TECH LIBRARY 13-CDRL_A001_Submittal example.pdf

PDF 842 KB Posted

Attached to
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
Solicitation number
FA4610-22-R-0001
Issued by
Department of the Air Force Space Command

About this file

This is a request for proposal for the Launch Operations Support Contract at Vandenberg Air Force Base. The RFP seeks proposals to provide facilities support services including corrosion control and repair work, as outlined in the attached performance work statement and appendices. Proposals are due by 27 January 2022, with the NAICS code of 561210 and a small business size standard of $41.5 million. Additional attachments include security classification specifications, Department of Labor wage determinations for various construction types, collective bargaining agreements and property management requirements. Questions regarding the RFP are due by 4 January 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-4_Section L dtd 19Nov21_Revised_30Aug22.pdf PDF
L-5_Section M dtd 19Nov21_Revised_30Aug22.pdf PDF
L-4_Section L dtd 19Nov21_Revised_04Feb2022.pdf PDF
RFP Amendment 0004 Conf SF33 - FA461022R00010004.pdf PDF
RFP Amendment - FA461022R00010002 Conf SF33 20220118.pdf PDF
Atch 8 SCA WD 2015-5637_Rev 19_20211020_12Jan2022.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Revised_11Jan2022.pdf PDF
Solicitation - FA461022R0001_20211209.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Final_9Dec2021.pdf PDF
Atch 2_Appendix B_Antenna Tower Responibility List_Final_9Dec2021.pdf PDF
Atch 2_Appendix G_Environmental Requirements_Final_9Dec2021.pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment_9Dec2021.pdf PDF
Atch 7 DB WD CA20210018_Mod 28_20211203.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A.pdf PDF
Atch 11 CBA-2019-12949.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029.pdf PDF
Exhibit A_CDRL_A001_Corrosion Prevention and Control Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A006_Technical Report Waster Water Discharge_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A009_Program Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A015_Solid Waste Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A016_HMMP Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A019_Cost Peformance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A021_JOCAS Reports_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A023_RCM Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A024_Work Order Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A026_System Safety Program Plan_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-td002_-en-e.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020E000000.pdf PDF
TECH LIBRARY 1 Func Desc Instrux - Control - ACGAL020S000002_B.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals EthosEnergy Speed Input Module II User Manual.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-OB32 Contact Output Module.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Axiomatic 0-200mA to 4-20mA Converter.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 3044102 (1).pdf PDF
TECH LIBRARY 2-8310-PV-181-VTE-20210225.pdf PDF
TECH LIBRARY 6-PTO-13968-R2-Final.pdf PDF
TECH LIBRARY 13-CDRL_A005_FUGITIVE REPORT_example.pdf PDF
TECH LIBRARY 13-CDRL_A025_Generator Testing and Maint Report_example.pdf PDF
Exhibit A_CDRL_A011_Quality Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A012_Requisition Summary_Final_9Dec2021.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 2_Appendix K_Compliance documents_Final_9Dec2021.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A001

July - September 2020

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

1 26 FENCE, GATES, TURNSTILES FENCE SCTY/VEH BAR 20200528 20210528 240

Areas where fence bottom rail run through the ground, corrosion is apparent. Security camera towers are in optimum condition with general corrosion on appurtenances. Fence poles that enter concrete/asphalt are corroding, recommend replacement within next couple years.

4 - Optimum 8 5 8 7

2 51 COMM, TMTR RCVR Ground to Air Transmit/Receive Site

20191002 20201002 48 Appurtenances 4 - Optimum 7 7 7 7

3 175 RDR TMTR COMP BLDG Former AN/MPS-39 MOTR Radar Bldg

20200226 20210226 480 Cinder Block, inside and out need elastomeric 3 - Past Due 7 6 6 6

4 176 WATER TANK Cable Hut #16 20200226 20210226 60 Tank needs touch up 5 - Acceptable 8 8 8 8 5 177 RAD RELAY FCLTY Cable Hut #16 20200226 20210226 0 No work needed 5 - Acceptable 9 9 9 9

6 178 LIGHTING, EXT Weather Tower #80 at Tranq Pk 20200226 20210226 0 Facility cinderblock recoating performed under TA20CEC017 5 - Acceptable 10 10 10 10

7 181 MSL/SPACE RSCH TST DOAMS Optical Telescope 20200430 20210430 180 No Work Needed, completed 20181026 5 - Acceptable 8 8 8 8 8 185 ELEC PWR S BLD Tranquillion Pk Generators 20191009 20201009 180 Switchgear, Load Bank, Generator being replaced on TA 4 - Optimum 7 7 8 7

9 188 ANTENNA SUPPORT STRUCTURE

VAFB TRANQUILION PK FACIL

188 FPS 16 BORESIGHT TOWER

20200609 20210609 80 Facilities Only, Appurtenances, Edgework 5 - Acceptable 5 8 8 8 8

11 189 ANTENNA SUPPORT BUILDING 20200814 20210814 80 Appurtenances and Installed Equipment, Touch Up 5 - Acceptable 9 8 9 9

10 189 ANTENNA SUPPORT BUILDING

VAFB TRANQUILION PK FACIL

188 FPS 16 BORESIGHT TOWER

HUT

20200609 20210609 80 Facilities Completed 20180621 5 - Acceptable 5 10 10 10 10

12 305 AUTO SWITCHING CEN AUTO SWITCHING CEN 20191017 20201017 80 Appurtenances, Exterior 4 - Optimum 7 7 7 7 14 313 ANTENNA WIND HUT WIND Site 053 20200217 20210217 20 No Work Needed, CC Completed 20190104 5 - Acceptable 10 10 10 10

13 313 ANTENNA SUPPORT STRUCTURE Wx Twr # 81 at Boat House, ID# 77

20200107 20210107 60 5 - Acceptable 8 8 8 8

15 326 OSS RADAR FACILITY Ocean Surveillance System Site #1

20200922 20210922 160 Bldg Appurtenances, power Wash, Roof Work 4 - Optimum 7 6 8 7

16 352 CAMERA TOWERS CAMERA TOWERS 20200528 20210528 160 Towers have no corrosion, but galvanic material shows signs of age.

5 - Acceptable 5 8 8 8 8

17 352 POWER PANELS Power Panels 20200528 20210528 80 Pole caps that panels are mounted too have corroded and recommend corrosion treatment or replacement of cap.

4 - Optimum 6 8 8 7

18 356 POWER PANEL Power Panels 20200528 20210528 160 Pole caps that panels are mounted too have corroded and recommend corrosion treatment or replacement of cap.

4 - Optimum 6 8 8 7

19 356 LIGHTING, EXT EXTERIOR AREA LTG 20200528 20210528 80 Poles are in Acceptable condition. Numbers have fallen off, Recommend stenceling numbers

5 - Acceptable 9 9 9 9

20 359 LIGHTING, EXT LIGHT POLES 20200528 20210528 220 Lighting, Poles, Man lift Needed 5 - Acceptable 8 8 8 8

21 376 ANTENNA SUPPORT STRUCTURE

AND HUT

Wx Twr # 301 at SLC-6, ID# 92 20200528 20210528 0 Tower replacement design project complete. Tower Replacement awaiting funding

3 - Past Due 1 6 6 6 6

22 380 SP ENTRY CON BLDG SLC-6 Entry Control Point 20200717 20210717 160 Facility Recently Upggraded, Roof and Eaves. Minor CC on Appurtenances and Minor Repair

5 - Acceptable 8 8 8 8

23 383 ELEC/PWR GEN PLT

Generator for SLC-6 security system

20200924 20210924 64 Diesel Tank & Piping Repair on VAFB CC TA, CC when repaired, other work completed 20190502 Piping Replacement on

TA19CE0039

5 - Acceptable 8 8 8 8

24 425 GENERATOR SYSTEM Generator System 20200430 20210430 0 Generator System in Acceptable condition. Last treated in 2018 5 - Acceptable 9 9 9 9

25 425 FACILITY Facility Appurtenances, HVAC 20200430 20210430 540 Severe Water Intrusion through cinderblock walls, doors are in optimum condition, fascia & drip edge paint peeling in areas which will cause corrosion if not treated.

5 - Acceptable 9 7 9 8

26 440 ANTENNA SUPPORT STRUCTURE VAFB FACIL 440 ANT 20200430 20210430 1280 Major Repairs required, No Climb Restriction Recommended, CC -on hold waiting direction

3 - Past Due 2 5 5 8 6

27 441 ELECT RSCH TST Frequency Monitoring Station 20200430 20210430 0 No Work Needed 5 - Acceptable 9 9 9 9

28 441 HVAC-1 20200430 20210430 0 No Work Needed, Completed 20180427 5 - Acceptable 9 9 9 9 29 441 HVAC-2 20200430 20210430 0 No Work Needed, Completed 20180427 5 - Acceptable 9 9 9 9 30 443 ANTENNA SUPPORT STRUCTURE FMS NORTH TOWER 20191112 20201112 1280 Major Repairs, CC - on hold waiting direction 3 - Past Due 2 5 5 5 5

31 444 ANTENNA WIND HUT VAFB FACIL 444 WINDS SITE

044 HUT

20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

32 444 ANTENNA SUPPORT STRUCTURE Wx Twr # 77 at FMS, ID# 70 20191112 20201112 120 Requires Repair/Replacement 4 - Optimum 7 7 7 7 33 445 ANTENNA SUPPORT STRUCTURE WEST TOWER 30 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

34 446 ANTENNA SUPPORT STRUCTURE ANTENNA SUPPORT

STRUCTURE

20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

35 447 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9 36 448 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

37 449 ANTENNA SUPPORT STRUCTURE ANTENNA SUPPORT

STRUCTURE

20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

38 450 TOWER FMS NORTH 40 FT TOWER A 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9 39 451 TOWER FMS SOUTH TOWER B 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9 40 452 POLE EAST WOODEN POLE 30 20191112 20201112 0 No Work Needed 5 - Acceptable 9 9 9 9

41 460 FAC/INSTALLED EQUIP

Wx Twr # 64 at MOTR BORESIGHT Twr, ID# 86

20200112 20210112 520

Site Abandoned, Switchgear/Transformers Corroding, Large Transformer Leaking (Price Includes 40k for transformer replacement) No CC work is recommended, all abandoned cabinets and transformers should be removed). Manhours include removal of unused and corroding equipment.

2 - Critical 4 4 4 4Sam ple

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

42 465 ANTENNA SUPPORT STRUCTURE Wx Twr # 64 at MOTR Boresight Twr, ID# 86

20200310 20210310 500 Antenna Support Structure, Power Wash, Spot and Treat 5 - Acceptable 8 8 8 8

44 475 MSL/SPACE RSCH TST Communications Hub, SVAFB 20200915 20210915 100 Coating failing on facility siding no corrosion control needed yet, Power wash tower, Facility Appurtenances

5 - Acceptable 8 8 9 8

43 475 ANTENNA SUPPORT STRUCTURE 20200430 20210430 460 Antenna Support Structure, Power Wash, Spot and Treat On

TA19CEC039

4 - Optimum 4 7 7 7 7

45 500 MSL/SPACE RSCH TST ARSR-4 20200609 20210609 160 Building, Appurtenances, Doors, Mech Room, New Roof Installed 5 - Acceptable 8 7 9 8

46 501 ELEC PWR S BLD ARSR Power Plant/UPS 20200609 20210609 160 Completed 20191230, No work needed, Doors Replaced, New Roof Installed

5 - Acceptable 9 9 9 9

47 502 ANTENNA SUPPORT STRUCTURE ANTENNA STRUCTURE AT BLDG

20200609 20210609 300 Tower, Cable Trays, Pressure Wash 4 - Optimum 4 7 7 8 7

48 504 ANTENNA SUPPORT STRUCTURE ANTENNA POLE @ BLDG 500 20200609 20210609 160 Small Tower 4 - Optimum 4 7 7 8 7 49 507 ANTENNA SUPPORT STRUCTURE ANTENNA 100 20200609 20210609 400 Tall Tower, Power Wash, Spot, Coat 4 - Optimum 4 7 7 7 7

51 509 ANTENNA WIND HUT VAFB FACIL 509 WINDS Site 055 Hut

20200609 20210609 40 Power Wash, Appurtenances 5 - Acceptable 5 8 8 8 8

50 509 ANTENNA SUPPORT STRUCTURE Wx Twr # 79 at ARSR Site, ID#

20200609 20210609 0 Pole 5 - Acceptable 5 9 9 9 9

53 510 SATEL CON STATION Command Transmitter 3 20200203 20210203 80 Appurtenances and Installed Equipment, Touch Up 5 - Acceptable 8 8 8 8 52 510 ANTENNA SUPPORT TOWER Command Transmitter 3 20191222 20201222 0 No Work Needed, CC Completed 20190927 5 - Acceptable 9 9 9 9

54 511 ELEC PWR S BLD CT-3 Generator 20191222 20201222 0 No Work Needed, CC Completed 20191115, New Gen Stack Installed

5 - Acceptable 9 9 9 9

55 515 ANTENNA SUPPORT STRUCTURE ANTENNA SUPPORT

STRUCTURE

20191112 20201112 320 Appurtenances, Tower, Associated installation, Includes Manlifts 4 - Optimum 7 7 7 7

56 518 RAD RELAY FCLTY Generator Facility Honda Ridge Tower

20191112 20201112 160 Appurtenances, Bollards, Associated equipment 4 - Optimum 8 7 6 7

57 525 FACILITY SVPP South Vandenberg Power Plant 20191117 20201117 560 Appurtenances, Floors, AHAC/Compressors, Mezzanine, Includes Manlfit as needed

4 - Optimum 7 7 7 7

58 528 ELEC PWR S BLD Weather Tower #78 at Diosa Road

20200310 20210310 0 Work Completed 20190408 5 - Acceptable 9 9 9 9

59 534 BE STOR SHED Load Bank 20200310 20210310 80 Bldg Appurtenances, power Wash 4 - Optimum 7 7 7 7

60 542 MSL/SPACE RSCH ENG LOSC Storage Facility 20200120 20210120 480 Power wash, corrosion treat fascia, overhead door, replace severly corroded fence that's falling down

2 - Critical 3 5 3 4

61 644 WEATHER HUT WINDS Site 061 Hut / Wx Tower RSA #61

20200320 20210320 0 Hut done CLIN 1 4 - Optimum 7 8 8 8

62 645 ANT SPRT TOWER

WINDS Site 061 Hut / Wx Tower RSA #61

20200225 20210225 80 Appurtenances, Tower, Minor Repair, Includes Manlift and Minor Repair, Power Wash, Vegetation Removal around guywire dead-men

5 - Acceptable 8 8 8 8

63 701 COMMUNICATIONS HUT - VIDEO N/A 20200517 20210517 48 Appurtenances 4 - Optimum 7 7 7 7

65 710 ANTENNA MiniSODAR at SLC-4, ID# None 20200717 20210717 80 Appurtenances, Supports, Power Wash 4 - Optimum 4 7 7 7 7

64 710 ANTENNA WIND HUT WIND HUT 20200717 20210717 50 Appurtenances, A/C, Power Wash 4 - Optimum 7 7 7 7

66 730 FACILITY 30 SW Comm Node and SLC-4 20200118 20210118 846 Ladders, Appurtenances, HVAC, Intakes, Pit Electrical Boxes, (Remove Old conduit, railings, items abandoned in place), Stairways, Minor Repairs as Necessary (5$K included for Manlift)

3 - Past Due 5 4 6 5

67 745 AUTO SWITCHING CEN Cable Hut #13 at SLC-4 20200225 20210225 16 Appurtenances 5 - Acceptable 8 8 8 8 68 746 TRAFFIC CHK HSE SLC-4E Pad ECP 20200118 20210118 0 No Work Needed, CC Completed 20190104 5 - Acceptable 9 9 9 9 69 748 AUTO SWITCHING CEN Cable Hut #11 20191017 20201017 80 Doors on Order, Install and CC. CC Completed 20190818 5 - Acceptable 9 9 9 9

71 756 ANTENNA WIND HUT VAFB FACIL 756 WINDS Site 054 Hut

20200922 20210922 40 Appurtenances, HVAC 5 - Acceptable 8 8 8 8

70 756 ANTENNA SUPPORT STRUCTURE Wx Twr # 54 at SLC-3, ID# 78 20200922 20210922 0 Tower treated beginning of year 2020. 5 - Acceptable 5 10 10 10 10

72 759 SP ENTRY CON BLDG SLC-3E Entry Control Point 20200328 20210328 420 Repairs scheduled on TA19CE0046 for Water Intrustion and other- CC Appurtenances, Flashing, Turnstiles.

3 - Past Due 6 6 6 6

73 763 SATEL CON STATION Atlas V Launch Ops Bldg at SLC- 3E

20200430 20210430 160 Bldg Appurtenances, power Wash 3 - Past Due 7 6 7 7

74 765 MSL/SPACE RSCH ENG 20200517 20210517 160 Bldg Appurtenances, power Wash, Roof Work 5 - Acceptable 8 8 8 8

75 771 FENCE ANIMAL SECURITY FENCE 20191018 20201018 40

Fence poles are corroding at the base where it enters the ground. Man gates have general corrosion. Undercutting at the backside of the complex. Recommend replacing poles that have severe metal loss and cementing where fence meets gully.

4 - Optimum 7 6 9 7

76 772 LIGHTING, EXT EXTERIOR AREA LIGHTING, SLC-

20191012 20201012 40 No Work Needed 5 - Acceptable 9 9 9 9

77 774 FENCE SECURITY FENCE 20191018 20201018 40

Fence poles are corroding at the base where it enters the ground. Man gates have general corrosion. Undercutting at the backside of the complex. Recommend replacing poles that have severe metal loss and cementing where fence meets gully.

4 - Optimum 7 6 9 7

78 774 GATE GATE, SECURITY FENCE 20191018 20201018 40

Fence poles are corroding at the base where it enters the ground. Man gates have general corrosion. Undercutting at the backside of the complex. Recommend replacing poles that have severe metal loss and cementing where fence meets gully.

4 - Optimum 7 6 9 7Sam

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

79 782 AUTO SWITCHING CEN Cable Hut #12 20191012 20201012 48 5 - Acceptable 8 8 8 8 80 789 GYMNASIUM SLC-3 Gymnasium 20200517 20210517 160 Bldg Appurtenances, power Wash, Roof Work 5 - Acceptable 8 8 8 8

81 843 ANTENNA WIND HUT VAFB FACIL 756 WINDS Site 054 Hut

20200107 20210107 20 Power Wash, Appurtenances 5 - Acceptable 8 8 8 8

82 843 ANTENNA SUPPORT STRUCTURE Wx Twr # 66 at NASA Clark Road, ID# 88

20200928 20210928 48 Hut and Tower Power Wash 5 - Acceptable 5 8 8 8 8

83 861 ADMIN OFC NON-AF LOSC Office Building 20200327 20210327 120 Appurtenances, Supports, Wall Issues 4 - Optimum 7 7 7 7 84 865 AUTO SWITCHING CEN Cable Hut #8 20200104 20210104 90 Appurtenances, Doors 5 - Acceptable 8 8 8 8 85 890 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20200922 20210922 300 Transformer & Disconnect, Power Wash Tower 5 - Acceptable 8 8 8 8 86 906 ELEC PWR S BLD TPQ-18 Generator 20200315 20210315 80 Completed 20180713 5 - Acceptable 9 9 9 9 87 907 RDR TMTR COMP BLDG TPQ-18 Radar Tracking 20200621 20210621 80 Minor CC 5 - Acceptable 9 9 9 9 88 908 WTR FR PMP STN WTR FR PMP STN 20200315 20210315 160 Vessels and Pump Station 4 - Optimum 7 7 7 7

89 909 ANTENNA SUPPORT STRUCTURE TPQ-18 ANTENNA ACCESS

PLATFORM

20200315 20210315 0 No Work Needed, Completed 20180713 5 - Acceptable 9 9 9 9

90 929 ELEC PWR S BLD Command Transmitter 5 Generator

20200609 20210609 200 Minor corrosion on loadbank and appurtenances 5 - Acceptable 9 9 9 9

91 930 ELEC SWITCH STN Command Transmitter 5 UPS 20200609 20210609 80 HVAC Units, conduit 4 - Optimum 7 7 7 7

92 934 AUTO SWITCHING CEN Cable Hut #9 20200609 20210609 480 Fascia, drip edge and gutters are corroded and need treatment.

Treat towers and replace non-OSHA compliant ladders.

3 - Past Due 7 6 7 7

93 935 ANT SUP STR CT-5 20200609 20210609 480 Fascia, drip edge and gutters are corroded. Treat towers. 3 - Past Due 4 7 6 7 7

94 960 MSL/SPACE RSCH TST

Solid Rocket Booster Counting Storage

20200928 20210928 1600 Facility Abandonded, Roof Damaged, Siding Missing & Corroded, Electrical boxes, Lighting Protection Poles, Bay doors, Transite Abatement & Remediation

3 - Past Due 7 4 7 6

96 974 ANTENNA SUPPORT STRUCTURE Wx Twr # 57 at HSF, ID# 81 20200925 20210925 50 Waiting on Coating Specifications and Approval. (5) Total, Hypergol and Oxidizer to be completed on TA19CE0019.

3 - Past Due 6 6 6 6

95 974 ANT SPT STRU ANT SPT STRU 20200619 20210619 40 Power Wash, Appurtenances 5 - Acceptable 9 9 9 9 97 1576 COMM HUT Comm Hut - Bldg. Shell 20200112 20210112 80 Appurtenances 5 - Acceptable 9 9 9 9 98 1576 ATS Automatic Transfer Switch 20200112 20210112 80 Appurtenances 5 - Acceptable 9 9 9 9

99 1577 COMM, TMTR ATC Ground to Air Transmitter 20200108 20210108 0 No Work Needed, CC Completed 20490109 5 - Acceptable 9 9 9 9

100 1579 COMM RCVR ATC Air to Ground Receiver 20200108 20210108 20 Conduit, Juntion Boxes 5 - Acceptable 8 8 8 8 101 1594 GATE Crash/egress gate 20200108 20210108 80 Gate 5 - Acceptable 8 8 8 8 102 1594 FENCE Security Fence 20200108 20210108 40 Appurtenances 5 - Acceptable 10 9 10 10 103 1598 ANTENNA SUPPORT STRUCTURE Antenna Structure 20191202 20201202 240 Tower, Appurtenances, Power Wash 5 - Acceptable 8 8 8 8 104 1611 ANTENNA SUPPORT STRUCTURE 20200929 20210929 0 Guy Wire's flash rust (no metal loss), Aluminum tower 5 - Acceptable 5 10 9 10 10 105 1617 AUTO SWITCHING CEN Cable Hut #3 20200602 20210602 0 Facility Completed 20180813 5 - Acceptable 10 10 10 10 106 1631 ANTENNA WIND HUT WINDS Hut 20191010 20201010 0 To be Completed on TA19CEC039 5 - Acceptable 8 8 8 8

107 1631 ANTENNA MiniSODAR at SLC-2, ID# None 20191010 20201010 0 To be Completed on TA19CEC040 3 - Past Due 7 7 6 7

109 1633 AST, ANTENNA WINDS Hut 20200602 20210602 1188 AST, Appurtenances, Includes Manlift. Guy wire shackles and dissimilar metals

3 - Past Due 3 6 6 6 6

108 1633 WIND HUT WINDS Hut 20200602 20210602 20 Power Wash, Appurtenances 5 - Acceptable 8 8 8 8

110 1638 FACILITY HAIR Radar UPS 20200108 20210108 160 Appurtenances, Ladder, New Install Air Housing coat and seal 4 - Optimum 7 8 7 7

111 1639 RDR TMTR COMP BLDG HAIR Radar & Antenna 20200108 20210108 160 Appurtenances, HVAC, Flashing needs repair, Platforms, Touch Up after Repairs, Repair TA in Progress

4 - Optimum 7 7 7 7

112 1682 COMM BLDG Large Comm Bldg on Tangair Road

20200328 20210328 160 Facility, Power Wash, Appurtenances, Installed equipment 4 - Optimum 7 7 8 7

114 1759 ANTENNA WIND HUT WINDS Hut 20200924 20210924 90 Appurtenances, Power Wash, A/C 3 - Past Due 7 5 7 6

113 1759 ANTENNA SUPPORT STRUCTURE Wx Twr # 5 at Balloon Release Site, ID# None

20200924 20210924 420 Facilty drip edge, gutters, cinderblock repair 3 - Past Due 4 7 5 7 6

115 1762 SATEL CON STATION Operational Support Test Facility

20200520 20210520 240 Facility, Installed Equipment 3 - Past Due 7 6 7 7

116 1764 SC LAB MET Weather Station 20200929 20210929 80 Facility, Installed Equipment 4 - Optimum 7 8 8 8

117 1768 MSL GDNC FCLTY MDA Test Launch Control Center

20200310 20210310 240 Last CC Completed 20171230 Appurtenances, Installed Equipment, Includes Man lift

3 - Past Due 7 6 7 7

118 1777 RSCH EQUIP STOR MDA Storage 20200217 20210217 80 AST 5 - Acceptable 9 9 9 9

119 1784 BE STOR CV FCLTY Crane Maintenance Warehouse 20200107 20210107 480 Appurtenances, Window, Doors and Roll Up Door Need Replacement (35K in Pricing)

3 - Past Due 5 5 6 5

120 1812 Deluge Water Tank Water Tank, MDA/MAB 20200205 20210205 600 Water Tank, Piping, Man lift needed 4 - Optimum 7 7 7 7 121 1819 MSL/SPACE RSCH TST Missile Assembly Building 20200317 20210317 700 Facility treated under TA20MDC006 3 - Past Due 7 7 6 7

122 1828 TRAFFIC CHK HSE Entry Control Point at Bldg

20200315 20210315 40 Appurtenances, Sealing 4 - Optimum 7 7 7 7

123 1829 Pump House Water Tank, MDA/MAB 20200315 20210315 80 Appurtenances, interior, Replace Doors, Work Scheduled on TA 4 - Optimum 7 7 7 7

124 1886 WEATHER HUT WEATHER HUT 20200120 20210120 0 No Work Needed, CC Completed 20190110 5 - Acceptable 9 9 9 9 125 1888 ANTENNA SUPPORT STRUCTURE Wx Twr # 59 at MAB, ID# 83 20200520 20210520 360 Power wash, Spot Tower, Coat as needed, Appurtenances 4 - Optimum 8 7 7 7 126 1891 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20200924 20210924 240 Power Wash, Appurtenances 5 - Acceptable 4 8 9 8 8

127 1894 MSL STG F MDA GBI Storage Facility ("Igloo")

20200929 20210929 160 Lights, Electrical, Appurtenances 4 - Optimum 7 7 7 7

128 1905 COMM FACLTY Cable Hut #18 20200205 20210205 0 No Work Needed, CC Completed 20180320 5 - Acceptable 10 10 10 10 129 1908 RIDT Water Booster Pump Bldg RIDT Booster Pump Station 20200205 20210205 40 Last CC Completed 20180320 5 - Acceptable 10 10 10 10

130 1909 RIDT Comm Hut #2 20200205 20210205 20 Last CC Completed 20171230 Appurtenances, Installed Equipment

5 - Acceptable 10 10 10 10Sam

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

131 1912 TANK, WATER RIDT FIRE WATER TANK 20200205 20210205 90 Water Tank, Ladder, includes Man lift 5 - Acceptable 8 8 8 8

132 1914 RIDT #1 Remote IFICS Data Terminal

(RIDT #1)

20200205 20210205 80 Entire RIDT, Polish and Clear Coat Stainless, Door, Front, Railing, seal vents, A/C Units Appurtenances

5 - Acceptable 8 8 9 8

133 1916 RIDT#2 Remote IFICS Data Terminal

(RIDT #2)

20200205 20210205 20 Last CC Completed 20180320 5 - Acceptable 10 10 10 10

134 1918 RIDT STORAGE BLDG RIDT Storage Building 20200217 20210217 20 Bollards, Pump Station 5 - Acceptable 8 7 10 8 135 1919 RIDT FIRE PUMP BLDG RIDT Fire Pump Building 20200217 20210217 160 Piping, Interior, Appurtenances 5 - Acceptable 9 9 9 9

136 1937 SATEL CON STATION HF Receiver Station (deactivated)

20200924 20210924 240 Facility drip edge, doors 5 - Acceptable 8 8 8 8

137 1950 AUTO SWITCHING CEN Cable Hut #6 20200205 20210205 20 Appurtenances 4 - Optimum 8 8 7 8 138 1956 RAD RELAY FCLTY HF Receiver Antenna #16 20200217 20210217 90 Appurtenances, Edge Work, Man lift 3 - Past Due 6 7 6 6

139 1959 MSL GDNC FCLTY Communications Hub for MDA Circuits

20200929 20210929 300 Condensing unit to be replaced, Tower at rear of facility minor

CC

4 - Optimum 7 7 7 7

140 1962 LF-21 LF-21 (MDA GBI) 20200310 20210310 60 Tower, Hut, Appurtenances 4 - Optimum 7 6 8 7 141 1964 LF-23 LF-23 (MDA Test Fac) 20200310 20210310 60 HVAC UNIT 4 - Optimum 7 7 7 7

142 1965 LF-24 LF-24 (MDA GBI) 20200310 20210310 60 Last CC Completed 20171230 Bollards, Conduit, Appurtenances, Camera Poles, Stainless

4 - Optimum 7 7 7 7

143 1968 ANTENNA WIND HUT VAFB FACIL WINDS Site Hut 20200328 20210328 0 Winds Hut 5 - Acceptable 9 9 10 9 144 1968 ANTENNA WIND HUT WINDS Hut 20200929 20210929 160 Power Wash & treat minor CC 5 - Acceptable 9 9 10 9 145 1971 LF-02 LF-02 (MDA GBI) 20200508 20210508 0 Last CC Completed 5/30/19 on TA18MDC064 5 - Acceptable 9 9 9 9 146 1972 LF-03 LF-03 (MDA GBI) 20200508 20210508 0 Last CC Completed 5/30/19 on TA18MDC064 5 - Acceptable 9 9 9 9 148 1983 AUTO SWITCHING CEN Weather Tower #60 at FL-08 20191113 20201113 90 Appurtenances, Wall work 5 - Acceptable 8 8 8 8

147 1983 ANTENNA SUPPORT STRUCTURE Wx Twr # 60 at LF-08, ID# 84 20200929 20210929 480 Minor CC on platforms, fiberglass ladder degraded, power wash hut and CC

5 - Acceptable 4 8 8 8 8

149 1985 TOWER / HUT Cable Hut #18 20200117 20210117 160 Base, Appurtenances, Bldg 4 - Optimum 7 7 7 7 150 1999 RAD RELAY FCLTY Cable Hut #19 20200929 20210929 160 Power Wash & treat minor CC 5 - Acceptable 8 8 8 8

151 2001 MSL/SPACE RSCH ENG MDA maintenance and storage 20201008 20211008 160 Facility, HVAC, Power Wash 4 - Optimum 7 7 7 7

152 2508 AUTO SWITCHING CEN Cable Hut #4 20191001 20201001 120 Appurtenances, Cabinet 4 - Optimum 7 7 7 7

153 2521 WEATHER HUT FOR ANTENNA

WIND HUT 2525

WINDS Hut 20201006 20211006 70 Power wash 5 - Acceptable 9 9 9 9

154 2525 ANTENNA SUPPORT STRUCTURE

Wx Twr # 51 near Bldg 3000, ID# 75

20201006 20211006 540 Power Wash Marine Growth, Guy Wire's connected to tower & deadmen are disimilar metals (SS - Alum), Stairs, Replace Gav Corroded Nuts

3 - Past Due 3 7 6 7 7

155 6510 ADMIN OFC NON-AF MDA/GMD HQ and admin offices

20200430 20210430 200 Facility Appurtenances, HVAC, Gen Shed, Enclosures 4 - Optimum 7 7 7 7

156 6511 RSCH EQUIP STOR MDA Storage 20200107 20210107 160 Appurtenances, Flashing 4 - Optimum 7 7 8 7 157 6713 ANTENNA SUPPORT STRUCTURE ANT SPT STRU 20200928 20210928 600 Loose Guy wires, Hut repair, Tower Appurtenances, 3 - Past Due 5 7 5 6 6 159 6819 Storage Igloo MDA Storage Bunker #6 20200310 20210310 100 Appurtenances, Connectors 4 - Optimum 7 7 8 7 158 6819 Bunker WINDOW AIR CONDITIONER 20200217 20210217 60 Appurtenances, Doors, Flashing 4 - Optimum 7 7 9 8

160 6832 WEATHER HUT TRANSFORMER 7 5 KVA WALL

MTED

20200528 20210528 30 Weather Hut, Power Wash, Appurtenances 5 - Acceptable 9 8 9 9

161 7011 COMM FACLTY Range Data Transfer Center 20200923 20210923 280 Appurtenances, Doors, Flashing, Repairs in Progress on TA 5 - Acceptable 8 8 8 8

162 7025 MSL/SPACE RSCH ENG WROCC 20200214 20210214 720 Chiller 5, Storefront Upper Left and Upper Right, Replace Benches, Chiller 6 and Appurtenances (When Installed)

4 - Optimum 7 7 7 7

163 7026 ANTENNA SUPPORT STRUCTURE VAFB FACIL 7026 ANT SPT

STRUCT

20200228 20210228 0 No Work Needed, Complete 20200327 5 - Acceptable 9 9 9 9

164 7050 ADMIN OFC NON-AF Range Real-Time Computer Center

20200106 20210106 420 Doors worked 20180205, Appurtenances, HVAC, Mech Rooms, Flashing

3 - Past Due 7 6 7 7

165 7053 FENCE SECURITY FENCES 20200106 20210106 0 No Work, Fence New 5 - Acceptable 8 8 8 8

167 8341 AUTO SWITCHING CEN 20200226 20210226 0 Block House Complete, Door Lead Abatement Complete, CC Scheduled on TA

5 - Acceptable 9 9 9 9

168 8401 SPACE OPS FAC JSpOC 20200916 20210916 960

All ladders need replacing, and are not OHSA compliant. Front Windows/Fascia/Paneling are beyond repair and need IMMEDIATE replacing (water intrusion, further deterioration, gutters, windows). Repairs on TA200014 (Not yet Submitted) CC Hours do not include front. paneling. Ladder and Roof Coating for leaks to be Subcontracted

3 - Past Due 6 6 6 6

169 8510 SPACE OPS FAC Remote Launch Control Center 20200312 20210312 80 CC to be Funded on TA20CEC041 5 - Acceptable 9 9 9 9

170 10577 Bollards Wx Twr # 75 near Vehicle Maint, ID# 68

20200114 20210114 60 Bollards 4 - Optimum 7 7 7 7

171 10709 ANTENNA SUPPORT STRUCTURE

AND HUT

Wx Twr # 75 near Vehicle Maint, ID# 68

20200118 20210118 0 No Work Needed, CC Completed 20190109 5 - Acceptable 9 9 9 9

172 10709 ANTENNA WIND HUT VAFB FACIL 10709 WINDS SITE

007 HUT

20200929 20210929 60 Power Wash, Appurtenances 4 - Optimum 7 7 7 7

173 12006 BARRICADE Barricade 20200114 20210114 70 Barrier 5 - Acceptable 8 8 8 8

176 21109 ANTENNA SUPPORT STRUCTURE Wx Twr # 73 at Weather Station, ID# 96

20200603 20210603 80 Tower, Appurtenances, Power Wash 4 - Optimum 5 7 7 7 7

174 21109 ANTENNA WIND HUT VAFB FACIL WINDS SITE HUT 20200430 20210430 0 Work Completed 20190110 5 - Acceptable 10 10 10 10

175 21109 ANTENNA MiniSODAR at Weather Station, ID# None

20200430 20210430 0 Work Completed 20190110 5 - Acceptable 10 10 10 10

177 21120 TOWER TPQ-39 BORESITE TOWER 20200603 20210603 240 Tower and Hut, Power Wash, Spot and Treat, grating 4 - Optimum 4 7 7 7 7

178 21149 ANTENNA WIND HUT VAFB FACIL 21149 WINDS Site 015 Hut

20200603 20210603 40 Appurtenances, Power Wash 4 - Optimum 4 7 8 7 7Sam

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

179 21150 AF GLOBAL W CEN 30 OG Weather Flight 20200603 20210603 480 Facility, Power Wash, Appurtenances, Installed equipment 3 - Past Due 7 6 7 7 180 21151 AUTO SWITCHING CEN Cable Hut #2 20200603 20210603 80 Exterior 4 - Optimum 7 7 7 7 181 21200 MSL/SPACE RSCH TST Command Transmitter 1 20200604 20210604 240 Facility, Power Wash, Appurtenances, Installed equipment 4 - Optimum 7 7 7 7

183 21202 ANTENNA SUPPORT STRUCTURE ANTENNA SUPPORT

STRUCTURE - CT-1 TWR

20200604 20210604 160 Appurtenances, Power Wash 4 - Optimum 4 7 7 7 7

182 21202 FACILITY VAFB FACIL 21201 20200604 20210604 80 Facility, Power Wash, Appurtenances, Installed equipment 4 - Optimum 7 7 7 7 184 21203 ELEC PWR S BLD CT-1 UPS/Generator 20200604 20210604 80 Exterior 4 - Optimum 7 7 7 7 185 23252 ANTENNA WIND HUT VAFB FACIL WINDS Site Hut 20200205 20210205 0 Last CC Completed 20180320 5 - Acceptable 10 10 10 10

186 23252 ANTENNA SUPPORT STRUCTURE

AND HUT

Wx Twr # 72 at VTS, ID# 69 20200205 20210205 0 No Work Needed 5 - Acceptable 9 9 9 9

187 10577 BOLLARDS SECURITY BOLLARDS

(HYDRAULIC)

20200107 20210107 70 Bollards, CC only 5 - Acceptable 8 8 8 8

188 1638A GENERATOR LOAD BANK AND

SWITCHGEAR

20200217 20210217 0 Switchgear, Load Bank, Generator being replaced TA18CE0008 5 - Acceptable 10 10 10 10

189 1765 SC LAB MET SC LAB MET 20200925 20210925 100 Gutters & fascia, Cinderblock Cracking (Repair and apply elastomeric).

4 - Optimum 7 7 7 7

190 1913 AUTO SWITCHING CEN AUTO SWITCHING CEN 20200217 20210217 20 Appurtenances 5 - Acceptable 8 8 8 8

191 460 Hut 465 AST ANTENNA WIND HUT VAFB FACIL 465 WINDS Site 064 Hut

20200120 20210120 0 No Work Needed, CC Completed 20190109 5 - Acceptable 9 9 9 9

192 6670 NITROGEN VESSEL 20200929 20210929 80 PV, Good Condition, Minor CC 5 - Acceptable 8 8 8 8 193 7017 Util Vault Util Vault 20200509 20210509 0 4 - Optimum 7 8 8 8 194 731 AC UNIT A/C PLT 5 TO 25 TN 20200118 20210118 0 AC Package Unit needs replacement / NO CC Needed 5 - Acceptable 9 9 9 9

195 740

REMOVED

ANTENNA WIND HUT VAFB FACIL 740 WINDS SITE

300 HUT (AC UNIT)

20200717 20210717 0 REMOVED 4 - Optimum 7 7 7 7

196 752 ELEC E/PWR GEN PLT ELEC E/PWR GEN PLT 20191010 20201010 0 4 - Optimum 7 8 8 8 197 8310 HELIUM VESSEL 20200929 20210929 90 Minor CC 5 - Acceptable 8 8 8 8 198 8314 PDEU GENERATORS 20191009 20201009 80 All PDEU Upgrades Complete, CC as needed on PMs 5 - Acceptable 8 8 8 8 199 8511 FENCE SECURITY FENCE 20200217 20210217 120 CC to be Funded on TA19CEC036 5 - Acceptable 9 9 9 9

200 900 MSL/SPACE RSCH ENG MSL/SPACE RSCH ENG 20200928 20210928 600

Facility Abandonded, Roll Up door missing, Door Eaves, Fascia, Electical disconnect & panel wire exposed to elements.

