Atch_10-CWBS_Matrix.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Halvorsen CLS Bridge Federal contract opportunity
- Solicitation number
- FA8534-24-R-0004
About this file
This document is an attachment titled "Atch_10-CWBS_Matrix.xlsx" that is part of a Request for Proposal (RFP) for a federal contract opportunity. The RFP is for a 5-year, Fixed Price Incentive Firm Target (FPIF)/Firm Fixed Price (FFP)/Reimbursable-No Fee Indefinite Delivery/Requirements-type contract to provide Contractor Logistics Support (CLS) for the Halvorsen 25K Aircraft Cargo Loader. The key details include:
The offeror is required to complete a CWBS (Contract Work Breakdown Structure) Matrix by inserting rows and populating columns with their CWBS Level 3 elements, labor categories, labor hours, and a narrative description of the material requirements. The CWBS Matrix covers two major segments: Material Management (parts, material management infrastructure, and program administration) and Program Engineering Support (systems engineering, change activity, and program administration). The government intends to award a sole source bridge contract to Leonardo DRS for this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_5-Halvorsen_GFE_GFM.xlsx | XLSX spreadsheet | |
| Atch_2-QASP.pdf | ||
| Atch_1-PWS.pdf | ||
| Atch_7-Provisions_for_SOFA_ROK.pdf | ||
| Atch_4-Safety_Appendix.pdf | ||
| FA8534-24-R-0004.pdf | ||
| Atch_8-Halvorsen_Registration_Numbers.pdf | ||
| Exhibit_A_CDRLs.pdf | ||
| Atch_3-TDP.pdf | ||
| Atch_9-Cost_Proposal_Adequacy_Structure.pdf | ||
| Atch_6-Halvorsen_Metrics_Determination_and_Incentive_Fee_Arrangement.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| ATTACHMENT 10 Dated: 23 Feb 2024 |
| The offeror shall fill out Matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements |
in column 4. Afterwards, proceed to populate columns 5 thru 7. Do not include cost or prices).
| MATRIX OF CWBS ELEMENTS/ CLINs,/ MATERIAL & LABOR | |||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| BEQ | CLIN | CWBS- LEVEL 1 | CWBS- LEVEL 2 | CWBS- LEVEL 3 | Labor Category | Labor Hours | Narrative Description of How You Determined Material Requirements to Accomplish this WBS Element (additional sheets may be attached for extended |
explanations) 35,000 hrs 0002, X002 1. MATERIAL MANAGEMENT 1.1 Parts (price per operating hour) See note 1
12 mo 0001, X001 1.2 Material Management (infastructure)
1.3 Program Administration
| 12 mo | 0003, X003 | 2. PROGRAM ENGINEERING SUPPORT | 2.1 Systems Engineering |
| Engineering | |||
| 2.2 Change Activity | |||
| Activity | |||
| 2.3 Program Administration | |||
| Administration |
Offeror completes columns 4-7 for each level 3 CWBS element for MM and PES segments.
*Applies to unqualified sources only Note 1: 1.1, the level 3 CWBS shall be segregated into depot level repair parts and expendable parts
File details come from the government source that posted it. Updated .