This document is a Statement of Work (SOW) for a contract to mill and overlay the damaged asphalt of the entrance road in the Playlinda District of Canaveral National Seashore, Titusville, FL. The contractor must provide all labor, tools, equipment, materials, transportation, and supervision required to complete the work. The tasks include milling and overlaying 1,200 square yards of pavement, making sufficient passes to achieve the necessary profile, cross-slope, grade, and elevations, and ensuring continuous access to the park entrance during construction. The contractor must obtain Superpave Asphalt Concrete from an approved plant, construct and erect all signs in accordance with the Manual on Uniform Traffic Control Devices, and comply with Environmental Protection Agency laws and regulations. The work hours are from 7:30 am to 4:00 pm, Monday through Friday, excluding federal holidays. The contractor must coordinate the work schedule with the Contracting Officer's Representative.

View the file

Other files for this federal contract opportunity

Other files attached to Mill & Overlay Roadway-CANA, newest first.
File Type Posted
Sol_140P5424R0016_Amd_0001.pdf PDF
Atch_1_to_Amd_1_QandAs_0001.pdf PDF
Atch_3-Site_Visit_Info.pdf PDF
Sol_140P5424R0016.pdf PDF
Atch_2_DBA_WD-Brevard_County.pdf PDF
Atch_4_Area_Layout_and_Photos.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5424R0016 Attachment 1

Page 1 of 2 Pages

CANAVERAL NATIONAL SEASHORE (CANA)

Playlinda District

Statement of Work (SOW)

MILL & OVERLAY PLAYALINDA ENTRANCE ROAD

Contractor to provide all labor, tools, equipment, materials, transportation, and supervision required to mill and overlay damaged asphalt at the entrance road in Playlinda District of Canaveral National Seashore, Titusville, FL 32789. All work shall be accomplished using approved durable and resilient materials and applied in accordance with applicable codes and standards. (Refer to attachment 4 for project area layout and photos)

The asphalt pavement roadways are in good condition, with many years of remaining useful life with the large exception that the fine graded asphalt overlay has failed due to shoving. These shoving cracks resulted from the lack of bond between the surface layer and the course beneath.

The asphalt thicknesses measured to be a total of 5 inches. There are two layers of asphalt. The bottom layer consists of 3 ½ to 3 ¾ inches of SP-12.5 mm asphalt. Above is an overlay of 1 ¼ to 1 ½ inch of a fine graded friction course (FC-5mm). The surface course was not attached to the structural course. It does not appear that tack was used for the overlay. Below the asphalt was presumed to be suitable limerock base course.

Offerors are encouraged to propose improvements and use industry best practices in their proposals, while maintaining the minimum technical approach requirements as described in this document.

Tasks:

1. Mill and Overlay 1,200 square yards of pavement and must provide the mobilization of equipment, milling, tack coat, resurfacing with 1.5” SP-9.5 (Superpave Asphalt Concrete pavement), and striping (Thermoplastic) back to its current configuration.

2. Make sufficient passes so that the designated area is milled to necessary profile, cross-slope, grade and elevations.

3. Mill the pavement in depth increments that will not damage the pavement below the designated finished grade. If scabbing or delamination occurs, the milled surface is unlikely to meet smoothness requirements. Notify the Contracting Officer for further direction when delamination or scabbing occurs.

4. Recycle or dispose milled material legally off the project.

5. After completion of the final milling and clean-up, test the finished milled surface with the straightedge. Correct surface irregularities that depart from the testing edge by more than 1/4 inch.

Other contractor responsibilities

1. Ensure continuous access to park entrance at Canaveral National Seashore to minimize traffic disruptions during construction.

2. Obtain Superpave Asphalt Concrete from a plant that is currently on the FDOT’s Production

Facility Listing.

3. Construct and erect all signs in accordance with the "Manual on Uniform Traffic Control

140P5424R0016 Attachment 1

Page 2 of 2 Pages

Devices" (MUTCD), latest edition.

4. Validate all measurements and quantities of project area.

5. Prior to implementing project, project plans will be reviewed by Canaveral National Seashore resource management staff. Where required, surveys for gopher tortoise burrows will be carried out and any existing burrows will be flagged for avoidance by resource management staff.

6. If native wildlife (gopher tortoise, etc) is present in the work area, all work will stop and individuals will be allowed to leave the work area undisturbed prior to restarting work. Moving or otherwise disturbing wildlife is not authorized.

7. To reduce the potential for introduction of non-native species, all equipment will be clean and free of visible debris (mud, plant materials, etc) prior to entering Canaveral National Seashore.

Removal of vegetation not authorized without review and approval by Canaveral NS resource management staff.

Working Hours: 7:30 am to 4:00 pm, Monday through Friday, excluding Federal holidays. The contractor shall coordinate specific on-site work schedule with the Contracting Officer’s Representative

(COR).

Safety & Environmental Compliance: The contractor shall comply with pertinent Environmental Protection Agency (EPA) laws and regulations and immediately report to the CO, COR and Park Safety Officer all accidents resulting in employee injury or death or damage to property while performing this contract.

Motor Vehicle & Traffic Regulations: Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be always maintained in the vehicle and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits.

1. Mill and Overlay 1,200 square yards of pavement and must provide the mobilization of equipment, milling, tack coat, resurfacing with 1.5” SP-9.5 (Superpave Asphalt Concrete pavement), and striping (Thermoplastic) back to its current configuration.
2. Make sufficient passes so that the designated area is milled to necessary profile, cross-slope, grade and elevations.
3. Mill the pavement in depth increments that will not damage the pavement below the designated finished grade. If scabbing or delamination occurs, the milled surface is unlikely to meet smoothness requirements. Notify the Contracting Officer for furt...
4. Recycle or dispose milled material legally off the project.
5. After completion of the final milling and clean-up, test the finished milled surface with the straightedge. Correct surface irregularities that depart from the testing edge by more than 1/4 inch.
Other contractor responsibilities
Working Hours: 7:30 am to 4:00 pm, Monday through Friday, excluding Federal holidays. The contractor shall coordinate specific on-site work schedule with the Contracting Officer’s Representative (COR).
Safety & Environmental Compliance: The contractor shall comply with pertinent Environmental Protection Agency (EPA) laws and regulations and immediately report to the CO, COR and Park Safety Officer all accidents resulting in employee injury or death...
Motor Vehicle & Traffic Regulations: Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be always maintained in the vehicle and made a...