Atch_3_Kirwin_Office_and_Storage_Submittals.pdf

PDF 95 KB Posted

Attached to
KS-KIRWIN NWR-REHAB HQ OFFICE & STORAGE
Solicitation number
140F0121R0090
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 1 OF 3

PROJECT NAME: Rehabilitation Headquarters Office and Storage Building ENGR. PROJECT NO.: 21-027 LOCATION: Kirwin NWR CONTRACT NO.:

CONTRACTOR:

Spec.

Section Number

Spec.

Paragraph No. Comments

012900 1.2.A.1 013100 1.3 013200 1.4 013233 1.2 013300 1.3 014000 1.4 015000 1.3 017419 1.3 017419 1.4 017700 1.3 017823 1.2 024119 1.4 & 1.5 061600 1.3 061200 1.2 070150 1.3 & 1.4

073113 1.3, 1.4, &

1.5 Asphalt Shingles

076200 1.3, 1.4, &

1.5 077253 1.2 & 1.3 079200 1.2 & 1.3 081113 1.03 085113 1.03 087100 1.2 08800 1.03 Glass & Glazing

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Schedule of Values Subcontract list and information Construction schedule Digital photos Submittal schedule Test agency information Erosion control plan Waste management plan

Finish Carpentry Preparation for Re-Roofing

Sheet Metal Flashing and Trim

Waste records Closeout documents O&M Manual Selective Demolition Sheathing

Snow Guards Joint Sealants Hollow Metal Doors and Frames Aluminum Windows Door Hardware

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.

SHEET 2 OF 3

PROJECT NAME: Rehabilitation Headquarters Office and Storage Building ENGR. PROJECT NO.: 21-027 LOCATION: Kirwin NWR CONTRACT NO.:

CONTRACTOR:

Spec.

Section Number

Spec.

Paragraph No. Comments

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

099100 1.02 230593 1.3 & 1.4 233113 1.3 & 1.4

235400 1.2, 1.3, &

1.4 260500 1.2

Testing, Adjusting, and Balancing for HVAC Painting

Metal Ducts

Furnances Common Work Results for Electrical

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.

Sheet1

File details come from the government source that posted it. Updated .