Atch (2) ELIN List _Solid Waste at CFAS - excel file (17 Tabs).xls

XLS spreadsheet 1 MB Posted

Attached to
INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICCES AT U. S. COMMANDER FLEET ACTIVITIES SASEBO, JAPAN
Solicitation number
N4008421B6301
Issued by

About this file

This document contains a line item number (LIN) and exhibit line item number (ELIN) spreadsheet for Contract Line Item Numbers (CLINs) under Solicitation/Contract N4008421B6301 for integrated solid waste management and medical waste collection and disposal services at U.S. Fleet Activities Sasebo, Japan. The total contract amount over eight years is 24 million yen. The spreadsheet includes 16 CLINs covering recurring and non-recurring work for a base period and seven option periods. Recurring work is priced using over 120 ELINs grouped by customer and location. Non-recurring work covers services like waste collection and disposal, recycling, and labor using 14 ELINs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Sheet

ATTACHMENT J-0200000-07

INTEGRATED SOLID WASTE MANAGEMENT INCLUDING

MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES

AT COMMANDER, FLEET ACTIVITIES, SASEBO (CFAS), JAPAN

SOLICITATION/CONTRACT: N4008421B6301

Contract Line Item Number (CLIN) and Exhibit line Item Number (ELIN) Spread Sheet
CLINDescriptionAmount (Yen)
per CLINAmount (Yen)

per period 0001 BASE PERIOD - Recurring Work

The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0002BASE PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0003FIRST OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0004FIRST OPTION PERIOD - No-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0005SECOND OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0006SECOND OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0007THIRD OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0008THIRD OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0009FOURTH OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0010FOURTH OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0011FIFTH OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0012FIFTH OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0013SIXTH OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0014SIXTH OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
0015SEVENTH OPTION PERIOD - Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ -¥ 3,000,000
0016SEVENTH OPTION PERIOD - Non-Recurring Work
The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07.¥ 3,000,000
TOTAL OF CONTRACT AMOUNT FOR EIGHT YEARS¥ 24,000,000

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 & 3.104[when filled]

ELINs-Base Recurring Work (RW)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0001
Line Item 0001 Recurring Work - Base Period (1 December 2021 - 30 November 2022)
PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05.
ELINs A001 through A023
ELIN/
Sub ELINDescriptionQTYUnit of IssueUnit PriceTotal
000101CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
A001Main Base12MO¥ -
A002Hario Housing12MO¥ -
A003Maebata Ordnance12MO¥ -
A004Hario-Shima Ordnance12MO¥ -
A005Akasaki POL Depot12MO¥ -
A006Iorizaki POL Depot12MO¥ -
A007Yokose POL Depot12MO¥ -
CFAS Subtotal (Total of ELINs A001 through A007)¥ -
000102FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
8Main Base Housing12MO¥ -
9Hario Housing12MO¥ -
HOUSING Subtotal (Total of ELINs A008 through A009)¥ -
000103SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
10Main Base12MO¥ -
11Akasaki POL Depot12MO¥ -
SRF Subtotal (Total of ELINs A010 through A011)¥ -
000104DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
12Main Base12MO¥ -
13Hario Housing12MO¥ -
DECA Subtotal (Total of ELINs A012 through A013)¥ -
000105DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
14Main Base12MO¥ -
15Hario Housing12MO¥ -
DODEA Subtotal (Total of ELINs A014 through A015)¥ -
000106DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
16Main Base12MO¥ -
DLA DISTRIBUTION Subtotal (Total of ELINs A016)¥ -
000107NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3
17Main Base12MO¥ -
18Hario Housing12MO¥ -
NBHC Subtotal (Total of ELINs A017 through A018)¥ -
000108NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
19Main Base12MO¥ -
SPAWAR Subtotal (Total of ELINs A019)¥ -
000109JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
20Main Base12MO¥ -
JED Subtotal (Total of ELINs A020)¥ -
000110NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
A021Yokose POL Depot12MO¥ -
NBU-7 Subtotal (Total of ELINs A021)¥ -
000111NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
A022Main Base12MO¥ -
NGIS Subtotal (Total of ELINs A022)¥ -
000112NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
A023Main Base12MO¥ -
NAVY LODGE Subtotal (Total of ELINs A023)¥ -
TOTAL RECURRING WORK PRICE BASE PERIOD¥ -
UNIT OF ISSUE: MO=MONTH

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-Base Period (Non-RW)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0002
Line Item 0002 Non-Recurring Work - Base Period (1 December 2021 - 30 November 2022)
PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18.
ELIN A700 thru A714
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Solid Waste Collection and Disposal, including Contractor Provided ContainersThe Contractor shall collect and dispose of solid waste.10CZ¥ -
A701Solid Waste Collection and Disposal, stored in Government Provided ContainersThe Contractor shall collect and dispose of solid waste.2,200CZ¥ -
A702Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
A703Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
A704Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.2,700CZ¥ -
A705Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.100CZ¥ -
A706Abrasive Blasting Media Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.5TN¥ -
A707Abrasive Blasting Media Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.700TN¥ -
A708Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water CoolersThe Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers.200EA¥ -
A709 Used Mattresses per Spec Item 3.2.2.3
A709AASingle-sized MattressesThe Contractor shall collect and recycle/dispose used singled-sized mattresses.50EA¥ -
A709ABOver-sized MattressesThe Contractor shall collect and recycle/dispose used over-sized mattresses.5EA¥ -
Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work)
A710Labor
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
A711Material, Equipment, and Transportation
Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
Regulated Medical Waste, Annex 1800000
A712Regulated Medical Waste Collection and Disposal without Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
A713Regulated Medical Waste Collection and Disposal with Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
A714Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence)The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic.2EA¥ -
TOTAL NON-RECURRING WORK PRICE BASE PERIOD¥ 3,000,000
UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

ELINs- 1st OP Period - RW

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0003
Line Item 0003 Recurring Work - First Option Period (1 December 2022 - 30 November 2023)
PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05.
ELINs B001 through B023
ELIN/
Sub ELINDescriptionQTYUnit of IssueUnit PriceTotal
000101CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B001Main Base12MO¥ -
B002Hario Housing12MO¥ -
B003Maebata Ordnance12MO¥ -
B004Hario-shima12MO¥ -
B005Akasaki POL Depot12MO¥ -
B006Iorizaki POL Depot12MO¥ -
B007Yokose POL Depot12MO¥ -
CFAS Subtotal (Total of ELINs B001 through B007)¥ -
000102FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B008Main Base Housing12MO¥ -
B009Hario Housing12MO¥ -
HOUSING Subtotal (Total of ELINs B008 through B009)¥ -
000103SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B010Main Base12MO¥ -
B011Akasaki POL Depot12MO¥ -
SRF Subtotal (Total of ELINs B010 through B011)¥ -
000104DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B012Main Base12MO¥ -
B013Hario Housing12MO¥ -
DECA Subtotal (Total of ELINs B012 through B013)¥ -
000105DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B014Main Base12MO¥ -
B015Hario Housing12MO¥ -
DODEA Subtotal (Total of ELINs B014 through B015)¥ -
000106DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B016Main Base12MO¥ -
DLA DISTRIBUTION Subtotal (Total of ELINs B016)¥ -
000107NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3
B017Main Base12MO¥ -
B018Hario Housing12MO¥ -
NBHC Subtotal (Total of ELINs B017 through B018)¥ -
000108NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B019Main Base12MO¥ -
SPAWAR Subtotal (Total of ELINs B019)¥ -
000109JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B020Main Base12MO¥ -
JED Subtotal (Total of ELINs B020)¥ -
000110NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B021Yokose POL Depot12MO¥ -
NBU-7 Subtotal (Total of ELINs B021)¥ -
000111NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B022Main Base12MO¥ -
NGIS Subtotal (Total of ELINs B022)¥ -
000112NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
B023Main Base12MO¥ -
NAVY LODGE Subtotal (Total of ELINs B023)¥ -
TOTAL RECURRING WORK PRICE 1ST OPTION PERIOD¥ -
UNIT OF ISSUE: MO=MONTH

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-1st OP Period - NRW

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0004
Line Item 0004 Non-Recurring Work - First Option Period (1 December 2022 - 30 November 2023)
PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18.
ELIN B700 thru B714
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Solid Waste Collection and Disposal, including Contractor Provided ContainersThe Contractor shall collect and dispose of solid waste.10CZ¥ -
B701Solid Waste Collection and Disposal, stored in Government Provided ContainersThe Contractor shall collect and dispose of solid waste.2,200CZ¥ -
B702Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
B703Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
B704Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.2,700CZ¥ -
B705Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.100CZ¥ -
B706Abrasive Blasting Media Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.5TN¥ -
B707Abrasive Blasting Media Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.700TN¥ -
A708Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water CoolersThe Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers.200EA¥ -
B709 Used Mattresses per Spec Item 3.2.2.3
B709AASingle-sized MattressesThe Contractor shall collect and recycle/dispose used singled-sized mattresses.50EA¥ -
B709ABOver-sized MattressesThe Contractor shall collect and recycle/dispose used over-sized mattresses.5EA¥ -
Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work)
B710Labor
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
B711Material, Equipment, and Transportation
Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
Regulated Medical Waste
B712Regulated Medical Waste Collection and Disposal without Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
B713Regulated Medical Waste Collection and Disposal with Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
B714Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence)The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic.2EA¥ -
TOTAL NON-RECURRING WORK PRICE 1ST OPTION PERIOD¥ 3,000,000
UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

