Atch 1 - PWS.pdf

PDF 257 KB Posted

Attached to
AFIT River Rock Border Solicitation
Solicitation number
FA860126Q0113
Issued by

About this file

This is a Performance Work Statement (PWS) for a river rock border installation project at the Air Force Institute of Technology (AFIT), Wright-Patterson Air Force Base, Ohio.

The Contractor shall install a uniform three-foot wide #4 size river rock border over a secured commercial-grade weed barrier around the exterior foundation of six specified AFIT buildings (20640, 20641, 20642, 20643, 20644, and 20646). The project objectives are to prevent weed growth against building foundations and establish a clean, durable border that improves grounds maintenance and mowing operations. All services must be completed during a single dedicated performance window in September 2026. Work shall be performed at 2950 Hobson Way, Wright-Patterson AFB, OH 45433, during standard operating hours of 0700-1600 Monday through Friday, excluding federal holidays. The Contractor is responsible for providing all personnel, equipment, tools, materials, supervision, transportation, and for the complete removal and lawful disposal of existing turf, vegetation, and excavated debris. No partial progress payments are authorized; payment representing 100% of the contract value shall be authorized upon final, acceptable completion of all requirements. Invoices must be submitted electronically through the DoD Wide Area Workflow (WAWF) portal upon service sign-off. The Contractor must submit WPAFB Form 1440 access request forms for all personnel a minimum of 10 to 15 business days prior to September 25, 2026, and must obtain formal authorization from the WPAFB HAZMAT Cell prior to bringing any chemicals onto base. The Performance Requirements Summary establishes an Acceptable Quality Level of 95% of total linear footage for the river rock border installation and zero allowable deviations for site preparation/cleanup and protection of government property, with all damage liability borne by the Contractor.

View the file

Other files

File Type Posted
Atch 1 PWS Updated 2.0.docx DOCX document
Atch 1 - PWS Updated.pdf PDF
Atch 6 - AFIT Sq Ft and Dimensions.pdf PDF
Atch 5 - QA.pdf PDF
Atch 4 - Solicitation - FA860126Q0113.pdf PDF
Atch 2 - Wage Determination.pdf PDF
Atch 3 - AFIT Campus Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Note: the links and images in this document may point to external sources. Please review them before opening.

PERFORMANCE WORK STATEMENT

(PWS)

RIVER ROCK BORDER INSTALLATION

AIR FORCE INSTITUTE OF TECHNOLOGY (AFIT), WRIGHT-PATTERSON AFB, OH

1.0 DESCRIPTION OF SERVICES

The Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to install a three-foot wide river rock stone border around the exterior of all specified Air Force Institute of Technology (AFIT) buildings. The primary objectives are to prevent weed growth against the building foundations and to establish a clean, durable border that improves the efficiency of grounds maintenance and mowing operations.

1.1 Scope of Work

The Contractor shall provide a completed three-foot (3') wide #4 size river rock border over a secured, commercial-grade weed barrier along the entire exterior foundation of specified buildings. The contractor shall ensure complete removal and lawful disposal of all existing turf, vegetation, and excavated debris. The services shall be performed on the AFIT campus located at Wright-Patterson AFB. The specific facilities included in this requirement are: Building 20640, Building 20641, Building 20642, Building 20643, Building 20644, Building 20646.

1.2 Schedule and Performance Period

• Performance Window: All services shall be completed during the single dedicated period of September, 2026.

• Contract Type Clarification: Although the parent agreement references a "Base Period – 1 Year Service Agreement," this specific task order is strictly limited to a single event during the designated September 2026 window.

• Exclusions: Ongoing preventative maintenance inspections, standard replacement parts, software services, emergency service call responses, and recurring progress reports are explicitly excluded from this scope.

2.0 PLACE OF PERFORMANCE & HOURS OF OPERATION

2.1 Place of Performance

All work shall be performed at the Air Force Institute of Technology (AFIT) campus, located at:

2950 Hobson Way, Wright-Patterson AFB, OH 45433

The contract covers the following six (6) buildings:

Buildings 20640, 20641, 20642, 20643, 20644, and 20646

2.2 Hours of Operation

• Standard Operating Hours: The Contractor shall perform all work between 0700 and 1600 hours, Monday through Friday.

• Federal Holiday Exclusions: No work shall be scheduled or performed on Federal Holidays:

• New Year’s Day, Martin Luther King Jr. Day, Washington's Birthday

(Presidents' Day), Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

• After-Hours and Weekend Requests: Any deviation from the standard hours must be requested in writing and approved by the Contracting Officer (CO) at least 72 hours in advance.

