Atch 2 - SOI - ANF SO HVAC Replacement.pdf

PDF 107 KB Posted

Attached to
Replace HVAC System at Angeles National Forest - Supervisors Office
Solicitation number
REQ1128763
Issued by

About this file

This document is a Schedule of Items (SOI) for a project to replace the HVAC system at the Angeles National Forest Supervisors Office. The key details are:

The project scope includes removing and replacing the existing HVAC system with a new in-kind system, including a 4-ton 17 SEER 2-stage AC condenser unit, new electrical components, and duct modifications. The work must be completed between 05/01/24 - 06/01/24. The contractor will be required to use a mobile crane to lift the new and old equipment to/from the rooftop. Disposal of the old equipment and refrigerant recovery/recycling are also part of the scope. The contract will be subject to the Service Contract Act for prevailing wages. The contractor must be registered in SAM to be eligible for this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NUMBER

DESCRIPTION

Method of Measure

QTY PRICE

1 Mobilization LS 1

Replacement of Exisiting HVAC System with System Described in the Statement of Work.

LS 1

3 Mobile Crane LS 1

SCHEDULE OF ITEMS

ANGELES NATIONAL FOREST

PROJECT TITLE: ANF SO HVAC MTCE

Period of Performance (Required for Services and A&E) 05/01/24 - 06/01/24

SCHEDULE OF ITEMS

TOTAL