Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
Solicitation number
FA4610-22-R-0001
Issued by
Department of the Air Force Space Command

About this file

This federal contract opportunity announcement solicits proposals for the Launch Operations Support Contract (LOSC) at Vandenberg Air Force Base in California. Interested offerors must submit proposals by 27 January 2022 responding to the requirements in the Performance Work Statement and its appendices. The North American Industry Classification System code for this effort is 561210 for Facilities Support Services. The incumbent contractor must provide a range of support services for launch operations including facility management, range safety, configuration management, quality assurance, and software engineering in accordance with the regulatory compliance documents listed in Attachment 2. Offerors should also review the technical library files provided for informational purposes. The contracting agency is the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-1_Contractor Staffing Plan and Matrix_30Aug22.xlsx XLSX spreadsheet
TECH LIBRARY Workload Data Information for CLINs X003_X004.docx DOCX document
Conformed Solicitation Amendment - FA461022R00010005.pdf PDF
L-5_Section M dtd 19Nov21_Revised_02Feb2022.pdf PDF
RFP Amendment 0003 FA461022R00010003 SF30 signed 20220125.pdf PDF
RFP Amendment - FA461022R00010002 SF30 signed 20220118.pdf PDF
Amend 0001 Conformed SF33 - FA461022R00010001_20220112.pdf PDF
Atch 6_LOSC_DD254_7Jan2022.pdf PDF
Atch 11 Appendix D - Job Descriptions_redacted_11Jan2022.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A_12Jan2022.pdf PDF
L-5_Section M dtd 19Nov21_Revised_11Jan2022.pdf PDF
22R0001 LOSC RFP QandA Consolidated.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A025_Generator Testing and Maint Report_Final_9Dec2021.pdf PDF
Exhibit B_LOSC_DID_Combined_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-IF8I_-en-e.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1A_datasheet_022610.pdf PDF
TECH LIBRARY 1 System and Overview ACGAL020S000001_A.pdf PDF
TECH LIBRARY 5-HPGSA-PV-230-VTE-20210121.pdf PDF
TECH LIBRARY 8-LOSC Service Calls 1Jul19_30Jun20.pdf PDF
TECH LIBRARY 9-TA rollup WLF.pdf PDF
TECH LIBRARY 11-Workload Factor Hours_OY2.pdf PDF
TECH LIBRARY 13-CDRL_A001_Submittal example.pdf PDF
TECH LIBRARY 13-CDRL_A003_Testing and Certification_example.pdf PDF
TECH LIBRARY 13-CDRL_A024_Work Order Status Report_example.pdf PDF
TECH LIBRARY 13-CDRL_A010 Daily Maintenance And Repair Schedule_example.pdf PDF
TECH LIBRARY 13-CDRL_A014_Cathodic Protection Tracker_example.pdf PDF
L-5_Section M dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 6_LOSC_DD254_9Dec2021.pdf PDF
Atch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Exhibit A_CDRL_A002_GFP Inventory Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A010_Daily Maintenance and Repair Schedule_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A014_Cathodic Protection Booklet_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A020_Contract Funds Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A027_Facility Assessment Report_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-um001_-en-p.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1407-CGCM-DLR.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-td001_-en-p.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020S000002_E1.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1AmanualRev022610V13.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 2814100.pdf PDF
TECH LIBRARY 10-Fences_Gates_WLF.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Appendix K

GLOSSARY

FOR

LAUNCH OPERATIONS SUPPORT

CONTRACT (LOSC)

Solicitation FA4610-22-R-0001

Space Launch Delta 30- VANDENBERG

SPACE FORCE BASE

DATED: 09 Dec 2021

It is the responsibility of the contractor to establish continuing requirements with the Publications Distribution Office or other office of prime responsibility. Revisions, supplements, and changes may be issued during the life of the contract. The contractor shall requisition all additional documents, which shall be in full force and effect immediately upon receipt. It is the contractor’s responsibility to ensure that all documents on hand are posted and up to date, as amended, supplemented, or superseded. If there is an increase or decrease in the costs of services as a result of any compliance changes, the contractor shall notify the Contracting Officer within 30 days. In the case that there exists any conflict within compliance documentations, these will be reported to the Contracting Officer within 10 days, with citations of publications and details pertaining to conflicts, for prompt resolution.

The contractor is obligated to follow compliance documents, to the extent specified.

Compliance documents are “all inclusive” unless otherwise indicated.

Publication Number Title Air Force:

AFI 31-101 Air Force Installation Security Program AFI 32-1001 Civil Engineering Operations

AFMAN 32-1062 Electrical Systems, Power Plants and Generators AFMAN 32-1065 Grounding & Electrical Systems

AFMAN 32-1067 Water and Fuel Systems

AFMAN 32-7002 Environmental Compliance and Pollution Prevention AFMAN 91-203 Air Force Consolidated Occupational Safety, Fire and

Health Standards AFPD 63-1/20-1 Integrated Life Cycle Management AFPAM 63-113 Program Protection Planning for Life Cycle Management

AFSPCMAN 91-710 Range Safety User Requirements, Volumes 1, 3, 5, & 6, 7 including LOSC Special Tailoring

Department of Defense:

DoDD 5200.39 Security, Intelligence, and Counterintelligence

Support to Acquisition Program Protection DoDD 5230.25 Withholding of Unclassified Technical Data from Public

Disclosure DoDI 5000.67 Prevention and Mitigation of Corrosion on DoD Military

Equipment and Infrastructure DoDM 5200.01-V3

DoD Information Security Program: Protection of Classified Information, Change 3

DoDI 6055.09

Defense Explosives Safety Regulation, Edition 1

DoDI 6055.11

Protecting Personnel from Electromagnetic Fields DoDI 8500.01

Cybersecurity, Change 1 DoDI 8510.01 Change 2

Risk Management Framework for DoD Information Technology (IT)

DoDI 8570.01-M, Change 4, Information Assurance Workforce Improvement Program

SLD30:

30 SWI 13-203 Western Range Scheduling

SLD 30I 32-1001 Space Launch Delta 30 Facility Manager Program

GMD/MDA:

GM-E-PLN-SEP-0001-Rev-A

GMD System Engineering Plan GM-PLAN-00102-1 Rev B

GMD Quality & Mission Assurance Plan

GM-PLSN-00104-1-NEW

Programmatic Environmental, Safety and Occupational Health Evaluation (PESHE) of GMD

GM-PLAN-00103-1-Rev B

GMD Safety Management Plan

GME-PLN-CMP-0002

GMD Configuration Management Plan

GM-PLN-IPSP-0109

GMD Integrated Product Support Plan

GME-PLN-SDP-0010

GMD Software Engineering Plan

GM-PLN-SWRP-0014

GMD Software Reliability Program Plan GME-PLN-VP-0004, Rev A

GMD Verification Plan

GM-E-PLN-RMP-0003, Rev C

GMD Risk, Issue, and Opportunity Management Plan MDA-QS-001-MAP Rev C

MDA-QS-001-MAP MDA Assurance Provisions. Revision C, 01 Oct 2019

MDA-QS-003-PMAP Rev C

MDA-QS-003-PMAP MDA Parts, Materials and Processes, Revision C, 01 Oct 2019

MDA Instruction 5000.20-INS

Engineering Technical Review Process

MDA-STD-003B

BMDS Chemical, Biological, and Radiological Contamination Survivability (CBRCS) Standard, Vol 1

MDA Directive 4165.01

Real Property Acquisition, Sustainment, Restoration, Modernization, and Accountability, MDA Direction 5200.08

Program Protection within the Missile Defense Agency

MDA-GME-PLN-PAP-0005,

Rev A

GMD Program Analysis Plan

MDA-200727-9R9X

GMD Life Cycle Sustainment Plan

SI 538-02

BMDS Physical Security Program

SS V21.1

BMD System Specification (SS) Version 21.1

United Facilities Criteria:

UFC Unified Facilities Criteria Website Documentation Location https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 3-101-01 UFC Architecture, Change 1 UFC 3-301-01 UFC Structural Engineering UFC 3-301-02 YFC Design of Risk Category V Structures, National

Strategic Military Assets UFC 3-560-01 Electrical Safety, O& M UFC 3-520-01 Interior Electrical Systems UFC 3-600-01, Change 2 UFC Fire Protection Engineering for Facilities UFC 4-010-01 UFC DoD Minimum Antiterrorism Standards for Buildings UFC 4-020-03FA, Change 1 UFC Security Engineering; Final Design

Miscellaneous Publications:

30 CES Spec 015720 Civil Engineer’s General Environmental Specifications

CRWQCB WDR 86-004 Waste Discharge Requirement (SVPP) ASME B30 Standards Committee Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings FUMP 30 SW Fuel Use Monitoring Plan (FUMP) NETA Appendix B-Frequency of Maintenance Tests

National Fire Protection Association (NFPA)

13-Sprinkler System, 72-Fire Alarm, 70B-RP Elec Equipment Maintenance

NFPA 780 Standards for the Installation of Lightning Protection Systems

PTO 13968-R2 and subsequent revisions

Permit to Operate 13968, Vandenberg Space Force Base

SVPP CEMS Plan South Vandenberg Power Plant Continuous Emission Monitor System (CEMS) Plan

UFC 3-110-03 Roofing, change 5

MIL-HDBK-419A

Grounding Bonding and shielding for Electronic Equipment and Facilities

MIL-HDBK-1013/1A

Design Guideline for Physical Security of Facilities

MIL-STD-810H, CN1,

DoD Test Method Standard for Environmental Engineering Considerations and Laboratory Test

MIL-STD-188-124B

Grounding, Bonding, and Shielding, Change Notice 3

MIL-STD-188-125-1

High-Altitude Electromagnetic Pulse (HEMP) Protection for Ground-Based C4I Facilities Performing Critical Time Urgent Mission, Part 1, Mixed Facilities

MIL-STD-461G

Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

MIL-STD-810H, CN1

DoD Test Method Standard for Environmental Engineering Considerations and Laboratory Test

MIL-STD-882E

DoD Standard Practice for System Safety

MIL-STD-1472G

DoD Design Criteria Standard: Human Engineering

MIL-STD-2105D

DoD Test Method Standard for Hazard Assessment Test for Non-Nuclear Munitions