Atch 2 Tab22-Drawing E-7C to G-2.pdf
PDF 2 MB Posted
- Attached to
- HAFB Boiler Control Maintenance
- Solicitation number
- 2024-PZI-1329
About this file
This document appears to be Attachment 2, Tab 22, Drawing E-7C to G-2 related to a federal contract opportunity for HAFB Boiler Control Maintenance.
The solicitation is for a contractor to provide all labor, tools, equipment, materials, supplies, parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA, to maintain the 4 dual fuel (natural gas and #6 oil) boilers at the central heating plant (B1201) in accordance with the Title V permit. The contractor must ensure all services and parts conform to the manufacturer's equipment specifications, federal/state law, and specific EPA and state regulations. The Performance Work Statement (PWS) is attached. The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base. No additional details about response dates, award, pricing, or set asides are provided in this attachment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .