This is a Schedule of Items (pricing template) for concrete vault toilet installations across three ranger districts within the Helena-Lewis and Clark National Forest.
The scope of work encompasses six line items distributed across three geographic areas: two toilet replacements in the Rocky Mountain Ranger District (Benchmark Airstrip Toilet and Ron Janicula Trailhead Toilet); one new toilet installation in the Judith Musselshell Ranger District (Highwood Cabin Toilet); and three items in the Helena Ranger District (two toilet replacements at Park Lake Day Use and Park Lake Campground North, plus concrete paving to replace asphalt at Park Lake). All items are priced on a lump sum basis with estimated quantities of one unit each. New installations include toilet supply, delivery, excavation, and complete installation of concrete vault toilet systems. Replacement work includes all new installation requirements plus pumping, demolition, and disposal of existing toilets. Offerors must submit pricing on all items to be considered responsive, rounded to the nearest cent. Bond premium payments are permitted under mobilization costs in accordance with FAR 52.232-5. Quantities provided are in-place only without shrinkage or swell factors applied, and contractors must verify all quantities. The schedule includes a project total line with space for cumulative pricing across all three ranger districts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240BH26Q0033 GAOA Concrete Vault Toilet Installation.pdf | ||
| Atch 4 Specifications.pdf | ||
| Atch 5 Drawings.pdf | ||
| Atch 6 Wage Determination.pdf | ||
| Atch 3 Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 – SCHEDULE OF ITEMS
Concrete Vault Toilet Installations
Rocky Mountain Ranger District
Judith Musselshell Ranger District Helena Ranger District
Helena-Lewis and Clark National Forest
ROCKY MOUNTAIN RANGER DISTRICT
Pay Estimated Pay Unit Item Item Item Description Type Quantity Unit Cost Cost
Benchmark Airstrip Toilet
Right 1 Lump Sum $ $
Replacement
Ron Janicula Trailhead Toilet
Right 1 Lump Sum $ $
Replacement
Total: $
JUDITH MUSSELSHELL RANGER DISTRICT
Item Item Description Type Quantity Unit Cost Cost
Highwood Cabin Toilet
Right 1 Lump
New Installation
HELENA RANGER DISTRICT
Item Item Description Type Quantity Unit Cost Cost
Park Lake Day Use
Left 1 Lump Sum $ $
Replacement
Park Lake Campground North
Left 1 Lump Sum $ $
Replacement
Park Lake Concrete Paving
1 Lump
Replace Asphalt
Project Total: $
ATTACHMENT 2 – SCHEDULE OF ITEMS
New installation: Toilet and material supply, delivery, excavation, and all other work required for a complete installation of a new concrete vault toilet system.
Replacement: All work required for a new installation, but with the addition of pumping, demolition, and disposal of an existing toilet.
NOTES:
1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items. Round to the nearest cent.
2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-
Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
3. Quantities are provided for information only and are in-place quantities. No shrinkage or swell factors have been applied. Contractor shall verify quantities.
4. Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract. If sufficient funds available, the government will exercise the option item(s) at award.
Price Quotation Furnished By:
Name: ______________________________ Phone: ______________________________
Address:_________________________________________________________________
E-mail:__________________________________________
UEI SAM#: ___________________________________
File details come from the government source that posted it. Updated .