This document is a Quality Assurance Surveillance Plan (QASP) for catered meal services under Solicitation Number W50S6V23Q0011 issued by the Department of the Army Colorado Army National Guard. The QASP establishes performance standards and monitoring methods for ensuring the contractor meets requirements to provide catered meals for the 140th Wing on an indefinite delivery indefinite quantity (IDIQ) contract. Key deliverables include preparation and delivery of meals by specified times with required food quality, variety, and portion sizes. Performance is subject to customer feedback and inspector monitoring and documentation using the forms provided in the attachments. The QASP defines acceptable quality levels and corrective action processes to address any deficiencies.

View the file

Other files for this federal contract opportunity

Other files attached to 140 FSS Catered Meals, newest first.
File Type Posted
Atch 1 - PWS Catered Meals W50S6V23Q0011_Updated 22 Sep 23.pdf PDF
Combo Synopsis-Solicitation W50S6V23Q0011.pdf PDF
Atch 1 - PWS Catered Meals W50S6V23Q0011.pdf PDF
Atch 3 - Wage Determination 2015-5419 Rev 24.txt TXT text file
Atch 4 - CLS Clause Export_W50S6V23Q0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Ver May 2018)

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

140th Catered Meals

For

140th Wing

5 September 2023 ii

TABLE OF CONTENTS

1 INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Contracting Officer’s Representative

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

5.2 Monitoring Forms

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.2 Reporting

6.3 Reviews and Resolution

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM ................. Error! Bookmark not defined.

(Ver. May 2018) 1

1 INTRODUCTION

This QASP is pursuant to the requirements listed in the performance work statement (PWS) entitled. This plan sets forth the procedures and guidelines the 140th Force Support Squadron (140th FSS) will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by 140th FSS to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.

The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS.

The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The Contracting Officer Representative (COR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance

(Ver. May 2018) 2 objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, cost control and for resolving any differences between the observations documented by the COR and the contractor. The KO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.

2.2 The COR

The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

Random monitoring, which shall be performed by the COR designated inspector.

Periodic Inspection – COR typically performs the periodic inspection on a quarterly basis.

Customer Complaint- investigated by the COR when received from customers

4.2 Customer Feedback

4.2.1 The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

4.2.2 Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR as opposed to the contractor.

(Ver. May 2018) 3

4.2.3 Customer complaints, to be considered valid, must set forth clearly and in writing. The detailed nature of the complaint must be stated, document signed and forwarded to the COR. Upon receipt of a complaint, the COR will investigate and document the findings on the monitoring form, Attachment 2 and in the COR file.

4.2.4 Customer feedback may also be obtained from the results of formal customer satisfaction surveys or random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. Levels of performance are keyed to the relative importance of the task to the overall mission performance.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1, Performance Requirements Summary.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring form in Attachment 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required quality levels are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment.

6.2 Reporting

6.2.1 At the beginning of each quarter, the COR will prepare a written report for the KO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the completed quality assurance monitoring form (Attachment 2), will become part of the QA documentation and COR file. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the KO, COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis

(Ver. May 2018) 4

Issues and concerns of both parties

Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

Recommendations for improved efficiency and/or effectiveness

Issues arising from the performance monitoring processes

6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the KO.

(Ver. May 2018) 5

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY (PRS)

Performance Objective

Performance Standard Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

5.3.1 Food

Service Periods

All food items prepared, delivered, and ready to serve by 10:15 am, unless otherwise directed. Meal service during established PWS hours (10:30 am - 12:30 pm)

No more than one instance per year of service starting 5 minutes late.

Monthly Inspection / COR

5.5 Meal and

Service Quality

Customers are encouraged to submit comments on the quality of meals served for each performance period

No more than 7 customer complaints per month

Periodic Inspection/ Customer Comments

5.5 and 5.12 Food quality and serving sizes as specified

Choice of two meat entrees, two vegetables, two starches, one sauce or gravy to compliment entrees when appropriate, salad bar, bread, fresh fruit, beverages, and a choice from at least two desserts offered at each meal

No more than 2 instances of non-compliance during the period of performance.