4 - Optimum 8 7 8 8

201 912 ANTENNA SUPPORT STRUCTURE TPQ-18 ANTENNA/PEDESTAL 20200609 20210609 0 AST Pedestal, Completed by Others, 20180601 5 - Acceptable 9 9 9 9 202 914 TANK, WATER FR PROTECTION WTR STOR 20200609 20210609 80 Completed 20180702 4 - Optimum 7 7 7 7

203 CYRDG 326 TOWER OSS #1 RF/COMM TOWER,

LATTICE STYLE

20191001 20201001 0 Tower treated on TA19CEC039 5 - Acceptable 10 10 10 10

204 HSF HYPERGOLIC PVS 20191017 20201017 1200

Coating of (4) Vessels scheduled for 20200203. Hypergol and Oxidizer to be completed on TA19CE0019. Work to continue subsequent to Vessels, New UT Testing and CC Awaiting approval, TA20CEC037

3 - Past Due 6 6 6 6

205 Lionshead ANTENNA SUPPORT STRUCTURE ASS, Huts 20201005 20211005 960 Minor CC, Appurtenances- Tower needs Climbing cable installed, Replacement Tentative

3 - Past Due 2 7 4 7 6

206 MGCNY ANTENNA SUPPORT STRUCTURE Wx Twr # 76 at Miguelito Canyon, ID# 74

20191001 20201001 0 No Work Needed, CC Completed 20181107 5 - Acceptable 9 9 9 9

207 MGCNY ANTENNA WIND HUT VAFB FACIL WINDS Site Hut 020 20191001 20201001 0 No Work Needed, CC Completed 20181107, Electrical Problems and A/C being worked by O&M

5 - Acceptable 9 9 9 9

NONE

Bixby Ranch

TOWER

OSS #6 RADAR TOWER,

MONOPOLE STYLE

20191120 20201120 450 Facility, Tower, Power Wash, Grounds, Includes Manlift 3 - Past Due 6 6 6 6

209 OM059 FACILITY Doors, Appurtenances 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190821.

5 - Acceptable 8 8 9 8

210 OM063 FACILITY OAK MT FACIL 66 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190630. Transite abatement needed

5 - Acceptable 9 9 9 9

211 OM064 ELEC PWR S BLD Oak Mtn Power Station 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190719.

3 - Past Due 5 4 9 6

212 OM065 WEATHER STRUCTURE OAK MT FACIL 86 20200729 20210729 80 Tower weights and bolts. 5 - Acceptable 9 9 10 9

213 OM066 TANK, WATER WATER TANK 20200729 20210729 340 Power Wash, Minor Repair, Piping from Tank to Pump House, Ladder and Roof

5 - Acceptable 8 8 8 8

214 OM067 WTR FR PMP STN Oak Mtn Fire Pump house 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190630.

5 - Acceptable 9 9 8 9

215 OM068 TRAFFIC CHK HSE Oak Mtn ECP 20200729 20210729 240 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190827.

4 - Optimum 6 8 7 7

216 OM070 MSL/SPACE RSCH TST Oak Mtn Technical Support Building

20200729 20210729 160 Completed 20190724 4 - Optimum 7 7 9 8

217 OM073 FACILITY UPS system for Bldg 89 Raydome Facility

20200729 20210729 60 5 - Acceptable 8 8 9 8

218 OM075 SATEL CON STATION Telemetry Relay Station Ops Bldg

20200729 20210729 280 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190924.

5 - Acceptable 8 8 8 8

219 OM075 HVAC 1 HVAC 1 20200729 20210729 80 Unit scheduled for replacement 5 - Acceptable 9 9 9 9 220 OM075 HVAC 2 HVAC 2 20200729 20210729 80 Unit scheduled for replacement 5 - Acceptable 9 9 9 9 221 OM080 FACILITY OAK MT FACIL 80 20200210 20210210 80 Completed on 20190630 4 - Optimum 7 7 7 7 222 OM081 FACILITY OAK MT FACIL 81 20200210 20210210 240 Completed on TA18CEC100 Oak Mnt CC 5 - Acceptable 8 8 9 8

223 OM082 ANTENNA SUPPORT STRUCTURE ANTENNA SUPPORT

STRUCTURE

20200729 20210729 40 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190724.

5 - Acceptable 9 9 9 9

225 OM084 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190712.

5 - Acceptable 10 10 10 10Sam

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

224 OM084 FACILITY OAK MT FACIL 84 20200729 20210729 0 Completed on TA18CEC100 Oak Mnt CC and Minor Repair Scheduled 20190712.

5 - Acceptable 9 9 9 9

226 OM086 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20200729 20210729 0 5 - Acceptable 9 10 10 10

227 OM088 SHLTR W INSTM Weather Tower #65 at Oak Mtn 20200729 20210729 0 5 - Acceptable 7 9 10 9

228 OM088 AST UPS system for Bldg 73 Raydome Facility

20200729 20210729 980 Culimation Tower, DTR and Work Needed 4 - Optimum 7 7 7 7

229 OM089 FACILITY FACILITY PERSONNEL DOORS 20200729 20210729 80 5 - Acceptable 9 9 9 9

230 PC001 ANTENNA SUPPORT STRUCTURE ANT SUPPORT STRUCT OSS #5 20200917 20210917 960 Tower is aluminum and chalking, Coating has failed and deadmen are severly corroding due to disimilar metals (SS to Galv)

5 - Acceptable 2 9 9 9 9

231 PP001 WHSE SUP & EQUIP BSE N/A 20200514 20210514 160 Buiding eave has errosion damage and Fascia and drip edge damage. TA20CE0042 to conduct repairs

5 - Acceptable 9 9 9 9

232 PP002 BE MAINT SHOP N/A 20200514 20210514 80 Work Completed 20190604, Work to continue after repairs TA 5 - Acceptable 9 9 9 9

233 PP003 ADMIN OFC NON-AF N/A 20200514 20210514 80 Work Completed 20190611, Work to continue after repairs TA 5 - Acceptable 9 9 9 9

234 PP008 ELEC PWR S BLD N/A 20200514 20210514 160

Work Completed 20190610, Work to continue after repairs TA.

Work Needed after repair, HVAC enclosure, Roll Up door brackets

3 - Past Due 6 6 7 6

235 PP009 OBSERVATORY (LUNCH ROOM) N/A 20200514 20210514 40 Work Completed 20190531, Work to continue after repairs TA. 5 - Acceptable 8 8 8 8

236 PP010 SATEL CON STATION Command Transmitter 4 20200514 20210514 180 Facilities ciderblock walls are damaged in areas due to deterioation and errosion. Minor CC in the HVAC shead.

3 - Past Due 5 5 7 6

237 PP012 POWER PLANT Pillar Pt Power Plant 20200514 20210514 60 Work Completed 20190608, Work to continue after repairs TA.

Doors

5 - Acceptable 9 9 9 9

238 PP013 MSL/SPACE RSCH TST Pillar Pt Telemetry Station 20200514 20210514 240 Work Completed 20190625, Work to continue after repairs TA.

HVAC Enclosure, Doors Replacement, Lights Touchup. Interior Air Handler is severely Corroded and needs CC or replacement.

3 - Past Due 5 5 5 5

239 PP015 TANK, WATER FIRE PROTECTION WATER

STORAGE TANK

20200514 20210514 60 Work Completed 20190604, Work to continue after repairs TA.

Hatch Repairs

5 - Acceptable 8 8 8 8

240 PP016 WTR FR PMP STN Water Pump Station 20200514 20210514 120 Work Completed 20190514, Work to continue after repairs TA.

Replace Diesel Tank

5 - Acceptable 8 8 8 8

241 PP017 RDR TWR BLDG FPQ-6 Radar & Logistics 20200514 20210514 240 Work Completed 20190625, Work to continue after repairs TA.

Replace Doors and Lights. Roof needs to be power washed.

Cinderblock needs repairs in areas

3 - Past Due 5 7 7 6

242 PP022 ANTENNA SUPPRT STRUCT N/A 20200514 20210514 240 Work Completed 20190606, Work to continue after repairs TA.

Replace Lights, Roofing, Electrical

3 - Past Due 6 6 8 7

243 PP025 BOOSTER PUMP HOUSE N/A 20200514 20210514 0 Complete Rebuild completed 20190619 on TA Repairs 5 - Acceptable 10 10 10 10 244 PP034 WHSE SUP & EQUIP STORAGE N/A 20200514 20210514 160 Floors, Roll Up Door, Entryway 5 - Acceptable 8 8 8 8 245 PP084 ACCESS ROAD PILLAR POINT ACCESS ROAD 20200514 20210514 360 Bollards, Lining, Manholes, Hydrants, Chains 3 - Past Due 6 6 8 7 246 PP087 FENCE & GATE SCTY FENCE, SITE 20200514 20210514 80 Minor CC, Gates 5 - Acceptable 9 9 9 9

247 PP105 SP ENTRY CON BLDG Pillar Point ECP 20200514 20210514 160 Touch up and Minor CC after Repairs TA. Repair Lights, Vents, Windows

3 - Past Due 5 5 5 5

248 PP110 WAREHOUSE N/A 20200514 20210514 240 Siding corroded at fascia and at the bottom. 3 - Past Due 7 7 6 7

249 PP120 BORESITE SUPPORT BLDG PILLAR PT BORESIGHT TWR

FACIL 123

20200514 20210514 80 Appurtenances 4 - Optimum 7 7 7 7

250 PP123 BORESITE TOWER

PILLAR PT BORESIGHT TWR

FACIL 123

20200514 20210514 1580 CC and Minor Repair of Tower. Waiting 813 requirements, Hours are for Power Wash and Water Capture, 980 Hours without Water Capture

2 - Critical 3 4 4 4 4

251 PP221 TRANSFORMER PAD N/A 20200514 20210514 80 Good Condition 5 - Acceptable 8 8 8 8

PP250

BACKFLOW

BACKFLOW ON BOTTOM OF MAIN

ROAD

PILLAR PT BORESIGHT TWR

FACIL 123

20200514 20210514 80 Backflow and valves 4 - Optimum 7 7 7 7

253 PRSMA ANTENNA SUPPORT STRUCTURE ANT SPT STRU OSS #3 20200818 20210818 120 No Work Needed, Completed 20180522 5 - Acceptable 10 10 10 10

SL001

(SLO

LIGHTHOU

SE)

ANTENNA SUPPORT STRUCTURE ANT SUPPORT STRUCT OSS #4 20200620 20210620 24 Gate clasp has been damaged and needs repaired. 5 - Acceptable 9 9 9 9

255 SVGN2 SLC-4 HPGSA 20191121 20201121 880

PV's Minor Corrosion and Power Wash, Repairs to be scheduled with All GN2 Risers, Certificatin TA in development

4 - Optimum 7 7 7 7

257 SVGN2 SLC-3 GN2 Riser 20191121 20201121 0 CC Completed 201291121 5 - Acceptable 10 10 10 10 258 SVGN2 Surf & Kelp Rds. 20191115 20201115 0 CC Completed 201291115 5 - Acceptable 10 10 10 10 259 SVGN2 Surf Rd 20191115 20201115 0 CC Completed 201291115 5 - Acceptable 10 10 10 10 256 SVGN2 SLC-4W GN2 Riser 20200914 20210914 840 Tanks need testing & CC, Valves, SS piping, & Panel 3 - Past Due 7 6 7 7

260 SY021 FACILITY

SANTA YNEZ FACIL 1 MSL

INSTM STN

20200117 20210117 120

Asbestos and Lead paint abatement in progress on TA20-11.

Facility will receive elastomeric coating, inside and out, patch degraded concrete eeve, repair roof membrane. Window are old aluminum style, recommend replacement

5 - Acceptable 10 10 10 10

261 SY001 LIGHTING LIGHTING - EXTERIOR 20200117 20210117 24 And Poles, Includes cost of Man lift, (Lighting needs upgrade). 4 - Optimum 7 7 7 7

262 SY001 AC UNIT LENNOX SPLIT SYSTEM 20200117 20210117 0 4 - Optimum 7 7 7 7Sam

Line Facility Number Inventory Name

Common Name/Description

Date Last Inspected

Next Scheduled Inspection Date

Estimated Manhours

(Corrosion Control and Repair)

Assets to be Processed (Listed Items for Corrosion Treatment or Other Repairs)

Overall Site/Equipment Condition

Corrosion and/or Repair

Structural Condition Code

RUST DISTRIBUTION

TYPE S-SPOT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE G-GENERAL

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE P-PINPOINT

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

RUST DISTRIBUTION

TYPE HYBRID 0-10

(ASTM D610 RUST RANGE

10: < .01% to 0: > 50% RUST)

Estimated Total Cost

(Corrosion Control Repair &

Subcontracts)

263 SY007 ELEC PWR S BLD N/A 20200117 20210117 160

Facility has old generator appurtenances still attached to facility.

Recommend removing and recoating facility with elastomeric

3 - Past Due 7 6 7 7

264 SY012 WHSE SUP & EQUIP BSE Storage at SY Peak Optics Site 20200117 20210117 80 Last CC Completed 20171230 Bollards, Conduit, Appurtenances, Camera Poles, Stainless

5 - Acceptable 9 9 9 9

265 SY021 FACILITY SANTA YNEZ FACIL 21 20200117 20210117 80 Appurtenances 5 - Acceptable 8 8 8 8

266 SY021 FENCE FENCE 20200117 20210117 120

Fence and gate need replacement in many areas, new barbed and/or razor wire, Gate CC or Repair Costs exceed replacement cost

3 - Past Due 5 5 5 5

267 SY021 LIGHTING LIGHTING - EXTERIOR 20200117 20210117 80 And Poles, Includes cost of Man lift, (Lighting needs upgrade). 4 - Optimum 7 7 7 7

268 SY021 TANK, WATER WATER TANK 20200117 20210117 0 Water Tank in Progress on TA 4 - Optimum 7 7 7 7

269 SY023 ANTENNA SUPPORT STRUCTURE ANT SUP STRUCTURE 20200117 20210117 340 Antenna is in optimum coating condition. Includes Man lift Cost 4 - Optimum 4 7 6 9 7

Sam

A001 Submittal Sheet

File details come from the government source that posted it. Updated .