Atch (2) ELIN List _Solid Waste at CFAS - excel file (17 Tabs).xls
XLS spreadsheet 1 MB Posted
- Solicitation number
- N4008421B6301
About this file
This document contains a line item number (LIN) and exhibit line item number (ELIN) spreadsheet for Contract Line Item Numbers (CLINs) under Solicitation/Contract N4008421B6301 for integrated solid waste management and medical waste collection and disposal services at U.S. Fleet Activities Sasebo, Japan. The total contract amount over eight years is 24 million yen. The spreadsheet includes 16 CLINs covering recurring and non-recurring work for a base period and seven option periods. Recurring work is priced using over 120 ELINs grouped by customer and location. Non-recurring work covers services like waste collection and disposal, recycling, and labor using 14 ELINs.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Sheet
ATTACHMENT J-0200000-07
INTEGRATED SOLID WASTE MANAGEMENT INCLUDING
MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES
AT COMMANDER, FLEET ACTIVITIES, SASEBO (CFAS), JAPAN
SOLICITATION/CONTRACT: N4008421B6301
| Contract Line Item Number (CLIN) and Exhibit line Item Number (ELIN) Spread Sheet | |||
| CLIN | Description | Amount (Yen) | |
| per CLIN | Amount (Yen) |
per period 0001 BASE PERIOD - Recurring Work
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0002 | BASE PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0003 | FIRST OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0004 | FIRST OPTION PERIOD - No-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0005 | SECOND OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0006 | SECOND OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0007 | THIRD OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0008 | THIRD OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0009 | FOURTH OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0010 | FOURTH OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0011 | FIFTH OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0012 | FIFTH OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0013 | SIXTH OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0014 | SIXTH OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | |
| 0015 | SEVENTH OPTION PERIOD - Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ - | ¥ 3,000,000 |
| 0016 | SEVENTH OPTION PERIOD - Non-Recurring Work |
| The Contractor shall provide all labor, materials, equipment, coordination and supervision to provide INTEGRATED SOLID WASTE MANAGEMENT INCLUDING MEDICAL WASTE COLLECTION AND DISPOSAL SERVICES AT CFAS, JAPAN. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥ 3,000,000 | ||
| TOTAL OF CONTRACT AMOUNT FOR EIGHT YEARS | ¥ 24,000,000 |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 & 3.104[when filled]
ELINs-Base Recurring Work (RW)
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0001 | |||||||
| Line Item 0001 Recurring Work - Base Period (1 December 2021 - 30 November 2022) | |||||||
| PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05. | |||||||
| ELINs A001 through A023 | |||||||
| ELIN/ | |||||||
| Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total | ||
| 000101 | CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| A001 | Main Base | 12 | MO | ¥ - | |||
| A002 | Hario Housing | 12 | MO | ¥ - | |||
| A003 | Maebata Ordnance | 12 | MO | ¥ - | |||
| A004 | Hario-Shima Ordnance | 12 | MO | ¥ - | |||
| A005 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| A006 | Iorizaki POL Depot | 12 | MO | ¥ - | |||
| A007 | Yokose POL Depot | 12 | MO | ¥ - | |||
| CFAS Subtotal (Total of ELINs A001 through A007) | ¥ - | ||||||
| 000102 | FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 8 | Main Base Housing | 12 | MO | ¥ - | |||
| 9 | Hario Housing | 12 | MO | ¥ - | |||
| HOUSING Subtotal (Total of ELINs A008 through A009) | ¥ - | ||||||
| 000103 | SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 10 | Main Base | 12 | MO | ¥ - | |||
| 11 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| SRF Subtotal (Total of ELINs A010 through A011) | ¥ - | ||||||
| 000104 | DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 12 | Main Base | 12 | MO | ¥ - | |||
| 13 | Hario Housing | 12 | MO | ¥ - | |||
| DECA Subtotal (Total of ELINs A012 through A013) | ¥ - | ||||||
| 000105 | DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 14 | Main Base | 12 | MO | ¥ - | |||
| 15 | Hario Housing | 12 | MO | ¥ - | |||
| DODEA Subtotal (Total of ELINs A014 through A015) | ¥ - | ||||||
| 000106 | DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 16 | Main Base | 12 | MO | ¥ - | |||
| DLA DISTRIBUTION Subtotal (Total of ELINs A016) | ¥ - | ||||||
| 000107 | NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3 | ||||||
| 17 | Main Base | 12 | MO | ¥ - | |||
| 18 | Hario Housing | 12 | MO | ¥ - | |||
| NBHC Subtotal (Total of ELINs A017 through A018) | ¥ - | ||||||
| 000108 | NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 19 | Main Base | 12 | MO | ¥ - | |||
| SPAWAR Subtotal (Total of ELINs A019) | ¥ - | ||||||
| 000109 | JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| 20 | Main Base | 12 | MO | ¥ - | |||
| JED Subtotal (Total of ELINs A020) | ¥ - | ||||||
| 000110 | NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| A021 | Yokose POL Depot | 12 | MO | ¥ - | |||
| NBU-7 Subtotal (Total of ELINs A021) | ¥ - | ||||||
| 000111 | NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| A022 | Main Base | 12 | MO | ¥ - | |||
| NGIS Subtotal (Total of ELINs A022) | ¥ - | ||||||
| 000112 | NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| A023 | Main Base | 12 | MO | ¥ - | |||
| NAVY LODGE Subtotal (Total of ELINs A023) | ¥ - | ||||||
| TOTAL RECURRING WORK PRICE BASE PERIOD | ¥ - | ||||||
| UNIT OF ISSUE: MO=MONTH |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period (Non-RW)
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0002 | |||||||
| Line Item 0002 Non-Recurring Work - Base Period (1 December 2021 - 30 November 2022) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18. | |||||||
| ELIN A700 thru A714 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A700 | Solid Waste Collection and Disposal, including Contractor Provided Containers | The Contractor shall collect and dispose of solid waste. | 10 | CZ | ¥ - | ||
| A701 | Solid Waste Collection and Disposal, stored in Government Provided Containers | The Contractor shall collect and dispose of solid waste. | 2,200 | CZ | ¥ - | ||
| A702 | Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| A703 | Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| A704 | Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 2,700 | CZ | ¥ - | ||
| A705 | Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 100 | CZ | ¥ - | ||
| A706 | Abrasive Blasting Media Collection and Disposal with Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 5 | TN | ¥ - | ||
| A707 | Abrasive Blasting Media Collection and Disposal without Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 700 | TN | ¥ - | ||
| A708 | Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers | The Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers. | 200 | EA | ¥ - | ||
| A709 Used Mattresses per Spec Item 3.2.2.3 | |||||||
| A709AA | Single-sized Mattresses | The Contractor shall collect and recycle/dispose used singled-sized mattresses. | 50 | EA | ¥ - | ||
| A709AB | Over-sized Mattresses | The Contractor shall collect and recycle/dispose used over-sized mattresses. | 5 | EA | ¥ - | ||
| Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work) | |||||||
| A710 | Labor | ||||||
| Provide labor cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| A711 | Material, Equipment, and Transportation | ||||||
| Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| Regulated Medical Waste, Annex 1800000 | |||||||
| A712 | Regulated Medical Waste Collection and Disposal without Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| A713 | Regulated Medical Waste Collection and Disposal with Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| A714 | Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence) | The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic. | 2 | EA | ¥ - | ||
| TOTAL NON-RECURRING WORK PRICE BASE PERIOD | ¥ 3,000,000 | ||||||
| UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELINs- 1st OP Period - RW
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0003 | |||||||
| Line Item 0003 Recurring Work - First Option Period (1 December 2022 - 30 November 2023) | |||||||
| PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05. | |||||||
| ELINs B001 through B023 | |||||||
| ELIN/ | |||||||
| Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total | ||
| 000101 | CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B001 | Main Base | 12 | MO | ¥ - | |||
| B002 | Hario Housing | 12 | MO | ¥ - | |||
| B003 | Maebata Ordnance | 12 | MO | ¥ - | |||
| B004 | Hario-shima | 12 | MO | ¥ - | |||
| B005 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| B006 | Iorizaki POL Depot | 12 | MO | ¥ - | |||
| B007 | Yokose POL Depot | 12 | MO | ¥ - | |||
| CFAS Subtotal (Total of ELINs B001 through B007) | ¥ - | ||||||
| 000102 | FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B008 | Main Base Housing | 12 | MO | ¥ - | |||
| B009 | Hario Housing | 12 | MO | ¥ - | |||
| HOUSING Subtotal (Total of ELINs B008 through B009) | ¥ - | ||||||
| 000103 | SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B010 | Main Base | 12 | MO | ¥ - | |||
| B011 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| SRF Subtotal (Total of ELINs B010 through B011) | ¥ - | ||||||
| 000104 | DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B012 | Main Base | 12 | MO | ¥ - | |||
| B013 | Hario Housing | 12 | MO | ¥ - | |||
| DECA Subtotal (Total of ELINs B012 through B013) | ¥ - | ||||||
| 000105 | DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B014 | Main Base | 12 | MO | ¥ - | |||
| B015 | Hario Housing | 12 | MO | ¥ - | |||
| DODEA Subtotal (Total of ELINs B014 through B015) | ¥ - | ||||||
| 000106 | DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B016 | Main Base | 12 | MO | ¥ - | |||
| DLA DISTRIBUTION Subtotal (Total of ELINs B016) | ¥ - | ||||||
| 000107 | NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3 | ||||||
| B017 | Main Base | 12 | MO | ¥ - | |||
| B018 | Hario Housing | 12 | MO | ¥ - | |||
| NBHC Subtotal (Total of ELINs B017 through B018) | ¥ - | ||||||
| 000108 | NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B019 | Main Base | 12 | MO | ¥ - | |||
| SPAWAR Subtotal (Total of ELINs B019) | ¥ - | ||||||
| 000109 | JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B020 | Main Base | 12 | MO | ¥ - | |||
| JED Subtotal (Total of ELINs B020) | ¥ - | ||||||
| 000110 | NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B021 | Yokose POL Depot | 12 | MO | ¥ - | |||
| NBU-7 Subtotal (Total of ELINs B021) | ¥ - | ||||||
| 000111 | NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B022 | Main Base | 12 | MO | ¥ - | |||
| NGIS Subtotal (Total of ELINs B022) | ¥ - | ||||||
| 000112 | NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| B023 | Main Base | 12 | MO | ¥ - | |||
| NAVY LODGE Subtotal (Total of ELINs B023) | ¥ - | ||||||
| TOTAL RECURRING WORK PRICE 1ST OPTION PERIOD | ¥ - | ||||||
| UNIT OF ISSUE: MO=MONTH |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-1st OP Period - NRW
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0004 | |||||||
| Line Item 0004 Non-Recurring Work - First Option Period (1 December 2022 - 30 November 2023) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18. | |||||||
| ELIN B700 thru B714 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| B700 | Solid Waste Collection and Disposal, including Contractor Provided Containers | The Contractor shall collect and dispose of solid waste. | 10 | CZ | ¥ - | ||
| B701 | Solid Waste Collection and Disposal, stored in Government Provided Containers | The Contractor shall collect and dispose of solid waste. | 2,200 | CZ | ¥ - | ||
| B702 | Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| B703 | Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| B704 | Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 2,700 | CZ | ¥ - | ||
| B705 | Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 100 | CZ | ¥ - | ||
| B706 | Abrasive Blasting Media Collection and Disposal with Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 5 | TN | ¥ - | ||
| B707 | Abrasive Blasting Media Collection and Disposal without Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 700 | TN | ¥ - | ||
| A708 | Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers | The Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers. | 200 | EA | ¥ - | ||
| B709 Used Mattresses per Spec Item 3.2.2.3 | |||||||
| B709AA | Single-sized Mattresses | The Contractor shall collect and recycle/dispose used singled-sized mattresses. | 50 | EA | ¥ - | ||
| B709AB | Over-sized Mattresses | The Contractor shall collect and recycle/dispose used over-sized mattresses. | 5 | EA | ¥ - | ||
| Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work) | |||||||
| B710 | Labor | ||||||
| Provide labor cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| B711 | Material, Equipment, and Transportation | ||||||
| Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| Regulated Medical Waste | |||||||
| B712 | Regulated Medical Waste Collection and Disposal without Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| B713 | Regulated Medical Waste Collection and Disposal with Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| B714 | Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence) | The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic. | 2 | EA | ¥ - | ||
| TOTAL NON-RECURRING WORK PRICE 1ST OPTION PERIOD | ¥ 3,000,000 | ||||||
| UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELINs- 2nd OP Period - RW
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0005 | |||||||
| Line Item 0003 Recurring Work - Second Option Period (1 December 2023 - 30 November 2024) | |||||||
| PROVIDE PRICES TO PERFORM INTEGRATED SOLID WASTE MANAGEMENT- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OF ANNEX 15 & 18. Services for each customer location listed in the Maps and Locations provided in J-1503030-04 and Inventory List provided in J-1503030-05. | |||||||
| ELINs C001 through C023 | |||||||
| ELIN/ | |||||||
| Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total | ||
| 000101 | CFAS (CNIC)-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C001 | Main Base | 12 | MO | ¥ - | |||
| C002 | Hario Housing | 12 | MO | ¥ - | |||
| C003 | Maebata Ordnance | 12 | MO | ¥ - | |||
| C004 | Hario-shima | 12 | MO | ¥ - | |||
| C005 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| C006 | Iorizaki POL Depot | 12 | MO | ¥ - | |||
| C007 | Yokose POL Depot | 12 | MO | ¥ - | |||
| CFAS Subtotal (Total of ELINs C001 through C007) | ¥ - | ||||||
| 000102 | FAMILY HOUSING-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C008 | Main Base Housing | 12 | MO | ¥ - | |||
| C009 | Hario Housing | 12 | MO | ¥ - | |||
| HOUSING Subtotal (Total of ELINs C008 through C009) | ¥ - | ||||||
| 000103 | SRF-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C010 | Main Base | 12 | MO | ¥ - | |||
| C011 | Akasaki POL Depot | 12 | MO | ¥ - | |||
| SRF Subtotal (Total of ELINs C010 through C011) | ¥ - | ||||||
| 000104 | DECA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C012 | Main Base | 12 | MO | ¥ - | |||
| C013 | Hario Housing | 12 | MO | ¥ - | |||
| DECA Subtotal (Total of ELINs C012 through C013) | ¥ - | ||||||
| 000105 | DODEA-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C014 | Main Base | 12 | MO | ¥ - | |||
| C015 | Hario Housing | 12 | MO | ¥ - | |||
| DODEA Subtotal (Total of ELINs C014 through C015) | ¥ - | ||||||
| 000106 | DLA DISTRIBUTION-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C016 | Main Base | 12 | MO | ¥ - | |||
| DLA DISTRIBUTION Subtotal (Total of ELINs C016) | ¥ - | ||||||
| 000107 | NBHC-FUNDED AREAS - 1503030 Integrated Solid Waste Management and 1800000 Environmental, Spec Item 3 | ||||||
| C017 | Main Base | 12 | MO | ¥ - | |||
| C018 | Hario Housing | 12 | MO | ¥ - | |||
| NBHC Subtotal (Total of ELINs C017 through C018) | ¥ - | ||||||
| 000108 | NIWC FACILITY PACIFIC JAPAN-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C019 | Main Base | 12 | MO | ¥ - | |||
| SPAWAR Subtotal (Total of ELINs C019) | ¥ - | ||||||
| 000109 | JED-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C020 | Main Base | 12 | MO | ¥ - | |||
| JED Subtotal (Total of ELINs C020) | ¥ - | ||||||
| 000110 | NBU-7-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C021 | Yokose POL Depot | 12 | MO | ¥ - | |||
| NBU-7 Subtotal (Total of ELINs C021) | ¥ - | ||||||
| 000111 | NGIS-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C022 | Main Base | 12 | MO | ¥ - | |||
| NGIS Subtotal (Total of ELINs C022) | ¥ - | ||||||
| 000112 | NAVY LODGE-FUNDED AREAS - 1503030 Integrated Solid Waste Management, Spec Item 3 | ||||||
| C023 | Main Base | 12 | MO | ¥ - | |||
| NAVY LODGE Subtotal (Total of ELINs C023) | ¥ - | ||||||
| TOTAL RECURRING WORK PRICE 2ND OPTION PERIOD | ¥ - | ||||||
| UNIT OF ISSUE: MO=MONTH |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-2nd OP Period - NRW
| ATTACHMENT J-0200000-07 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT N4008421B6301 | |||||||
| EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0006 | |||||||
| Line Item 0006 Non-Recurring Work - Second Option Period (1 December 2023 - 30 November 2024) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 OF ANNEX 15 & 18. | |||||||
| ELIN C700 thru C714 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| C700 | Solid Waste Collection and Disposal, including Contractor Provided Containers | The Contractor shall collect and dispose of solid waste. | 10 | CZ | ¥ - | ||
| C701 | Solid Waste Collection and Disposal, stored in Government Provided Containers | The Contractor shall collect and dispose of solid waste. | 2,200 | CZ | ¥ - | ||
| C702 | Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| C703 | Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 1,300 | CZ | ¥ - | ||
| C704 | Non-Burnable Industrial Waste Collection and Disposal with Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 2,700 | CZ | ¥ - | ||
| C705 | Non-Burnable Industrial Waste Collection and Disposal without Contractor Provided Containers | The Contractor shall collect and dispose of industrial waste. | 100 | CZ | ¥ - | ||
| C706 | Abrasive Blasting Media Collection and Disposal with Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 5 | TN | ¥ - | ||
| C707 | Abrasive Blasting Media Collection and Disposal without Contractor Provided Containers | The Contractor shall collect abrasive blasting media for recycling or disposal as applicable at off-base recycling facilities. | 700 | TN | ¥ - | ||
| C708 | Televisions (TVs), Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers | The Contractor shall collect and recycle household appliances. This ELIN includes all labor, material, equipment, transportation, recycling fees and postal handling fees to dispose and recycle the following appliances regardless of the size, manufacturer, model number, or quantity or mix of items being recycled in the individual order: Refrigerators, Freezers, Air Conditioners/AC Units, Non-metallic Washer/Dryer Machines, and Water Coolers. | 200 | EA | ¥ - | ||
| C709 Used Mattresses per Spec Item 3.2.2.3 | |||||||
| C709AA | Single-sized Mattresses | The Contractor shall collect and recycle/dispose used singled-sized mattresses. | 50 | EA | ¥ - | ||
| C709AB | Over-sized Mattresses | The Contractor shall collect and recycle/dispose used over-sized mattresses. | 5 | EA | ¥ - | ||
| Labor, Equipment, Material, and Transportation (Unite Priced labor (UPL) Work) | |||||||
| C710 | Labor | ||||||
| Provide labor cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| C711 | Material, Equipment, and Transportation | ||||||
| Provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material, equipment, and transportation cost to accomplish a task not required by the recurring work portion of the contract. | 1,500,000 | LS | Negotiated at time of order. | ¥ 1,500,000 | ||
| Regulated Medical Waste | |||||||
| C712 | Regulated Medical Waste Collection and Disposal without Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| C713 | Regulated Medical Waste Collection and Disposal with Contractor Provided Container. | The Contractor shall collect and dispose of, or transport regulated medical waste. | 2 | CZ | ¥ - | ||
| C714 | Regulated Medical Waste Collection and Transportation (Maximum 3CM per occurrence) | The Contractor shall collect BHW/RMW at the location specified in the order, and transport to the BHW/RMW container at the Naval Branch Health Clinic. | 2 | EA | ¥ - | ||
| TOTAL NON-RECURRING WORK PRICE 2ND OPTION PERIOD | ¥ 3,000,000 | ||||||
| UNIT OF ISSUE: CZ=CUBIC METER, EA=EACH, LS=LUMP SUM, TN=TONNAGE |
&C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled] &C&"Arial,Bold"&8CUI//FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104[when filled]
ELINs-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .