherwise noted. The interior power system shall meet the recommendations and criteria set forth in the following codes and standards:
Life Safety Code (NFPA 101)
National Electrical Code (NEC)
UFC 3-501-01 “Electrical Engineering”
UFC 3-520-01 “Interior Electrical Systems”
All wiring shall be individually insulated conductors installed in conduit unless otherwise noted. All conduit routed outdoors above grade shall be galvanized rigid steel conduit;
conduit routed outdoors below grade will be schedule 40 PVC. Conduit routed within the building will be electrical metallic tubing, IMC, or RMC. Fused disconnect switches will be heavy-duty type and utilize Class R fuses. The electrical design will be in
DJG# 2250280A Page 10 of 12 June 19, 2025
Project MUHJ 25-4026 accordance with the latest UFC criteria and the 2023 National Electrical Code (NEC) requirements and other specific criteria as required.
Panelboards
Existing panelboards will be reused to serve new loads as indicated on the construction drawings. New circuit breakers will be provided in existing panelboards as required to serve the new loads.
Light Fixtures
This project does not have any lighting scope:
The existing lighting fixtures and controls shall remain as at present.
Convenience Receptacles, Switches, & Other Devices
Outlets will be located 36” above the finished floor, unless otherwise noted. Device cover plates shall be single or multiple gang and shall have suitable cutouts to fit the devices being covered. For surface mounted devices provide steel surface box covers.
Receptacles shall be specification grade, duplex, grounding, three-wire type rated 20 amperes at 125 volts
Boxes exterior to the building will be while in-use type plated cast alloy, heavy duty, weatherproof, dustproof, with gasket, plated iron alloy cover. Receptacles on the outside of the building shall be weather resistant and GFCI type.
Motor Controllers and Disconnect Switches
Disconnecting means shall be provided for all motor loads within line of sight per the
NEC. Disconnect switches shall be heavy duty type with the appropriate voltage and
HP ratings. Where fused disconnect switches are provided the fuses shall be class RK1 or
RK5 type fuses. Fuse sizes shall be in accordance with the load nameplate data.
Disconnect switches located indoors shall be provided with a NEMA 1 enclosure.
Disconnect switches located outdoors shall be provided with a NEMA 3R enclosure.
Wiring
Copper shall be used for all feeders. Conductors shall be solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.
Feeder conductors will be sized to limit voltage drops to 2 percent. Branch circuit conductors will be sized to limit voltage drop to 3 percent from each branch circuit panelboard to the center of its load. Combination of feeders and branch circuit
DJG# 2250280A Page 11 of 12 June 19, 2025
Project MUHJ 25-4026 conductors will be sized to limit total voltage drop to 5 percent. Voltage drop will be calculated based on connected load.
All circuits required by NEC to be grounded shall be provided with green wire ground.
Electrical services, circuits and systems, enclosures and equipment shall be grounded in accordance with Article 250 of the National Electrical Code.
Conduit, Raceways, & Support Structures
Electrical metallic tubing (EMT) or rigid galvanized steel conduit shall be used for wiring, unless otherwise noted. Flexible conduits will be allowed for connection of equipment subject to vibration, noise transmission or movements and all motors, recessed and semi-recessed light fixtures. Maximum length of flexible conduit shall not exceed 6 feet in accordance with NEC limitations. Flexible conduits shall not be used where subject to mechanical damage. Ground conductor shall be carried through all conduits. Flexible liquid tight metallic conduit will be utilized in interior wet locations and all exterior locations requiring flexible connections. MC cable may be utilized for flexible connections indoors limited to 6 feet in length or fished down existing walls. Schedule 40
PVC conduit will be used for outdoor underground runs.
Rigid metal conduit (RMC) will be electro-galvanized or hot-dipped galvanized and will conform to UL 6. Fittings for rigid steel conduit will be threaded type. Minimum size EMT and RMC will be 1/2”.
Communications
Access Control and Intrusion Detection Systems
This project does not have any access control system scope of work. The existing access control system will remain as at present.
The project does not have any intrusion detection system scope of work. The existing
Intrusion Detection System (IDS) will remain as at present.
Telecommunications System
General
The existing telecommunications system will remain as at present. This project will require a high-water-level alarm signal to be transmitted utilizing an ethernet connection.
DJG# 2250280A Page 12 of 12 June 19, 2025
Video Teleconference:
This project does not have any video teleconferencing scope of work, and the existing system will remain as at present.
Cable Television System (CATV)
This project does not have any CATV scope or work, and the existing system will remain as at present.
Grounding and Surge Protection
The Building’s existing grounding electrode system and bonding is to remain as at present.
Existing surge protection will remain as at present.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES
MUHJ 25-4026 Repair Building Envelope, ACC/DSF, F.703
01 20 00 SD-01 Preconstruction Submittals
1.3Schedule of Prices
01 30 00 SD-01 Preconstruction Submittals
1.4View Location Map
1.5Progress and Completion
Pictures
SD-04 Samples
1.3Color Boards
01 32 17.00 20 SD-01 Preconstruction Submittals
Construction Baseline NAS
1.8Designated Project Scheduler
SD-07 Certificates
1.3Weekly Look Ahead Schedule
1.4.1Monthly Network Analysis
Updates
SD-11 Closeout Submittals
1.4.2As-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.7Submittal Register
01 33 29 SD-01 Preconstruction Submittals
Preliminary High Performance and Sustainable Building Checklist
1.4.1Sustainability Action Plan
SD-11 Closeout Submittals
Final High Performance and
Sustainable Building Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES
01 33 29 Final Sustainability eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.9Accident Prevention Plan (APP)
Final IAQ Management Plan
1.16Indoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
Accident Reports
1.13.2LHE Inspection Reports
1.5Monthly Exposure Reports
SD-07 Certificates
1.8.6Crane Operators/Riggers
1.10Activity Hazard Analysis (AHA)
1.13.3Certificate of Compliance
1.6Contractor Safety Self-Evaluation
Checklist
1.14Hot Work Permit
License Certificates
1.13.3Standard Lift Plan
01 45 00 SD-01 Preconstruction Submittals
1.5.2Contractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.4.1Certificate Of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES
01 50 00 SD-01 Preconstruction Submittals
1.3Construction Site Plan
3.3.1Traffic Control Plan
2.2.1Haul Road Plan
1.5.1.4Contractor Computer
Cybersecurity Compliance
Statements
1.5.6Contractor Temporary Network
Cybersecurity Compliance
Statements
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.5Warranty Tags
3.6Final Cleaning
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.5Operation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
3.4As-Built Record of Equipment and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES
01 78 00 1.6.1Warranted Equipment and
Materials
3.2Final Approved Shop Drawings
3.3Construction Contract
Specifications
Certification of EPA Designated
Items
Certification Of USDA Designated
Items
3.7.1Interim DD FORM 1354
3.7.2List Of Installed Building
Equipment Items For DD Form
01 78 23 SD-10 Operation and Maintenance
Data
1.4Facility Data Workbook
3.1.1Training Plan
3.1.3Training Outline
3.1.2Training Content
3.2.1Operation And Maintenance
Manual, Progress Submittal
3.2.2Operation And Maintenance
Manual, Prefinal Submittal
3.2.3Operation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES
01 78 23 3.1.4Training Video Recording
3.1.6Validation of Training Completion
3.1.1Training Plan
1.6.6.7As-Built Drawings And Utility
Systems
01 78 24.00 10 SD-01 Preconstruction Submittals
1.5.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
3.1Facility Data Workbook, Construction Progress
3.1Facility Document Set, Construction Progress
SD-11 Closeout Submittals
Facility Data Workbook, Construction Final
1.5.3Facility Document Set, Construction Final
3.2Facility Document Set, Construction Final
01 91 00.15 SD-05 Design Data
Design Phase Commissioning
Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES
01 91 00.15 3.5Completed Construction
Observation Checklists
3.4Interim Construction Phase
Commissioning Plan
3.4Final Construction Phase
Commissioning Plan
3.10Initial Commissioning Report
1.14Issues Log
SD-07 Certificates
1.10Commissioning Firm
SD-10 Operation and Maintenance
Data
3.9Maintenance and Service Life
Plan
3.8Systems Manual
SD-11 Closeout Submittals
3.10Final Commissioning Report
3.10Final Commissioning Report
3.11Updated Final Commissioning
Report
3.10 SFinal Commissioning Report
(eNotebook)
02 41 00 SD-01 Preconstruction Submittals
1.2.2Deconstruction Plan
1.9Existing Conditions
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES
02 41 00 1.6Notification
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.10Safety Data Sheets (SDS) for All
Materials
2.1Encapsulants
3.1.2.1Respirators
3.1.7Local Exhaust Equipment
3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10Glovebags
SD-06 Test Reports
1.5.5Air Sampling Results
1.5.6Pressure Differential Recordings for Local Exhaust System
3.2.12.4Clearance Sampling
3.3.3.2Asbestos Disposal Quantity
Report
SD-07 Certificates
1.3.5Employee Training
1.3.6Notifications
1.3.8Respiratory Protection Program
1.3.11Asbestos Hazard Abatement Plan
1.3.12Testing Laboratory
1.3.13Landfill Approval
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES
02 82 00 1.3.13Delivery Tickets
1.3.13Waste Shipment Records
1.3.14Transporter Certification
1.3.15Medical Certification
1.5.1Private Qualified Person
Documentation
1.5.2Designated Competent Person
1.5.3Worker's License
1.5.4Contractor's License
1.5.7Federal, State or Local Citations on Previous Projects
2.1Encapsulants
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SD-11 Closeout Submittals
1.3.6Permits and Licenses
1.3.6Notifications
1.3.8.1Respirator Program Records
1.7.1Rental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1Competent Person
1.5.1.2Training Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES
02 83 00 1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.4Medical Examinations
1.5.2.8Lead, Cadmium, Chromium
Waste Management Plan
1.5.3Licenses, Permits and
Notifications
1.5.4Occupant Protection Plan
1.5.2.2Lead, Cadmium, Chromium
Compliance Plan
3.4.1.1Initial Sample Results
3.5.2.1Written Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
2.1Materials and Equipment
2.1.1Expendable Supplies
SD-06 Test Reports
1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.3Sampling Results
SD-07 Certificates
1.5.1.3Testing Laboratory
1.5.1.4Third Party Consultant
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES
02 83 00 3.5.1.1Clearance Certification
SD-11 Closeout Submittals
3.5.2.1Hazardous Waste Manifest
3.5.2.1Turn-In Documents or Weight
Tickets
03 01 00 SD-01 Preconstruction Submittals
1.5.3Qualifications
1.5.5Work Plan
1.6.1Work Plan
1.5.2Quality Control Plan
SD-03 Product Data
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-05 Design Data
3.1.3Formwork And Shoring
1.5.1Repair Procedures
2.8Mixture Proportioning
SD-06 Test Reports
2.8Mixture Proportioning
3.1.5Quality Control
3.2.3Quality Control
3.3.3Quality Control
2.5Conventional Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES
03 01 00 2.7Miscellaneous Materials And
Equipment
SD-07 Certificates
1.5.3Qualifications
2.5Conventional Concrete
SD-08 Manufacturer’s Instructions
2.2Equipment For Concrete
Preparation
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
04 03 00 SD-01 Preconstruction Submittals
1.5.1Quality Control Plan
1.5.1Project Training Program
1.5.2Qualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1Structural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6Cleaning and Restoration
Methods
2.1Cleaning Materials
2.1.4Biocides
2.2.2.2Replacement Mortar And Stucco
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES
04 03 00 2.4Mortar Mix
3.4.8.3Water Repellents Infiltration
3.4.8.4Stone Consolidants
SD-04 Samples
1.5.7.1Mock-ups
SD-05 Design Data
3.5.1Structural Upgrades
SD-06 Test Reports
2.2.2.1Testing and Matching
3.5.2Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
04 20 00 SD-03 Product Data
1.5.1Hot Weather Procedures
1.5.2Cold Weather Procedures
2.2.2Clay or Shale Brick
Salvaged Brick
Cement
2.4.1.1Cementitious Materials
SD-04 Samples
2.2.2Clay or Shale Brick
SD-05 Design Data
2.1.2Masonry Compressive Strength
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES
04 20 00 SD-07 Certificates
2.2.2Clay or Shale Brick
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
Take-Back Program
SD-11 Closeout Submittals
SClay Units
SRecycled Content
05 05 20 SD-01 Preconstruction Submittals
1.5.1.1Installer Qualifications
1.5.1.2Post-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3Mechanical Anchors in Concrete
2.1.1.4Adhesive Anchor System in
Concrete
3.1.3Non-Shrink, Non-Metallic Grout
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES
05 05 20 3.3.4Post-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1Post-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2Manufacturer's Printed
Installation Instructions
3.1.3Non-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
06 10 00 SD-03 Product Data
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
2.3.1.2Structural-use and OSB Panels
2.3Oriented Strand Board
2.4.3Adhesives
SD-07 Certificates
1.7Preservative Treatment
07 19 00 SD-03 Product Data
2.2Water Repellents
SD-06 Test Reports
1.3.2Water Absorption
1.3.2Accelerated Weathering
1.3.2Resistance to Chloride Ion
Penetration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES
07 19 00 1.3.2Moisture Vapor Transmission
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's Qualifications
1.3.1Applicator's Qualifications
1.12Warranty
SD-08 Manufacturer’s Instructions
3.4Application
1.7.1Safety Data Sheets
07 27 36 SD-01 Preconstruction Submittals
1.7.1Qualification of Manufacturer
