This document contains a request for proposal for launch operations support contract services. The 30th Space Wing at Vandenberg Air Force Base is soliciting proposals to provide facility assessment, maintenance, and other support services. Interested offerors must submit proposals by January 27, 2022. The North American Industry Classification System code for this effort is 561210. The incumbent contractor will perform a facility assessment utilizing the provided template and submit the report to the Space Launch Delta 30/Program Management Division. The assessment will include condition ratings for building components, identification of short and long-term facility issues, and recommendations for repair priorities.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-4_Section L dtd 19Nov21_Revised_30Aug22.pdf PDF
L-5_Section M dtd 19Nov21_Revised_30Aug22.pdf PDF
L-4_Section L dtd 19Nov21_Revised_04Feb2022.pdf PDF
RFP Amendment 0004 Conf SF33 - FA461022R00010004.pdf PDF
RFP Amendment - FA461022R00010002 Conf SF33 20220118.pdf PDF
Atch 8 SCA WD 2015-5637_Rev 19_20211020_12Jan2022.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Revised_11Jan2022.pdf PDF
Solicitation - FA461022R0001_20211209.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Final_9Dec2021.pdf PDF
Atch 2_Appendix B_Antenna Tower Responibility List_Final_9Dec2021.pdf PDF
Atch 2_Appendix G_Environmental Requirements_Final_9Dec2021.pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment_9Dec2021.pdf PDF
Atch 7 DB WD CA20210018_Mod 28_20211203.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A.pdf PDF
Atch 11 CBA-2019-12949.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029.pdf PDF
Exhibit A_CDRL_A001_Corrosion Prevention and Control Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A006_Technical Report Waster Water Discharge_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A009_Program Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A015_Solid Waste Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A016_HMMP Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A019_Cost Peformance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A021_JOCAS Reports_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A023_RCM Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A024_Work Order Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A026_System Safety Program Plan_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-td002_-en-e.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020E000000.pdf PDF
TECH LIBRARY 1 Func Desc Instrux - Control - ACGAL020S000002_B.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals EthosEnergy Speed Input Module II User Manual.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-OB32 Contact Output Module.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Axiomatic 0-200mA to 4-20mA Converter.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 3044102 (1).pdf PDF
TECH LIBRARY 2-8310-PV-181-VTE-20210225.pdf PDF
TECH LIBRARY 6-PTO-13968-R2-Final.pdf PDF
TECH LIBRARY 13-CDRL_A005_FUGITIVE REPORT_example.pdf PDF
TECH LIBRARY 13-CDRL_A025_Generator Testing and Maint Report_example.pdf PDF
Exhibit A_CDRL_A011_Quality Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A012_Requisition Summary_Final_9Dec2021.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 2_Appendix K_Compliance documents_Final_9Dec2021.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO.

FA4610-22-R-0001

F. CONTRACTOR

1. DATA ITEM NO.

A027

2. TITLE OF DATA ITEM

Facility Assessment Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS 4.5

6. REQUIRING OFFICE

SLD30/PMD

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

F

10. FREQUENCY

ANNLY

12. DATE OF FIRST SUBMISSION

365 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

10 DARP Draft

Final

Reg Repro

16. REMARKS

The contractor shall perform a Facility and Equipment assessment for LOSC facilities. The assessment shall include the following:

Source Data: Visual inspection, historical data (service calls, Work Orders, CCMS) System/Component Assessment: Provide a color rating for the components listed in template. Any L2 System with a yellow + rating or lower must include a system issue write-up.

Facility Issue(s): Brief description of issue with details at the L3 Component level. Include short term (12 mos) and long term (12-36 mos) proposed plan.

Recommendation: Provide recommendations and prioritization for future work

This will provide the Government awareness of potential impacts to the mission and assist in prioritizing and execution of TO’s under CLINX007.

Refer to attached example/template.

SLD30/PMD 0 1 0

30 CE/CEOES 0 1 0

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page ____of ____Pages

18. ESTIMATED

17. PRICE GROUP

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MISC

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

F. CONTRACTOR

16. REMARKS (Continued)

Source Data: Visual Building: 7025 EXAMPLE/TEMPLATE Inspection Date: 1 Sep 23 System: Condition:

A Substructure (+) B Shell (-) C Interiors (-) D Services (+) E Equipment & Furnishings F Special Construction G Building Sitework Other (+) Facility Issues Short Term (12 mos)

HVAC-AHU-003 currently uses a condensing unit that utilizes R-22 refrigerant. R-22 is being phased out due to environmental concerns and will be difficult to find once spare supplies have been exhausted.

Facility Issues Long Term (12-36mos)

Roof-In the last year we’ve had to respond to roof leaks on three different occasions.

Substantial areas of the vapor barrier require replacement. Roof shingles are prone to blow away during larger storms during the winter months. The northwest corner of the roof has substantial deterioration issues that will require continued attention and leak response.

Fire Protection - The fire water piping is routed around existing structures and equipment, leaving the pipe supports out of compliance with established codes and regulations. Additional sprinkler heads are required near the ventilation units.

Recommendations HVAC - Failure of AHU-003 after R-22 supplies have been exhausted would substantially impact our ability to cool the infrastructure room which is mandatory for launch. Recommend immediate initiation of system upgrade to ensure system replacement prior to exhaustion of spare supplies ROOF- To date leaks have been correctable using patching methods, but frequency of leaks has been increasing. Recommend the government plan for a full roof replacement within the next 2-3 years.

Fire Protection - Mission impact from fire protection is low and does not need immediate attention.

DD FORM 1423-1, FEB 2001 Page of Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MISC

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), Feb 2001