These are detailed utility and site drawings for the Visitor Education & Museum/Research Facility at Florissant Fossil Beds National Monument, dated 07/07/2010. The multi-page engineering drawings include comprehensive plans for grading, erosion control, storm drainage, sanitary systems, and utility modifications across the project site.
Key technical details include specific elevation grades, utility line configurations, construction limits, vehicle tracking areas, concrete washout zones, and precise measurements for sanitary sewer lines, water services, and electrical conduits. The drawings show intricate site planning around a visitor center, with careful consideration of existing terrain, construction boundaries, and infrastructure integration. Detailed notes emphasize contractor responsibilities for utility verification, minimum cover requirements for underground lines, and precise vertical and horizontal datum references based on state plane coordinates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_8_In_Scope_Update_0001.docx | DOCX document | |
| Atch_9_Questions_and_Answers_0001.docx | DOCX document | |
| Atch_11_Sign_In_Sheet_0001.pdf | ||
| Sol_140P1225Q0010_Amd_0001.pdf | ||
| Atch_10_Photos_0001.docx | DOCX document | |
| Atch_6_Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P1225Q0010.pdf | ||
| Atch_5_Experience_Questionnaire.xlsx | XLSX spreadsheet | |
| Atch_2_Specifications.pdf | ||
| Atch_4_Schematic_Design.pdf | ||
| Atch_1_EO_Deviation_FEB_2025.pdf | ||
| Atch_7_DOL_WD_CO20250028.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSuarez PolyLine
DSuarez PolyLine
DSuarez Line
DSuarez Line
DSuarez Line
DSuarez Line
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
DSuarez Ellipse
Ellipse
Highlight
DSuarez Highlight
DSuarez Ellipse
DSuarez Callout 3 site boulders
DSuarez PolyLine
DSuarez Line
DSuarez Ellipse
DSuarez Ellipse
DSuarez Callout Water, gas, elec below grade, no sanitary sewer
DSuarez Line
DSuarez Ellipse
DSuarez Ellipse
DSuarez Line
DSuarez Line
DSuarez Highlight
DSuarez Highlight
DSuarez Line
DSuarez Line
DSuarez Line
DSuarez Line
DSuarez PolyLine
DSuarez Highlight
DSuarez Highlight
DSuarez Highlight
DSuarez Line
Line
DSuarez Highlight
DSuarez Highlight
DSuarez Highlight
DSuarez Highlight
DSuarez Callout New concrete walk, connect to existing at ends
DSuarez PolyLine
DSuarez Line
DSuarez Line
DSuarez Callout Water, gas, elec below grade, no sanitary sewer off restroom?