This document is a Performance Work Statement (PWS) for the Missile Facility Refueler (MAF-R) Maintenance contract at Barksdale Air Force Base, Louisiana. The PWS outlines the contractor's responsibilities for performing preventive maintenance, inspections, and repairs on 16 MAF-Rs located at Malmstrom AFB, F.E. Warren AFB, and Minot AFB. Key requirements include establishing a bench stock of replacement parts, responding to routine service calls within 72 hours, and maintaining quality control and safety procedures. The PWS also details government-furnished property and services, personnel qualifications, and security requirements.

The related federal contract opportunity is a total small business set-aside solicitation for the Missile Facility Refueler maintenance services. Proposals are due by 15 May 2024, and must include a completed pricing matrix along with a technical approach. The contracting agency is the Department of the Air Force Global Strike Command.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA6800-22-R-0002

PERFORMANCE WORK STATEMENT (PWS)

MISSILE FACILITY REFUELER (MAF-R) MAINTENANCE

BARKSDALE AFB, LOUISIANA

Date: 30 March 2024

FA6800-24-R-0004

TABLE OF CONTENTS SCOPE OF WORK SECTION I

1. DESCRIPTION OF SERVICES

1.1. MAINTENANCE SERVICE

1.2. PREVENTIVE MAINTENANCE AND INSPECTION PROGRAM (PMI)

1.3. MAINTENANCE LOGS/INSPECTION CHECKLIST

1.4. REPAIRS

1.5. COORDINATION

1.6. SERVICE CALLS

1.7. CALL BACKS

1.8. COMMUNICATION AND RESPONSE TIME

1.9. PARTS AND MATERIALS

1.10. ORIGINAL EQUIPMENT MANFACTURER (OEM) REPLACEMENT PARTS

1.11. INITIAL REFUELER ASSESSMENT REPORT

1.12. AUTHORIZED PERSONNEL

SECTION II

2. SERVICES SUMMARY

2.1. OVERVIEW

2.2. PERFORMANCE EVALUATION

FA6800-24-R-0002

SECTION III

3. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. UTILITIES

3.2. TECHNICAL DATA

3.3 ACCOUNTABILITY

SECTION IV

4. GENERAL INFORMATION

4.1. PERSONNEL

4.2. EMPLOYEES

4.3. IDENTIFICATION

4.4. ATTIRE

4.5. QUALIFICATIONS

4.6. QUALITY CONTROL PLAN

4.7. QUALITY ASSURANCE

4.8. HOURS OF OPERATION/HOLIDAYS

4.9. SAFETY AND HEALTH STANDARDS

4.10. SAFETY DATA SHEET

4.11. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS

4.12. CONTRACTOR FURNISHED ITEMS AND SERVICES

4.13 VEHICLES

SECTION V

5. SECURITY REQUIREMENTS

5.1. SECURITY

5.2. PASS AND IDENTIFICATION ITEMS

5.3. RETRIEVING IDENTIFICATION MEDIA

5.4. TRAFFIC REGULATIONS

5.5. RANDOM PERSONNEL AND VEHICLE SEARCHES

5.6. WEAPONS, FIREARMS, AND AMMUNITION

5.7. REPORTING REQUIREMENTS

5.8. PHYSICAL SECURITY

5.9. KEY CONTROL

5.10 WORK AREA

APPENDICES

A. DEFINITIONS

B. ACRONYMS

C. WORK LOCATIONS

D. WORKLOAD ESTIMATES

E. MAF-R INSPECTION CHECKLIST

F. CONTRACTOR PROCURED BENCHSTOCK

SCOPE OF WORK

The Contractor shall provide all personnel, labor, equipment, supplies, tools, materials and other items necessary to perform regular periodic inspection and maintenance, and repair for 16 Missile Field Refuelers (MAF-Rs) at and within the vicinity of Malmstrom Air Force Base (AFB), F.E. Warren AFB, and Minot AFB as listed in Appendix C herein. Work shall comply with commercial standards for maintenance and repair of these units as well as all commercial, federal, state, and local requirements that may apply.