3.0 GOVERNMENT FURNISHED PROPERTY & UTILITIES

3.1 Government-Furnished Utilities

The government will not provide any equipment or materials for this project.

3.2 Contractor-Furnished Property & Equipment

The Contractor shall provide all necessary equipment required to successfully perform the work.

3.3 Protection and Restoration of Property

The Contractor shall take all necessary precautions to prevent damage to government property, including the building exterior, landscaping, sidewalks, underground utilities, vehicles, and pedestrian walkways.

3.4 Equipment Staging and Overnight Security

• Heavy Equipment (Lifts & Rigging): The Government cannot accommodate or provide secure, overnight lockup for large heavy equipment, including articulating boom lifts (e.g., JLG lifts) or heavy rigging on-base. The Contractor shall remain solely responsible for securing all heavy equipment left at the work site during the 5-day performance window.

• Small Equipment & Tools: The Government can assist with securing and locking up smaller, portable safety equipment, hand tools, or supplies overnight in a designated government-controlled secure space. The Contractor shall coordinate daily storage requirements with AFIT Facility Manager.

4.0 SITE ACCESS & SPECIAL EQUIPMENT REQUIREMENTS

4.1 Site Constraints and Damage Prevention

• Access Restraints: The Contractor shall exercise extreme care when navigating narrow pedestrian pathways, sensitive base landscaping, and adjacent surface areas.

• Damage Liability: The Contractor shall be solely liable for repairing, restoring, or replacing any government property, landscaping, turf, utilities, or personal vehicles damaged during the execution of this contract.

5.0 ENVIRONMENT, SAFETY, AND HEALTH (ESH)

5.1 Safety and Fall Protection Standards

• OSHA Compliance: The Contractor shall conduct all operations in strict compliance with the Occupational Safety and Health Administration (OSHA) regulations. The contractor is responsible for utilizing appropriate and safe equipment for landscaping and excavation.

• Pedestrian Protection: The contractor shall place appropriate signage or barricades around the immediate work area to ensure the safety of AFIT staff, students, and visitors from potential hazards.

5.2 Hazardous Materials (HAZMAT) Management

• Environmentally Friendly Products: Any chemical agents used shall be commercial-grade, biodegradable, non-corrosive, and environmentally safe.

• WPAFB HAZMAT Approval: Prior to bringing any chemical onto Wright- Patterson AFB, the Contractor shall obtain formal authorization from the WPAFB HAZMAT Cell (88 SUPS/LGSCH, Bldg 1, Area C, Phone: 937-257-9716).

• HM Cell Form 013: The Contractor shall submit a completed Form "HM Cell 013" alongside the Safety Data Sheet (SDS) for each substance.

• Storage and Disposal: No chemical agents or hazardous materials shall be stored on Wright-Patterson AFB overnight. All chemicals must be transported onto the base daily and removed at the end of each work shift. The Contractor shall maintain and submit a weekly usage log to the HM Cell.

• Spill Reporting: In the event of any chemical spill or environmental release, the Contractor shall immediately notify the Base Civil Engineers at 937-257-6764.

All spill remediation costs shall be borne by the Contractor.

5.3 Accident and Incident Reporting

• Immediate Notification: The Contractor shall report any accident resulting in bodily injury or damage to government property to the CO within 1 hour of the occurrence.

• Scene Preservation: The Contractor shall secure and preserve the scene of any major accident to facilitate a proper investigation.

6.0 SECURITY REQUIREMENTS & PERSONNEL

QUALIFICATIONS

6.1 Base Access and Identification

• Access Request Forms: Contractor personnel requiring access to Wright- Patterson AFB shall complete and submit a "Request for Identification Credential" (WPAFB Form 1440) for each employee.

• Processing Lead Time: The Contractor shall submit all WPAFB Form 1440 access requests a minimum of 10 to 15 business days prior to the scheduled start date (September 25, 2026) to allow sufficient lead time for administrative vetting and credential issuance.

• Credential Pickup: Completed requests must be submitted to the WPAFB Pass and Registration Office (Building 268) to obtain a valid AFMC Form 87 entry badge.

• Escort Requirements: Contractor personnel shall remain strictly within authorized work zones. Government escorts shall be available and provided to the Contractor if access to secure roofs or restricted interior areas is necessary. The Contractor shall coordinate these requirements with the AFIT Facility Manager/COR at least 48 hours in advance of the required access. No physical keys or combinations shall be issued directly to the Contractor.

6.2 Contractor Representatives & Personnel

• Designated Representative: The Contractor shall designate a primary and alternate contract representative in writing to the CO.

• Communication Standards: Designated representatives must be fully proficient in reading, writing, speaking, and understanding English.

• Response Requirements: The Contractor’s representative must be reachable by telephone and shall respond to official government inquiries within 4 hours during regular operating hours.

• Conflicts of Interest: The Contractor shall not employ any active US Government or Department of the Air Force employee if such employment constitutes a conflict of interest under the Joint Ethics Regulation (DOD 5500.7R).

7.0 SPECIFIC BUILDING SPECIFICATIONS & PHOTO LOGS

7.1 Baseline Technical Matrix

The baseline requirements and access conditions for each building are summarized below. The Contractor shall cross-reference the designated physical photo logs attached to the primary project file for exact river rock site location and physical site restrictions.

7.2 Building Details and Photo References

(Note: Photographic and utility reference logs are attached to the official contract documentation).

• Building 20640 Photo Logs:

• Number of Stories & Max Height Profiles: [Photo Attached: Building

20640 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20640 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20640 Current

Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20640 Access

Constraints]

• Building 20641 Photo Logs:

20641 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20641 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20641 Current

Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20641 Access

• Building 20642 Photo Logs:

20642 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20642 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20642 Current

Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20642 Access

• Building 20643 Photo Logs:

20643 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20643 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20643 Current Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20643 Access

• Building 20644 Photo Logs:

20644 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20644 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20644 Current

Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20644 Access

• Building 20646 Photo Logs:

20646 Story & Height Details]

• Exterior Water Source Location & Access: [Utility/Water Log

Attached: Building 20646 Exterior Water Source]

• Baseline Exterior State: [Photo Attached: Building 20646 Current

Exterior]

• Specific Access Obstacles: [Photo Attached: Building 20646 Access

8.0 QUALITY ASSURANCE & BILLING

8.1 Quality Assurance Surveillance

The Government will evaluate the Contractor's performance periodically in accordance with commercial standards.

8.2 Payment Terms

Payment representing 100% of the contract value shall be authorized upon the final, acceptable completion of all requirements outlined in this PWS. No partial progress payments will be authorized.

8.3 Invoicing Submission

The Contractor shall submit all invoices electronically through the DoD Wide Area Workflow (WAWF) portal upon service sign-off.

9.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

The following table establishes the required outcomes, the standard, the Acceptable Quality Level (AQL), and the Government’s surveillance method.

Performance Objective

Standard Acceptable Quality Level

(AQL)

Method of Surveillance

River Rock Border Installation

A uniform 3-foot wide border of #4 river rock is installed over a fully secured commercial-grade weed barrier with no gaps or exposed soil.

95% of the total linear footage meets the standard upon inspection.

Inspection and acceptance of services upon completion of service.

Site Preparation & Cleanup

Lawful removal and disposal of all excavated turf, soil, and debris.

Work site is left clean and orderly.

Zero allowable deviations upon completion of the project.

Inspection and acceptance of services upon completion of service.

Protect Government Property

Zero damage to building exteriors, sidewalks, landscaping, and underground utilities.

Zero allowable deviations.

Contractor repairs/replaces damage at own expense.

Inspection and acceptance of services upon completion of service.

https://wawf.eb.mil/ https://wawf.eb.mil/

PERFORMANCE WORK STATEMENT (PWS)
RIVER ROCK BORDER INSTALLATION
1.0 DESCRIPTION OF SERVICES
1.1 Scope of Work
1.2 Schedule and Performance Period
2.0 PLACE OF PERFORMANCE & HOURS OF OPERATION
2.1 Place of Performance
2.2 Hours of Operation
3.0 GOVERNMENT FURNISHED PROPERTY & UTILITIES
3.1 Government-Furnished Utilities
3.2 Contractor-Furnished Property & Equipment
3.3 Protection and Restoration of Property
3.4 Equipment Staging and Overnight Security
4.0 SITE ACCESS & SPECIAL EQUIPMENT REQUIREMENTS
4.1 Site Constraints and Damage Prevention
5.0 ENVIRONMENT, SAFETY, AND HEALTH (ESH)
5.1 Safety and Fall Protection Standards
5.2 Hazardous Materials (HAZMAT) Management
5.3 Accident and Incident Reporting
6.0 SECURITY REQUIREMENTS & PERSONNEL QUALIFICATIONS
6.1 Base Access and Identification
6.2 Contractor Representatives & Personnel
7.0 SPECIFIC BUILDING SPECIFICATIONS & PHOTO LOGS
7.1 Baseline Technical Matrix
7.2 Building Details and Photo References
8.0 QUALITY ASSURANCE & BILLING
8.1 Quality Assurance Surveillance
8.2 Payment Terms
8.3 Invoicing Submission

9.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

File details come from the government source that posted it. Updated .