Periodic Inspection / COR

5.7 Boxed

Lunches

Contractor will provide cold boxed lunch meals with a choice of two meat entrees.

No more than 2 instances of non-compliance detected during the period of performance.

Periodic Inspection / COR

5.16 Compliance

with all FDA and Tri-Service Food Code Guidelines and state and local laws/regulations

Adhere to food safe temperatures for all food.

During periodic spot checks, no more than 2 instances that are outside of safety requirements.

Monthly Surveillance / COR

5.18 Contractor

Personnel Hygiene

All standards listed are adhered to.

No more than 2 instances of non-compliance detected during the period of performance.

Monthly Surveillance / COR

5.17 Cleanliness

of Serving Line

Must clean up all areas that they used in performance of this contract. NOTE: Serving lines will be kept clean and free of debris at all times during the meal period.

Area used cleaned to previous condition prior to use. No more than 2 instances detected during the period of performance.

Monthly Surveillance / COR

(Ver. May 2018) 6

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM

Performance Rating

Contract # Contractor Name: ______________

Deliverable/Service

Quality Rating

Causative Factors Effect on Mission Action Required / Date

All food items prepared, delivered, and provided as specified.

Paragraph 5.3.1

Green Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Satisfy Services NCOIC and guests in reference to timeliness of service and courteousness of employees.

Paragraph 5.5

Green Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Food quality and serving sizes as specified

Paragraph 5.5 and 5.12

When requested, guidelines for cold boxed lunches as specified

Paragraph 5.7

Compliance with all FDA and Tri-Service Food Code guidelines and state and local laws/regulations

Paragraph 5.16

Green Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Contractor Personnel Hygiene

Paragraph 5.18

Green Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Cleanliness of Serving Line

Paragraph 5.17

Green Comments Unnecessary for “Green” QA Rating.

(Ver. May 2018) 7

ANALYSIS OF RESULTS:

Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

QUALITY ASSURANCE RATINGS DEFINITIONS

Rating Description

Green Yes, performance and technical specifications are being met at AQL.

Yellow Yes, performance and technical specifications are currently being met at the minimum AQL, but the following service / deliverable needs contractor attention.

The Customer must identify what component of the deliverable and/or service requires attention.

Red

No, performance and technical specifications are not being met at AQL and the following service / deliverable needs immediate contractor resolution.

The Customer must identify what component of the deliverable and/or service is below the minimum AQL.

In your role as Contracting Officer Representative (COR) you assume some Quality Assurance duties. You will monitor contractor performance, complete and sign the Quality Assurance Worksheet provided below at least monthly, but you can submit the worksheet more frequently if needed. This worksheet allows you to document compliance with the Task Order and fill a regulatory requirement to ensure adequate oversight is being performed.

The COR shall complete the Quality Assurance Worksheet no later than the 15th day of each quarter at a minimum and then send directly to the Contractor and Contracting Office.

The quality rating may change from “Green” to “Red” without notice, however we encourage the COR to utilize the “Yellow” quality rating to alert the contracting office and the Contractor of quality issues that have the potential for a “Red” quality rating if corrective action is not taken.

Any time the rating is less than “Green” the COR shall clearly document the worksheet to indicate what did or did not occur per the PWS requirement. When an observation indicates other than a “Green” rating, the COR will require the Contractor to initial the observation. Initialing the observation does not constitute concurrence with the observation; it only acknowledges that they have been made aware of the defective performance. Notify the Contracting Officer if there is a deficiency. If the Contractor’s response to an identified quality deficiency is unsatisfactory, the Contracting Officer along with the COR will contact the Contractor to implement a plan of action to remedy the identified deficiency.

(Ver. May 2018) 8

COR CHANGES: If your supervisor decides to re-assign these COR oversight duties to another Government employee, you must notify the Contracting Officer or Administrative Contract Office immediately, in writing, with their name, position, e-mail and telephone number. E-mail notification is acceptable. Each COR conducting oversight duties must provide the Contracting Office a copy of the certificates from the required courses below BEFORE services start on the task order or before they can be assigned as the COR.