SECTION I DESCRIPTION OF SERVICES

1.1. MAINTENANCE SERVICE: Contractor will perform preventive maintenance inspection (PMI) and repairs in accordance with equipment manufacturer’s specifications/recommendations, industry standards, and Air Force Technical Orders. Contractor will perform periodic inspections, and be responsible for repair and replacement of all worn or failed components and parts. Replacement parts and interface shall be fully compatible with existing systems.

1.2. PREVENTIVE MAINTENANCE AND INSPECTION PROGRAM (PMI): The contractor shall establish and perform PMI IAW T.O. 37A-1-101 and local manufacturers guidance to ensure reliable and continuous safe operation. Contractor shall ensure fuel systems meet manufacturer maintenance performance specifications. Contractor shall provide trained mechanics and inspectors for all fuel systems maintenance. A certified inspection report and checklist shall be provided to the Contracting Officer’s Representative (COR) within 10 days of inspection.

1.3. MAINTENANCE LOGS/INSPECTION CHECKLIST: Fuel systems Maintenance Logs - AF Form 4427, Operator’s Inspection Guide and Trouble Report (Fuels Support Equipment) will be updated and maintained by the contractor IAW Air Force Manual 33-363, Management of Records, and disposed of IAW Air Force Records Information Management Systems, Records Disposition Schedule. The maintenance log shall include a complete history of maintenance and repairs, indicating dates and name of technician who performed the work.

1.4. REPAIRS: During any scheduled FPMI, the contractor shall immediately service any system that is not operating properly. If the inoperable systems cannot be repaired during the inspection, the contractor shall notify the COR and Fuels Service Center (FSC) within one (1) hour of determining the irreparable status of the refueler. Additionally, contractor shall provide the COR and FSC with the refueler expected time in commission (ETIC) date.

1.5. COORDINATION: The contractor shall coordinate all inspections with the FSC, and Missile Alert Facility personnel so inspections are conducted during the hours of operation.

1.6. SERVICE CALLS: The contractor shall be available to respond to all service calls that occur during routine duty hours that hinder normal operational efficiency or serviceability of the MAF-R systems. Contractors will only respond after hours if necessary to maintain minimum essential levels supporting MAF security operations.

1.6.1. ROUTINE SERVICE CALLS: Routine service require unscheduled repairs, but the unit can still be utilized until the repairs are fixed. Some examples include minor fuel seeps/weeps/drips and hoses that indicate a replacement is warranted. A routine service call requires the Contractor to be on location within 72 hours. In the event the Contractor is unable to correct any deficiencies while on location, the COR shall be notified with current status report which will include required repairs, parts cost estimate and ETIC. Parts required over $500.00 will be routed through the COR to the Contracting Officer for approval.

1.7. CALLBACKS: Defective repairs will be re-accomplished within service call time frames listed above at no additional cost to the government.

1.8. COMMUNICATION AND RESPONSE TIME: The contractor will provide the COR(s) and FSC’s with at least one primary and one alternate emergency contact phone number to initiate service response (business phone/cell phone). Contractors will ensure voicemail systems are utilized when unavailable to receive service calls. The contractor must respond to service call requests within the time frames listed in 1.7.1, 1.7.2 and 1.7.3.

1.9. PARTS AND MATERIALS: The Contractor shall establish a bench stock of parts within 45 days of contract start. The bench stock shall consist of (1) each replaceable item for rapid repair of MAF- R identified in Appendix G. The Contractor shall have a bench stock located in each Wing’s area of responsibility to expedite repairs. Additional items may be placed in bench stock with the approval of the Contracting Officer. The initial bench stock invoice shall be sent to the COR(s) within 15 days of the start of contract performance. The Contractor shall be responsible for costs associated with reoccurring and preventative maintenance parts. All items will be reimbursed by the Government utilizing the invoice process stipulated in approved contract. The Contractor shall respond to initial service calls with sufficient parts and tools to repair equipment.

1.10. OEM REPLACEMENT PARTS: The contractor shall use OEM, or equal parts and materials when repairs are needed. All parts shall be Underwriters Laboratories approved/listed. Only new standard parts will be used in completed repairs. All parts obtained by the contractor will be invoiced at contractor’s cost. Additional cost/mark-up on materials of work performed by sub-contractor will not be accepted. If applicable, contractors will abide by any existing active mechanical warranties.

1.11. INITIAL REFUELER ASSESSMENT REPORT: The contractor shall prepare and submit a written report, including the Inspection Checklist, to the COR within 10 days of the first FPMI performed. The report will include identification of each refueler, location, maintenance and repair performed (if applicable), additional repairs needed, date of inspection, inspector, and overall condition of the equipment. The Contractor shall submit one report, sectioned with tabs according to fuel system location, to the designated COR.

1.12. AUTHORIZED PERSONNEL: The Contracting Officer (CO) will provide the contractor a list of COR and FSC contacts who are authorized to request/accept services for the government. The contractor will only accept work from designated CORs.

SECTION II SERVICES SUMMARY

2.1 This Services Summary (SS) identifies critical success factors for the contract. It identifies both the performance objectives for those factors and the performance threshold required for each performance objective. The Government reserves the right to survey all services called for in the contract to determine whether or not the performance objectives and goals were met. This Services Summary (SS) lists the performance objectives performance objectives for services the Government shall survey.

2.1.1 The absence of any contract requirement from the SS shall not detract from its enforceability, nor limit the rights or remedies of the Government under any clause of the contract.

2.2. PERFORMANCE EVALUATION: Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Preferred method of correcting unacceptable performance is to recomplete necessary performance to evaluated standards.

Table 2.2.1. Performance Objectives

Performance Objective
Para
Performance Threshold
Perform Preventative Maintenance. Maintenance performed according to submitted timeline.
1.1
95% of preventative maintenance completed

Perform Inspections. Inspections performed and an accurate report is delivered within 10 days of inspections.

1.2
95% of all reports and supporting

documents must be received within

Perform Routine Service Call Repairs. Respond to and repair system within 72 hours.
1.6.1
95% of routine service calls are responded to within 72 hour

Special Maintenance Projects Repairs completed within time frame negotiated between Government and Contractor.

APDX-A
95% of special maintenance projects completed within time frame

negotiated between Government and Contractor.

SECTION III

GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. UTILITIES. The government will furnish, where available, water, natural gas, sewage service, and electricity at no cost to the contractor for the sole purpose of accomplishing the requirements of this contract. Any temporary connection of electrical lines that may be required shall be installed, maintained, and removed by the contractor at its own expense.

3.2. TECHNICAL DATA. The Contractor shall contact AFGSC/A4RE if fuel system (and associated equipment) Plans and Specifications are required.

3.3. ACCOUNTABILITY. All parts purchased by the Government will remain the property of the Government. The Contractor shall maintain a listing of all Government furnished property valued at or above $10.00 and shall ensure 100% accountability of the items. The CORs will conduct annual of accountable GFP.

SECTION IV GENERAL INFORMATION

4.1. PERSONNEL: The contractor shall be responsible for obtaining all necessary identification cards, passes, badges, and decals to perform the requirements of this PWS. The Contractor shall contact the appropriate base Pass & ID offices for access to secured locations.

4.2. EMPLOYEES: The contractor shall not employ any person who has been identified by the contracting officer as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. All employees and potential employees are subject to a local background investigation. Investigation results will be provided to the CO and COR for all employees prior to start of contract. The contractor shall submit an organizational structure and a list of personnel designated to perform work under this contract to the contracting officer within 30 calendar days following notification of contract award. The contractor shall notify the administrative contracting office, in writing, of any additions, deletions, or changes in personnel within one duty day of any change.

4.2.1. The contractor shall provide the Government a contact number that can be accessed 24 hours a day, 7 days a week. The contractors shall be able to read, write, speak, and understand the English language.

4.3. IDENTIFICATION: The contractor shall obtain a Base Identification Card for all contractors. While in restricted access areas (i.e. Flight-line Area, Missile Alert Facilities) an appropriate government official with access authorization must escort contract employees. The contractor shall turn in all forms of Government issued identification items of employees who are terminated or willfully leave the contracted company within 48 hours. Long-term contractor passes are issued at the Security Forces Squadron’s Pass and Registration office. Identification shall be obtained and remain in the contractor’s possession at all times while on the installation.

4.4. ATTIRE: The Contractor shall provide uniforms that a represent a professional appearance that are clean, free of rips/tears, displays the company logo and provide a professional appearance. The Contractor shall also provide any Personal Protective Equipment required.

4.5. QUALIFICATIONS: Contractor shall have a minimum of three years of experience in performing fuels maintenance on various types of fuel systems to include gas station dispensing systems, bulk fuel facilities, hydrant fuel systems, or mobile refueling vehicle pumping systems.

4.6. QUALITY CONTROL PLAN: The contractor shall develop and maintain a quality control program to ensure inspection, maintenance, and repair services are performed in accordance with applicable standards, manufacturer instructions. The contractor shall develop and implement procedures to identify and prevent defective services from occurring and reoccurring. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Section II, Services Summary. The Quality Control Plan (QCP) shall be provided to the CO as part of their initial proposal. Although a QCP may have been deemed technically acceptable during the evaluation for contract award, minor modifications may be required after contract award. The contractor shall make these modifications, if necessary, within 10 calendar days following notification from the CO.

4.7. QUALITY ASSURANCE: The Government will evaluate the contractor’s performance in accordance with the QASP. The contractor shall submit a schedule to the COR of all inspections, prior to start of work. The COR shall evaluate the contractor’s performance through periodic inspections of service call repairs, periodic inspections of routine FPMIs, and inspection of SMPs.

4.8. HOURS OF OPERATION/HOLIDAYS: Maintenance shall be performed during the duty hours identified below:

4.8.1. SCHEDULED MAINTENANCE/ROUTINE SERVICE CALLS: Monday through Friday between 7:30 a.m. and 4:30 p.m., excluding recognized federal holidays as defined by the Service Contract Act Wage Determination.

4.9. SAFETY AND HEALTH STANDARDS: Contractor personnel shall comply with all applicable laws and safety regulations. Compliance with Occupational Safety and Health Administration (OSHA) and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the Government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such responsibilities.

4.10. SAFETY DATA SHEET (SDS): The contractor will be provide a copy of an SDS for each product(s) used.

4.11. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS: Oil cans, oil residue and any oil soaked material (e.g., rags and/or paper towels, granulated materials and sand) shall be disposed IAW base directives. The contractor shall transport and dispose of all waste in accordance with Federal, State and local laws and regulations. The contractor shall adhere to written procedures for hazardous material spill clean-up and prevention according to Environmental Protection Agency regulations.

4.12. CONTRACTOR FURNISHED ITEMS AND SERVICES: Except for those items referred to as government furnished in Section III, the contractor shall furnish everything needed to perform the services identified in this contract.

4.13. VEHICLES: The Contractor shall provide vehicle(s) for transport to locations identified in Appendix C. Vehicle(s) shall be maintained in a clean and serviceable condition. The Contractor is required to travel in all types of weather conditions and is recommended that 4-wheel drive vehicle(s) is/are provided. Government parking space shall not be used for parking privately owned vehicles, trailers, snowmobiles, all-terrain vehicles or other conveyances. All vehicles shall be in operable condition and meet all local, state, and federal safety requirements. Each vehicle shall have the contractor name neatly exhibited on each side of the cab.

SECTION V SECURITY REQUIREMENTS

5.1. SECURITY: The Contractor shall safeguard all materials and parts removed, as well as replacement parts. The Contractor shall secure fuel areas and fueling systems at the end of each work period. The contractor shall immediately notify the COR, FSC, and the base SFS when damage to government property, such as accidental abuse or misuse is discovered. The contractor shall annotate the damage on the vehicle’s inspection report.

5.2. PASS AND IDENTIFICATION ITEMS: The contractor shall ensure that pass and identification items required for contract performance are obtained for contactor employees and non- Government owned Vehicles.

5.3. RETRIEVING IDENTIFICATION MEDIA: The Logistics Readiness Squadron’s MAF-R COR shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc., and turn them in to the issuing office.

5.4. TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, are prohibited while driving on military bases/property.

5.5. RANDOM PERSONNEL AND VEHICLE SEARCHES: Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.

5.6. WEAPONS, FIREARMS, AND AMMUNITION: Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within government-owned vehicles or privately owned vehicles while on military bases.

5.7. REPORTING REQUIREMENTS: Contractor personnel shall immediately report any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information to an appropriate Government authority

5.8. PHYSICAL SECURITY: Contractor employees are responsible for safeguarding all Government property and controlled forms provided for the contractor’s use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

5.9. KEY CONTROL: The contractor shall establish a key control process that ensures Government issued keys are not misplaced or used by unauthorized personnel. The Contractor shall not duplicate any keys issued by the Government.

5.9.1. The contractor shall immediately report any occurrences of lost or duplicated keys to the COR.

5.9.2. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction from the CO, to re-key or replace the affected lock or locks. The Government may, however, at its option, replace the affected lock or locks or perform rekeying and replace any affected lock or locks or perform rekeying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.

5.9.3. Only authorized contractor personnel will receive cipher lock combinations and approval to use Government issued keys.

5.10. WORK AREA. The contractor shall at all times, keep work areas free from any accumulation of debris, waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job, or when away from the work site, the contractor shall leave the work area and its premises in a clean, neat, safe and workmanlike condition.

APPENDIX A DEFINITIONS

Authorized Personnel: Individuals authorized to place "calls" to the contractor for response to a service call or any other maintenance action or service covered in the Performance Work Statement.

Damage to Government Property: Damage or abnormal deterioration caused by physical abuse or negligence.

Defective Service: A service/part that does not fix the initial maintenance work order.

Escort: One or more persons accompanying the contractor in high security areas on a military base.

Inspection: Detailed visual examination of MAF-R and its components.

Proposal: To submit in writing an offer listing discrepancies identified during inspection of barriers.

Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the contractor.

Quality Control (QC): A contractor program of action to effectively and efficiently manage the quality of performance objectives relating to standards of performance and inspections necessary to assure that the service satisfy the requirements from concept through validation.

Service Call: Service calls are defined as additional visits and service requested at any time other than scheduled/reoccurring maintenance.

Services Summary (SS): Identifies the key service outputs of the contract that will be evaluated by the government to assure contract performance.

Special Maintenance Projects (SMP): Work requirements within the general scope of this contract work but not elsewhere defined or priced

APPENDIX B

ACRONYMS

AFB
Air Force Base
AFPET
Air Force Petroleum Office
EPA
Environmental Protection Agency
CDRL
Contract Data Requirement List
CLIN
Contract Line Item Number
CO
Contracting Officer
COR
Contracting Officer’s Representative
FAR
Federal Acquisition Regulation
FPMI
Full Preventative Maintenance Inspection
FSC
Fuels Support Center
IAW
In Accordance With
SDS
Safety Data Sheet
OSHA
Occupational Safety and Health Administration
POC
Point of Contact
QASP
Quality Assurance Surveillance Plan
QC
Quality Control
QCP
Quality Control Plan
SMP
Special Maintenance Projects
SS
Service Summary

Work Locations

FE Warren Air Force BaseMalmstrom Air Force Base
90th LRS/Fuels341st LRS/Fuels
7310 Post Rd bldg. 12746710 Trainer Dr. Bldg 1469
FE Warren AFB, WY 82005Malmstrom AFB, MT 59402
Delta OneBravo One
5083 State Rd 217046 Sourdough Rd
Kimball, NE 69145Geyser, MT 59447
Golf OneCharlie One
3025 State Rd 10124 Mountain View Rd
Sidney, NE 69162Stanford, MT 59479
Lima OneEcho One
63159 State Rd 714250 Echo Dr
Stoneham, CO 80754Hilger, MT 59451

Golf One

Minot Air Force Base9958 MT HWY 200
5th LRS/LGRFAgusta, MT 59410

781 Bomber Blvd Minot AFB, ND 58705 Hotel One

579 2ND LN NE

Charlie One Fairfield, MT 59436 1 County Road 6 Benedict, ND 58716 Lima One

1940 US HWY 191 N

Gulf One Judith Gap, MT 59453 1 County Road 3

Plaza, ND 58771November One 102906 US HWY 87
Mike OneLewistown, MT 59457

3 County Road 2 Tolley, ND 58787 Attachment 1

APPENDIX C

APPENDIX D WORKLOAD ESTIMATES

AFGSC Missile Facility Refueler (MAF-R) Maintenance

Installation
Level of Service
Available Hours
Number of visits
Minot Air Force Base, North Dakota
Full Time
M-F 7:30 am – 4:30 pm
TBD
Malmstrom Air Force Base, Montana
Full Time
M-F 7:30 am – 4:30 pm
TBD
FE Warren Air Force Base, Wyoming
Full Time
M-F 7:30 am – 4:30 pm
TBD
Minot Air Force Base, North Dakota
Non-Routine
Overtime
10 per month

(Estimate)

Malmstrom Air Force Base, Montana
Non-Routine
Overtime
23 per month

(Estimate)

FE Warren Air Force Base, Wyoming
Non-Routine
Overtime
10 per month (Estimate)

Projected Recurring Maintenance (RM) Hrs

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Monthly
1
1
1
1
1
1
1
1
1
1
1
1

Quarterly

Semi-Annual

Annual

Operational Hours
1
3
1
1
8
1
1
3
1
1
5
1
Total MAF-R Sites per Base
Total Yearly RM HRs per Base
Total Yearly NRM HRs per Base
Malmstrom AFB, MT
8
216
1728
Minot AFB, ND
4
108
864
FE Warren AFB, WY
4
108
864
Totals
16
432
3456

Projected Non-Recurring Maintenance (NRM) Hrs (1 site)

Type of MX
Man Hrs (1 site)
Man Hrs per Month (1 site)
Yearly MX Hrs (1 site)
Pump Repairs
3
6
72
Filter Separator
2
4
48
Meters
1
2
24
Hose Reel
0.5
1
12
Hose
1
2
24
Vent
0.5
1
12
Pressure Relief
1
2
24

Total MX Hrs

Projected Drive Times (Hours)

Location
Malmstrom AFB, MT
Minot AFB, ND
FE Warren, WY
B
C
E
G
H
L
N
C
G
M
D
G
L
Mileage
51
63
137
51
43
105
123
53
64
62
76
102
81
Good Weather
62
74
168
57
56
122
136
60
80
70
90
90
75
Total Time (Roundtrip)
2
2
6
2
2
4
5
2
3
2
3
3
3
Bad Weather
124
148
336
114
112
244
272
105
130
120
150
150
105
Total Time (Roundtrip)
4
5
11
4
4
8
9
4
4
4
5
5
4

APPENDIX E

MAF-R INSPECTION CHECKLIST

AF Form 4427, Operator’s Inspection Guide and Trouble Report

AF4427 Operator's Inspection Guide an

APPENDIX F

Contractor Procured Bench stock

F.E. WARREN AFB, WY

Description
Manufacturer
Part No.
Qty Required
Aircraft Nozzle
OPW
295SAJ
2 each
Deadman Switches “Pistol Grip”
Western Technology
1003-CR-25
2 each
Static Grounding Reels
Hannay Reels
GR 75
2 each
Filter Separator Elements
Parker Velcon
I-622MMTB
2 each
Pump Seals
Blackmer
701914, 702242,

701947 2 each

MINOT AFB, ND

Description
Manufacturer
Part No.
Qty Required
Aircraft Nozzle
OPW
295SAJ
2 each
Deadman Switches “Pistol Grip”
Western Technology
1003-CR-25
2 each
Static Grounding Reels
Hannay Reels
GR 75
2 each
Filter Separator Elements
Parker Velcon
I-622MMTB
2 each
Pump Seals
Blackmer GX2B
701914, 702242,

2 each

MALMSTROM AFB, MT

Description
Manufacturer
Part No.
Qty Required
Aircraft Nozzle
OPW
295SAJ
4 each
Deadman Switches “Pistol Grip”
Western Technology
1003-CR-25
4 each
Static Grounding Reels
Hannay Reels
GR 75
4 each
Filter Separator Elements
Parker Velcon
I-622MMTB
4 each
Pump Seals
Blackmer
701914, 702242,

4 each image1.jpeg