Atch 2 - SOR Zadar Croatia.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Stevedoring & Related Terminal Services - Zadar, Croatia
Solicitation number
HTC71121QR015
Issued by

View the file

Other files

File Type Posted
HTC71121QR015 Amd 0002.pdf PDF
HTC71121QR015 Amd 0001.pdf PDF
Atch 5 - Q_As.pdf PDF
Atch 1 - PWS Zadar Croatia.pdf PDF
HTC71121QR015 Zadar Croatia.pdf PDF
Atch 4 - Tech Worksheet Zadar Croatia.docx DOCX document
Atch 3 - 21QR015 Information Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Definitions Controlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)

WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay Shift
Night shift
Regular8am to 5pm1st Shift
duty hours2nd Shift
3rd Shift
Regular OverBefore 8am and after 5pm4th Shift
Time (OT)
Swing / Hoot Owl
Meal HoursNoon to 1pm (may be premium meal hour)
6pm to 7-pmNormal work day hours
Midnight to 1am
6am to 7am** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

Summary

OFFEROR NAME:YOUR ORG NAME HERE
INSTRUCTIONS TO OFFEROR:
- Input Offeror Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to offer a price).
- Offeror should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for all Port LocationsControlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
3 Month
PORT OF ZADAR, CROATIA$ 10,500.00$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL $ 10,500.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

TOTAL ESTIMATED VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR PORT OF ZADAR, CROATIA $ 10,500.00

TOTAL EVALUATED VALUE OF ALL YEARS COMBINED FOR ALL PORT LOCATIONS$ 10,500.00
↓↓↓ PORT(S) SUMMARYS BELOW ↓↓↓
SUMMARY PORT OF ZADAR, CROATIAControlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
3 months
Schedule1A2DISCHARGE VESSEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1B3 LOAD TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1D DISPOSITION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1F INTRA PORT TRANSFER $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2 EXTRA LABOR $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3A DETENTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3B OVERTIME DIFFERENTIALS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 5 STORAGE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 6 FACILITIES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 8 MISCELLANEOUS $ 10,500.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 10 3PL SERVICES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

TOTAL $ 10,500.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

TOTAL EVALUATED PRICE PORT OF ZADAR, CROATIA $ 10,500.00

&"Times New Roman,Bold"&18&K00B050UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO

ZADAR, CROATIA

Controlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 Apr 2021through30 Jun 2021(including 6 mo extension, if applicable)
LOCATION:PORT OF ZADAR, CROATIAinput start dateinput final end date
Attachment #TOTAL COST ALL SCHEDULES PORT 1$ 10,500.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
1Commodity1A2DISCHARGE VESSEL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 06.00$ - 0
2Commodity1A2DISCHARGE VESSEL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 0250.00$ - 0
3Commodity1A2DISCHARGE VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
4Commodity1A2DISCHARGE VESSEL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
5Commodity1A2DISCHARGE VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 010$ - 0
6Commodity1A2DISCHARGE VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
7Commodity1A2DISCHARGE VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 01$ - 0
8Commodity1A2DISCHARGE VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 030$ - 0
9Commodity1A2DISCHARGE VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
10Commodity1A2DISCHARGE VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
11Commodity1A2DISCHARGE VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0100$ - 0
12Commodity1A2DISCHARGE VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
13Commodity1A2DISCHARGE VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
14Commodity1A2DISCHARGE VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
15Commodity1A2DISCHARGE VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
16Commodity1A2DISCHARGE VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0430$ - 0
17Commodity1A2DISCHARGE VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
18Commodity1A2DISCHARGE VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
19Commodity1A2DISCHARGE VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
20Commodity1A2DISCHARGE VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
21Commodity1A2DISCHARGE VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 01$ - 0
22Commodity1A2DISCHARGE VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
23Commodity1A2DISCHARGE VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
TOTAL - 1A2- Discharge Vessel$ - 0
24Commodity1A2aUNLASHING ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 06.00$ - 0
25Commodity1A2aUNLASHING ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 01$ - 0
26Commodity1A2aUNLASHING ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 01$ - 0
27Commodity1A2aUNLASHING ONLY60MEDIUM VEHICLES OR TRAILERSEA$ - 01$ - 0
28Commodity1A2aUNLASHING ONLY61LIGHT VEHICLES OR TRAILERSEA$ - 01$ - 0
29Commodity1A2aUNLASHING ONLY67HEAVY VEHICLES OR TRAILERSEA$ - 01$ - 0
TOTAL 1A2a Unlashing only$ - 0
30Commodity1B3LOAD TRUCKS40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 06.00$ - 0
31Commodity1B3LOAD TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 0250.00$ - 0
32Commodity1B3LOAD TRUCKS44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
33Commodity1B3LOAD TRUCKS44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
34Commodity1B3LOAD TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 010$ - 0
35Commodity1B3LOAD TRUCKS45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
36Commodity1B3LOAD TRUCKS45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 01$ - 0
37Commodity1B3LOAD TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 030$ - 0
38Commodity1B3LOAD TRUCKS60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
39Commodity1B3LOAD TRUCKS60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
40Commodity1B3LOAD TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 01$ - 0
41Commodity1B3LOAD TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
42Commodity1B3LOAD TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
43Commodity1B3LOAD TRUCKS61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
44Commodity1B3LOAD TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
45Commodity1B3LOAD TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 01$ - 0
46Commodity1B3LOAD TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
47Commodity1B3LOAD TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
48Commodity1B3LOAD TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
49Commodity1B3LOAD TRUCKS67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
50Commodity1B3LOAD TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 01$ - 0
51Commodity1B3LOAD TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 01$ - 0
52Commodity1B3LOAD TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01$ - 0
TOTAL 1B3 Loading Trucks$ - 0
53Commodity1DDISPOSITION ONLY CONVOY60MEDIUM VEHICLES OR TRAILERSEA$ - 01$ - 0
54Commodity1DDISPOSITION ONLY CONVOY61LIGHT VEHICLES OR TRAILERSEA$ - 0430$ - 0
55Commodity1DDISPOSITION ONLY CONVOY67HEAVY VEHICLES OR TRAILERSEA$ - 01$ - 0
TOTAL 1D Disposition ONLY$ - 0
56Commodity1FINTRA PORT TRANSFER40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)EA$ - 06$ - 0
57Commodity1FINTRA PORT TRANSFER44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 01$ - 0
58Commodity1FINTRA PORT TRANSFER45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 01$ - 0
59Commodity1FINTRA PORT TRANSFER60MEDIUM VEHICLES OR TRAILERSEA$ - 01$ - 0
60Commodity1FINTRA PORT TRANSFER61LIGHT VEHICLES OR TRAILERSEA$ - 01$ - 0
61Commodity1FINTRA PORT TRANSFER67HEAVY VEHICLES OR TRAILERSEA$ - 01$ - 0
TOTAL 1F Intra Port Transfer$ - 0
62Manhours2EXTRA LABOR (XL)[ Straight Time ] - GENERAL BASIC LABOR: LONGSHOREMAN | LASHER | LINE HANDLERS |HR$ - 01$ - 0
63Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (VEHICLE OPERATORS): FORKLIFT | DRIVER | FUEL TRUCK OPERATORHR$ - 01$ - 0
64Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 01$ - 0
65Manhours2EXTRA LABOR (XL)[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 01$ - 0
66Manhours2EXTRA LABOR (XL)[ Straight Time ] - CLERK | CHECKERHR$ - 020$ - 0
67Manhours2EXTRA LABOR (XL)[ Straight Time ] - CARPENTERHR$ - 01$ - 0
68Manhours2EXTRA LABOR (XL)[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 010$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
69Manhours3ADETENTION[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 0100$ - 0
70Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (VEHICLE OPERATORS): FORKLIFT | DRIVER | FUEL TRUCK OPERATORHR$ - 0100$ - 0
71Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 01$ - 0
72Manhours3ADETENTION[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 050$ - 0
73Manhours3ADETENTION[ Straight Time ] - CLERK | CHECKERHR$ - 050$ - 0
74Manhours3ADETENTION[ Straight Time ] - CARPENTERHR$ - 01$ - 0
75Manhours3ADETENTION[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 01$ - 0
TOTAL 3A Detention$ - 0
76Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 010$ - 0
77Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (VEHICLE OPERATORS): FORKLIFT | DRIVER | FUEL TRUCK OPERATORHR$ - 01$ - 0
78Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 01$ - 0
79Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 01$ - 0
80Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CLERK | CHECKERHR$ - 01$ - 0
81Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CARPENTERHR$ - 01$ - 0
82Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR$ - 01$ - 0
TOTAL 3B Overtime Differentials$ - 0
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
83Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3 LT capacityHR1EA$ - 01$ - 0
84Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3.01 LT - 7 LT capacityHR1EA$ - 01$ - 0
85Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 7.01 LT - 10 LT capacityHR1EA$ - 01$ - 0
86Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 10.01 LT - 15 LT capacityHR1EA$ - 01$ - 0
87Manhours4EQUIPMENT RENTAL (EQR)YARD TRACTOR (HUSTLER, YARD DOG)HR1EA$ - 01$ - 0
88Manhours4EQUIPMENT RENTAL (EQR)20 FOOT CONTAINER CHASSISHR1EA$ - 01$ - 0
89Manhours4EQUIPMENT RENTAL (EQR)40 FOOT CONTAINER CHASSISHR1EA$ - 01$ - 0
90Manhours4EQUIPMENT RENTAL (EQR)20 or 40 FOOT FLAT BED TRAILERS | MAFIs or MAFIs WITH PROBEHR1EA$ - 01$ - 0
91Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY MEDIUM TUG or TRACTORHR1EA$ - 01$ - 0
92Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY LARGE TUG or TRACTORHR1EA$ - 01$ - 0
93Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 80 LT capacityDY1EA$ - 01$ - 0
94Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 60 kilowattDY1EA$ - 01$ - 0
95Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 wattDY3EA$ - 02$ - 0
TOTAL 4 Equipment Rental$ - 0
96Miscellaneous5STORAGE Per MTON (if applicable)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS)DY1MTON$ - 06$ - 0
97Miscellaneous5STORAGE Per Container (if applicable)44CONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO PACKED W/ NON-EXPLOSIVESDY1EA$ - 010$ - 0
98Miscellaneous5STORAGE Per Container (if applicable)45MILVAN CONTAINER PACKED W/ NON-EXPLOSIVESDY1EA$ - 010$ - 0
99Miscellaneous5STORAGE Per Vehicle (if applicable)60LIGHT VEHICLESDY1EA$ - 01$ - 0
100Miscellaneous5STORAGE Per Vehicle (if applicable)61MEDIUM VEHICLESDY1EA$ - 01$ - 0
101Miscellaneous5STORAGE Per Vehicle (if applicable)67HEAVY VEHICLESDY1EA$ - 01$ - 0
TOTAL 5 Stotage$ - 0
102Miscellaneous6PORT FACILITIESOFFICE SPACE, PORTABLE | see PWS for specific detailsMTH1EA$ - 02$ - 0
103Miscellaneous6PORT FACILITIESMobile radio (5 channel)DY7LOT$ - 01$ - 0
104Miscellaneous6PORT FACILITIESTraffic ConesDY7LOT$ - 02$ - 0
105Miscellaneous6PORT FACILITIESPortable Latrines & hand washing staions see PWS for specific detailsMTH1EA$ - 04$ - 0
106Miscellaneous6PORT FACILITIESRefuse container | see PWS for specific detailsMTH1EA$ - 01$ - 0
107Miscellaneous6PORT FACILITIESOPEN STAGING AREA, hard stand, Lots, storage areas | see PWS for specific detailsDY1SQMT$ - 020,000$ - 0
108Miscellaneous6PORT FACILITIESCONTAINER WALL 20FT- 40FT CONTAINERS (combination of both)DY7EA$ - 020$ - 0
109Miscellaneous6PORT FACILITIESCONTAINER WALL 20'-40' Delivered, setup, and removal,EA$ - 020$ - 0
TOTAL 6 Facilities$ - 0
110Miscellaneous8MISCELLANEOUSOUT-OF-POCKET (Misc unknown charges)MTH3USD$ 3,500.001$ 10,500.00
TOTAL Miscellanious OOP$ 10,500.00
111Miscellaneous10CustomsCustoms Document ProcessEA$ - 020$ - 0
TOTAL 10 3PL Services$ - 0