1.7.2Qualification of Installer
1.8Safety Plan
1.6.1Fire Prevention Plan
1.6.2Respiratory Protection Plan
SD-02 Shop Drawings
1.4.1Spray Foam Air Barrier System
Shop Drawings
Fire-Rated Assemblies
SD-03 Product Data
2.1.5Blowing Agents
2.1.2Closed Cell
2.2Primers, Adhesives, and Mastics
2.4Sealants
1.4.2Safety Data Sheets
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES
07 27 36 3.2.1Substrate Preparation
1.4.2Manufacturer's Printed
Installation Instructions for
Primers, Adhesives, and Mastics
07 60 00 SD-02 Shop Drawings
3.1.12Gutters
3.1.13Downspouts
3.1.10Base Flashing
3.1.17Flashing at Roof Penetrations and Equipment Supports
3.1.14Open Valley Flashing
3.1.15Eave Flashing
SD-03 Product Data
Cool Roof
SD-08 Manufacturer’s Instructions
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES
07 84 00 1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
08 51 13 SD-02 Shop Drawings
2.1Windows
1.6Fabrication Drawings
SD-03 Product Data
2.1Windows
2.2.2Fasteners
1.7Window Performance
2.4Mullions
2.2.7Accessories
1.7.4Thermal Performance
SD-04 Samples
1.3.3.1Finish Sample
SD-06 Test Reports
Standard Airblast Test
STC
SD-10 Operation and Maintenance
Data
2.1Windows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES
08 81 00 SD-03 Product Data
2.2Insulating Glass
1.4Spandrel Glass
1.3Glazing Accessories
2.3.3.1Sealants
2.3.4Joint Backer
SD-04 Samples
2.2Insulating Glass
1.4Spandrel Glass
SD-07 Certificates
2.2Insulating Glass
1.8STC Rating
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
1.7.2Monolithic Opacified Spandrel
09 90 00 SD-03 Product Data
2.1Coating
2.1Product Data Sheets
3.2.5Sealant
SD-04 Samples
2.2Color
SD-07 Certificates
Applicators Qualifications
1.6.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES
09 90 00 1.8.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
22 00 00 SD-02 Shop Drawings
Plumbing System
SD-03 Product Data
1.6.1Welding
Plumbing System
SD-07 Certificates
1.4Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
Plumbing System
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2Record Drawings
1.2Connection Diagrams
1.2Coordination Drawings
1.2Fabrication Drawings
3.1Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES
23 05 15 2.1Pipe and Fittings
2.2Piping Specialties
2.3Valves
2.4Miscellaneous Materials
2.5Supporting Elements
1.2Equipment Foundation Data
SD-04 Samples
1.2Manufacturer's Standard Color
Charts
SD-05 Design Data
2.1Pipe and Fittings
2.2Piping Specialties
2.3Valves
SD-06 Test Reports
3.1Hydrostatic Tests
3.1Air Tests
3.1Valve-Operating Tests
3.1Drainage Tests
3.1Pneumatic Tests
3.1Non-Destructive Electric Tests
3.1System Operation Tests
SD-07 Certificates
1.4.2Record of Satisfactory Field
Operation
1.4.3List of Qualified Permanent
Service Organizations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES
23 05 15 1.2Listing of Product Installations
1.2Records of Existing Conditions
3.1Temperature Ratings
SD-10 Operation and Maintenance
Data
Operation and Maintenance
Manuals
23 11 20 SD-02 Shop Drawings
1.5.3Gas Piping System
2.2Gas Piping System
3.3Gas Piping System
SD-03 Product Data
1.6.1Pipe and Fittings
1.5.3Gas Equipment Connectors
1.5.3Gas Piping System
2.2Gas Piping System
3.3Gas Piping System
2.1Pipe Coating Materials
Pressure Regulators
2.4Risers
2.2.8Transition Fittings
2.3Valves
2.2.4Warning and Identification Tape
SD-06 Test Reports
3.18Testing
3.18.1Pressure Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES
23 11 20 3.18.2Test with Gas
SD-07 Certificates
1.5.1Welders Procedures and
Qualifications
1.5.1Assigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
1.5.2PE Pipe and Fittings
2.1Pipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1Gas Facility System and
Equipment Operation
1.3.2Gas Facility System Maintenance
1.3.3Gas Facility Equipment
Maintenance
23 23 00 SD-02 Shop Drawings
2.3Refrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.4Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.4Refrigerant Piping Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES
23 23 00 SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5Maintenance
Operation and Maintenance
Manuals
Demonstrations
26 20 00 SD-03 Product Data
2.10Receptacles
Circuit Breakers
2.8Switches
SD-06 Test Reports
Ground-fault Receptacle
32 16 19 SD-03 Product Data
2.1Concrete
32 92 19 SD-07 Certificates
2.1Seed
32 93 00 SD-01 Preconstruction Submittals
1.4.2State Landscape Contractor's
License
1.6Time Restrictions and Planting
Conditions
SD-03 Product Data
2.6Mulch
2.9Root Control Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R…