ELINs- 2nd OP Period - RW

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0005
Line Item 0003 Recurring Work - Second Option Period (1 December 2023 - 30 November 2024)
PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05.
ELINs C001 through C023
ELIN/
Sub ELINDescriptionQTYUnit of IssueUnit PriceTotal
000101CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C001Main Base12MO¥ -
C002Hario Housing12MO¥ -
C003Maebata Ordnance12MO¥ -
C004Hario-shima12MO¥ -
C005Akasaki POL Depot12MO¥ -
C006Iorizaki POL Depot12MO¥ -
C007Yokose POL Depot12MO¥ -
CFAS Subtotal (Total of ELINs C001 through C007)¥ -
000102FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C008Main Base Housing12MO¥ -
C009Hario Housing12MO¥ -
HOUSING Subtotal (Total of ELINs C008 through C009)¥ -
000103SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C010Main Base12MO¥ -
C011Akasaki POL Depot12MO¥ -
SRF Subtotal (Total of ELINs C010 through C011)¥ -
000104DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C012Main Base12MO¥ -
C013Hario Housing12MO¥ -
DECA Subtotal (Total of ELINs C012 through C013)¥ -
000105DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C014Main Base12MO¥ -
C015Hario Housing12MO¥ -
DODEA Subtotal (Total of ELINs C014 through C015)¥ -
000106DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C016Main Base12MO¥ -
DLA DISTRIBUTION Subtotal (Total of ELINs C016)¥ -
000107NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3
C017Main Base12MO¥ -
C018Hario Housing12MO¥ -
NBHC Subtotal (Total of ELINs C017 through C018)¥ -
000108NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C019Main Base12MO¥ -
SPAWAR Subtotal (Total of ELINs C019)¥ -
000109JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C020Main Base12MO¥ -
JED Subtotal (Total of ELINs C020)¥ -
000110NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C021Yokose POL Depot12MO¥ -
NBU-7 Subtotal (Total of ELINs C021)¥ -
000111NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C022Main Base12MO¥ -
NGIS Subtotal (Total of ELINs C022)¥ -
000112NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3
C023Main Base12MO¥ -
NAVY LODGE Subtotal (Total of ELINs C023)¥ -
TOTAL RECURRING WORK PRICE 2ND OPTION PERIOD¥ -
UNIT OF ISSUE: MO=MONTH

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-2nd OP Period - NRW

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N4008421B6301
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0006
Line Item 0006 Non-Recurring Work - Second Option Period (1 December 2023 - 30 November 2024)
PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18.
ELIN C700 thru C714
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Solid Waste Collection and Disposal, including Contractor Provided ContainersThe Contractor shall collect and dispose of solid waste.10CZ¥ -
C701Solid Waste Collection and Disposal, stored in Government Provided ContainersThe Contractor shall collect and dispose of solid waste.2,200CZ¥ -
C702Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
C703Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.1,300CZ¥ -
C704Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.2,700CZ¥ -
C705Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect and dispose of industrial waste.100CZ¥ -
C706Abrasive Blasting Media Collection and Disposal with Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.5TN¥ -
C707Abrasive Blasting Media Collection and Disposal without Contractor Provided ContainersThe Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities.700TN¥ -
C708Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water CoolersThe Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers.200EA¥ -
C709 Used Mattresses per Spec Item 3.2.2.3
C709AASingle-sized MattressesThe Contractor shall collect and recycle/dispose used singled-sized mattresses.50EA¥ -
C709ABOver-sized MattressesThe Contractor shall collect and recycle/dispose used over-sized mattresses.5EA¥ -
Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work)
C710Labor
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
C711Material, Equipment, and Transportation
Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract.1,500,000LSNegotiated at time of order.¥ 1,500,000
Regulated Medical Waste
C712Regulated Medical Waste Collection and Disposal without Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
C713Regulated Medical Waste Collection and Disposal with Contractor Provided Container.The Contractor shall collect and dispose of, or transport regulated medical waste.2CZ¥ -
C714Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence)The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic.2EA¥ -
TOTAL NON-RECURRING WORK PRICE 2ND OPTION PERIOD¥ 3,000,000
UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE

&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]

ELINs-…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .