Atch 2. SOW Weathering of EVA Laminated Glazing Units 04042022.pdf
PDF 104 KB Posted
- Attached to
- Weathering of Laminated Glazing Units
- Solicitation number
- 19AQMM22Q0044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 2. Rev. SOW Weathing of EVA Laminated Glazing Units_04212022.pdf | ||
| Rev QAs 19AQMM22Q0044_1.pdf | ||
| QAs 19AQMM22Q0044_.pdf | ||
| Atch 1. Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Atch 3. VERIFICATION OF SERVICE CONTRACT LABOR STANDARDS v2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR
WEATHERING OF LAMINATED GLAZING UNITS
1. BACKGROUND
The Department’s Bureau of Diplomatic Security (DS), Research and Development Branch
(DS/PSD/RD) requires long-term weathering of Ethylene Vinyl Acetate (EVA) and PolyVinyl
Butaryl (PVB) laminated glazing units to support use in State Department construction projects.
Prior to use in any Department of State building, long-term weathering degradation of the bond between EVA and glass as well as any degradation to the EVA laminate itself must be investigated. Glazing units laminated with an established interlayer, PVB, shall be used as a baseline to compare any degradation of performance when exposed to similar environmental conditions.
2. OBJECTIVES
The objective of this contract is to naturally weather six (6) glazing units. The glazing units shall be delivered to the contract winner shortly after contract award. After natural weathering of the glazing units has been conducted, they shall be packaged and shipped to a site of the
Government’s choosing for further testing efforts by others.
3. TASKS
3.1. Weathering shall be performed on six (6) 68” by 44” laminated glazing panels. Natural weathering shall be performed in accordance with natural exposure weathering method defined in Section 5.4.1(1) of ANSI Z97.1-2015 (R2020), except that the duration of testing shall be ten
(10) years.
3.2. Perform the tests defined in Sections 5.4.2(1) and 5.4.2(3) of ANSI Z97.1-2015 (R2020) on a yearly basis for the ten (10) years of the natural weathering period. Reports shall be submitted per instruction
3.3. At the completion of testing, the weathered laminated glazing units shall be packaged and shipped to a site of the Government’s choosing. The site shall be determined prior to year ten
(10) of the weathering period.
4. DELIVERABLES
Six (6) naturally weathered glazing units packaged and shipped to a site of the Government’s choosing.
Weathering reports shall be in accordance with the contract labs procedures or per any reporting requirements in ANSI Z97.1-2015 (R2020), whichever is more stringent, but not less than one
(1) report per year. The weathering report shall be issued at a time that shall allow the
Government to review and determine if another option year is to be exercised. A final report shall be provided after completion of the ten (10) year weathering cycle or at the time the
Government determines that weathering shall end.
Reports shall be emailed to Phillip Benshoof and Craig Ackerman at BenshoofPC@State.gov and AckermanCR@state.gov. Any hard copy reports shall be mailed to the following address:
Department of State
Attention: Phillip Benshoof
1400 Wilson Blvd
9th Floor
Arlington, VA 22209
Reporting of funding expenditures shall also be submitted to the above email or physical address no less than one (1) time per year.
Six (6) naturally weathered glazing units packaged and shipped to a site of the Government’s choosing.
Estimated Project Timeline and Deliverable Execution
Figure 1: Sample Project Timeline
5. PERIOD OF PERFORMANCE
The period of performance consists of a one (1) year base with nine (9) one (1) year options in order to complete the desired ten (10) year weathering cycle. Depending on each one (1) year weathering result reports, and each subsequent year results, the Government may exercise another
Option to continue weathering in one (1) year increments.
6. PLACE OF PERFORMANCE
The primary location is in the contractor’s facilities.
7. SECURITY CLEARANCE REQUIREMENTS
Performance under this contract will not require contractor employees to have access to classified material and/or information. Therefore, there is no requirement for cleared personnel under the contract.
Deliverables Estimated Completion Date
Yearly report 4-6 weeks prior to end of each contract year
Six (6) weathered glazing units NLT 4 weeks after end of weathering
Final Report NLT 4 weeks after end of weathering