Atch 1. Draft SOW IDS ACS & VMS B310 V3.pdf

PDF 1 MB Posted

Attached to
Honeywell IDS, ACS & WMS Bldg 310 Federal contract opportunity
Solicitation number
FA301623Q3153
Issued by
Department of the Air Force Air Education and Training Command

About this file

This statement of work outlines requirements for the engineering, furnishing, installation, testing and certification of intrusion detection systems, access control systems, and video management servers for Building 310 at Joint Base San Antonio-Lackland in Texas. The scope of work involves procuring and installing Honeywell Vindicator intrusion detection systems, access control systems, and video management servers on the first and second floors of the building. The contractor must provide certified alarm components and technicians. Key requirements include installing intrusion detection devices, access control card readers, video surveillance cameras, wiring, and completing testing and training. The contractor will work closely with 802nd Civil Engineer Squadron and 802nd Security Forces Squadron on equipment approval, installation, inspection, and certification. The period of performance is approximately six months from contract award.

View the file

Other files for this federal contract opportunity

Other files attached to Honeywell IDS, ACS & WMS Bldg 310, newest first.
File Type Posted
Sources Sought Notice- Honeywell IDS Bldg 310.docx DOCX document
Atch 2. Draft J&A - Brand Name-A_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW IDS ACS & VMS Install B310 23 June 2023

June 23, 2023

STATEMENT OF WORK (SOW)

for

INTRUSION DETECTION SYSTEM (IDS),

ACCESS CONTROL SYSTEM (ACS), and

VIDEO MANAGEMENT SERVER for Bldg. 310

Chapman Annex

JBSA-Lackland, TX

Prepared By

802 CES/CENMPLA

1555 Gott St., Bldg. 5595

JBSA-Lackland, TX 78236

SOW -IDS ACS & VMS Install B310 23 June 2023

Page | 2

1.0 SCOPE.

This SOW defines the requirements for the Contractor to Engineer, Furnish, Install & Test

(EFI&T), 2-Honeywell Vindicator® IDS, 2-Access Control System (ACS), and 2-Video

Management Server(VMS), for Controlled Areas in Bldg 310 at Chapman Annex, JBSA

Lackland to be installed in the 1st floor and 2nd floor. The IDS project will consist of three phases, Phase I will be completed by the contractor, Phase II and III will be completed by the government. The Contractor must provide certified alarm components, associated equipment, certified Honeywell Vindicator and Building Industry Consulting Service

International (BICSI) certified technicians. In addition, to providing all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, and material will be provided by the government.

GENERAL INFORMATION. This facility was renovated in 2021 to support 50 NWS and 23 IS critical missions, however during construction the IDS, ACS and VMS was descoped incompliance with Real Property requirements & standards. This Project intents to secured and protect information, personnel, and equipment within the future Controlled Areas to enable End Users to occupy the facility and conduct their respective critical missions.

REQUIREMENTS.

2.1 GENERAL REQUIREMENTS.

2.1.1 Safety Requirements.

The contractor shall remain in compliance with all Federal, State, Country, and JBSA-

Lackland security and safety laws, regulations, policies, and requirements.

2.1.1.1 Accident/Incident Reporting and Investigation.

The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the Base Safety Office unless otherwise stated in the SOW The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base

POC. If the Government elects to conduct an investigation of the incident, the

Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.

2.1.1.2 Work Area (s).

The Contractor shall remove all debris and surplus materials from the work place.

Safety barriers shall be in place to protect unfinished work site at the end of the day.

All open holes or trenches shall be completely enclosed by flexible orange construction safety fencing, or other safety barriers, at the end of the work day.

Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard.

2.1.1.3 Traffic control.

In the event base vehicular traffic is to be disrupted by trenching or horizontal directional boring, the Contractor shall make appropriate notifications NLT 10 calendar days in advance to inform base personnel of the planned disruptions.

Page | 3

2.1.2 Security Requirements.

The Contractor shall process and provide a Site Visit Request Letter to 802 CES Project

Manager (PM) within five (5) calendar days after contract award. This spreadsheet shall identify the names (as shown on the driver’s license), driver’s license numbers and state of issue, and birth date of the personnel who will be performing work under this SOW, company name, address, phone number and contract number, start date, and end date.

This information is required to grant access to the base. If required by the base, the

Contractor shall provide identification badges for their employees. All Contractor personnel shall wear these badges while on duty on the Government site. The badges shall identify the individual, company name, and be clearly and distinctly marked as

Contractor and be in accordance with base regulations.

2.1.3 Environmental Management.

The Contractor shall comply with the most stringent environmental federal, state, and local laws and regulations; and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with environmental regulations.

The contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on JBSA-Lackland.

The Prime Contractor shall ensure that their sub-contractors (if any) comply with these specifications.

2.1.4 Quality Assurance.

The Contractor shall provide Quality Assurance Support for the entire life of the project. The Contractor’s quality assurance evaluator shall assist the Government representative in performing random spot checks and system acceptance tests.

Contractor shall be responsible for identifying system and outside plant deficiencies and/or discrepancies throughout the life of the project. A weekly report (soft copy) shall be submitted indicating progress/status and listing any deficiencies/discrepancies found and actions to correct them.

2.1.5 Contractor Personnel.

2.1.5.1 Project Management.

The Contractor shall provide a Project Manager (PM) and alternate(s) responsible for contract performance and continuity. The Contractor shall identify the Project

Manager’s or alternate's range of authority to act for the Contractor relating to daily contract operation.

2.1.5.2 Site Point of Contact (POC).

The Contractor shall designate the Contractor's on-site team leader and alternate(s) as the Site POC for individual projects in their Site Visit Request Letter. The Site POC or alternate(s) shall be on site during duty hours until project completion and shall oversee all facets of the installation tasks. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.

2.1.5.3 Personnel Requirements.

The Project Manager, Site POC, and respective alternate(s) shall be able to read, write, speak, and understand English.

Page | 4

2.1.6 Warranty.

The Contractor shall provide a one year warranty or manufacturer’s standard commercial warranty, whichever is longer. This warranty shall include a one year workmanship warranty. The warranty period shall start from the date of system and/or project acceptance. The Contractor shall provide written procedures and required information for warranty services at or prior to site acceptance.

2.1.7 Manuals and Practices.

The Contractor shall provide the latest version of operation, installation, and maintenance manuals and practices/users guide for each system installed as provided by the original manufacturer with all new equipment.

2.2 SPECIFIC REQUIREMENTS.

This section describes procurement and installation of IDS, ACS, and VMS. The

Contractor shall provide all management, tools, supplies, equipment, and labor necessary for the Procurement & Installation of 2 Intrusion Detection (IDS), 2 Access

Control Systems (ACS), and 2 Video Management Servers (VMS) for the Controlled

Areas of Bldg. 310 at JBSA Lackland Chapman Annex. The Controlled Areas are located on the first and second floor of Bldg. 310; which are manned and managed by

50th Network Warfare Squadron (50 NWS) and 23d Intelligence Squadron (23 IS) respectively. The Contractor shall perform initial and post work Scope survey to ensure compliance with all Security requirements, codes, and regulations. The contractor shall procure and install all required electrical infrastructure to supply power to IDS, ACS &

VMS. Contractor shall procure and install conduits, devices, and wiring/cabling for the safe operation of the IDS, ACS & VMS.

The Contractor shall be responsible for all required electrical and communication infrastructure within the building for the safe installation, and operation of the IDS, ACS, VMS and all of their respective devices, hardware and software. Contractor shall comply with the most recent version at time of solicitation of NFPA 70 (NEC); UFGS Div 26 05 00.00

40; Div 28 08 10; Div 28 10 05; AFMAN31-101V1-O, DAFI31-101, and all applicable Regulations Standards IAW 802 Security Forces Squadron

Electronic Security System Program (802 SFS/ESSP). When conflict between any of the standards/regulations exists, the most stringent shall prevail.

Intrusion Detection System (IDS): The Contractor shall provide and install IDSs and hall be an 802 SFS/ESSP approved Vindicator® IDS. Contractor shall procure and install required

Vindicator® IDS Keypads, Control & Communication Panels, alarm points/devices/sensors, all hardware, accessories, appurtenances, and software necessary for the safe and secured operation of the areas the IDSs are required to protect. The Contractor shall provide & install

4ea. duress alarm activation switches in 2 rooms on 1st and 2nd floor’s controlled areas (at the

Commanders & Deputy Commanders Offices). The Contractor shall provide and install the

Vindicator IDS IAW t hi s SOW, and forementioned codes, standards, and regulations.

Contractor shall be responsible for providing all necessary material/devices/wiring required for the safe electrical power supply to the Vindicator® Panels and its associated devices. The

Contractor shall be responsible to ensure the Vindicator® Communication hardware and software is compatible and in compliance with the existing Communication System at 802

SFS Base Defense Operation Center at JBSA Lackland. Contractor is responsible to coordinate communication connection requirements with 502nd Communication Squadron

(502 CS) prior procurement of IDS communication panels, cables, and associated hardware.

Page | 5

The Contractor shall be responsible for the IDS Certification by contacting 802 SFS/ESSP

Manager; Vindicator® IDS Certification by 802 SFS/ESSP is a critical requirement/deliverable for Government acceptance.

1. 23 IS & 50 NWS Chapman Annex B310, JBSA-Lackland, Texas, requires installation of 2 Intrusion Detection Systems (IDS). The ability to properly store critical assets IAW DAFI 31-101 requires these new systems to be operational. The 23

Intelligence Squadron (23 IS) & 50th Network Warfare Squadron (50 NWS) in Bldg.

310 must have operational IDS and be protected by two levels of IDS. All equipment will be installed within the confines of the Controlled Areas on Bldg. 310 at Chapman

Annex. The IDS will be installed in the First and Second Floor of Bldg. 310 and will be protected by a Balanced Magnetic Switch (BMS),Passive Infrared Sensor (PIR), and

4ea duress alarm activation switches. The alarm system shall be an 822 SFS/ESSP approved Vindicator® system component, and networked with the existing Vindicator® network/alarm system operating within the 802 SFS Base Defense Operations Center

(BDOC), located on JBSA-Lackland.

INSTALLATION: The contractor shall coordinate a site survey with the customer prior to ordering equipment. The contractor shall provide and install all needed installation hardware, accessories, and appurtenances. All programming will be completed at Bldg.

310. Only components from the current Air Force Non-Nuclear Configuration Management

Database (CMD) Equipment Approval memo will be utilized; 802 SFS/ESSP will provide memo upon request.

a. SCOPE: The contractor must be Honeywell Vindicator® certified and perform the following services for the installation in a phased process, with Vindicator certified alarm components and associated equipment. Contractor shall submit a material list prior installation for review and approval by 802 SFS/ESSP.

1.1.1. Install Vindicator® 1500 or Vindicator® V5.

1.1.2. Install Vindicator® Keypad for entry into Controlled Areas Bldg. 310

1.1.3. Install Balanced Magnetic Switch(s) (BMS) and Passive Infrared sensor(s)

(PIR) at each access point, and 4ea Duress Alarm Activation Switches.

1.1.4. Install battery backup lasting no less than 4 hours.

1.1.5. Label wiring before and after penetration of perimeter walls of alarmed areas.

1.1.6. Install all electrical support requirement for equipment that is not already available. Install dedicate electrical and communication lines from point of debark.

1.1.7. Remove all previous installed components that are identified as unnecessary.

1.1.8. Coordinate all programming of the Vindicator® system and map of the area(s) with 802 SFS/ESS. All alarm programming at the headend will be conducted by

802 SFS/ESS in coordination with contactor at Building #1030

1.1.9. Provide an area PDF drawing that shows all designated alarm points that will be programmed into the base alarm system; this will be reviewed by 802

Page | 6

SFS/Resource Protection and the 802 SFS/ESS during material submittals.

1.1.10. Provide a complete list of alarm devices to 802 SFS/Resource Protection and

802 SFS/ESS which will be reviewed during the material submittals. To include make, model, serial number and part number.

1.1.11. Coordinate with 802 SFS/ESS for Vindicator alarm point numbers for programming after installation is complete; this will also be provided to 802

SFS/ESS as a hard copy and electronic copy (PDF).

1.1.12. After installation but before alarm programming, 802 SFS/ESS will conduct an inspection of the installed parts.

1.1.13. Ensure each alarm device will have its own alarm point.

1.1.14. Provide a plan for a Vindicator® certified technician to conduct warranty response within 24 hours from a call requesting warranty support.

1.1.15. Ensure all IDS data transmission lines shall be protected with a National

Institute of Standards and Testing (NIST) certified Advanced Encryption

Standard (AES) encryption.

1.1.16. Coordinate with the 802 SFS/ESS on the installation of mounted alarm boxes and fiber cables/Copper pairs prior to installation, or when within 80 percent of completion to ensure correct placement of equipment.

b. Access Control System (ACS): The Contractor shall provide and install

Access Control Systems for each floor secured area, and the ACSs shall be locally managed and controlled by the respective End User within the secured areas. The ACSs shall be compatible with Vindicator® IDS; for the purpose of this Project, the ACS shall not be connected to the Vindicator® IDS or existing access control related applications within JBSA, nor be connected to the Internet

(secured or insecure). The ACS procurement and installation shall include control software with computer terminal interface to ACS control panel, access card/badge printers; control and keypad panel, a single point of entry card/badge reader (2 each per floor), magnetic door locks for all entry and exterior access doors. The ACS shall include all software applications to locally manage/maintain the ACS. The ACS/VMS computer terminal and control panels shall be installed inside the forementioned Controlled Areas. Magnetic door locks, card/badge readers shall be wired type. All conduit and enclosures shall be concealed whenever possible within walls and ceiling assemblies. Contractor shall utilize all existing concealed pre-installed conduit whenever possible; when new tubing and enclosure is necessary the Contractor shall conceal conduit in the sheetrock walls and above suspended ceiling, enclose wires in conduit and applicable NEC approved enclosures. Device enclosures shall be flush mounted when associated with concealed conduit. Surface mounted conduit shall be electrical metallic tubing (EMT). The Contractor shall install the ACS/VMS computer terminal in the nearest room to the Controlled Areas entrance. The

Contractor shall install control panels at the hallway immediately inside the

Controlled Areas entrance; the control/keypad panel shall be installed safely secured, and as close as physically possible to the IDS’ keypad without impeding access to either panel. Contractor shall install panels with the keypad 5 ft from

Page | 7 the finished floor. Contractor shall install 750 lbs. rated magnetic door locks and card/badge reader at single point of entry to every secured area on each floor. All magnetic door locks shall be fitted with a suitable emergency magnet override.

Contractor shall provide a stock of at least 100ea printer compatible access card/badges. Contractor shall demonstrate to, and train End Users on the card/badge printer operation after the ACS & associated hardware & software installation and set- up.

c. Video Management System (VMS): Contractor shall procure and install 2 ea.

Closed- Circuit Video Surveillance Systems, also known as Video Management

System (VMS), one for each floor secured areas. For the purpose of this Project, the

VMS shall be compatible with Vindicator® IDS, but not connected to it. For management and control of the VMS, the Contractor shall procure and install 2ea computer terminals (1computer terminal per floor) and its operation shall be shared between the VMS and ACS’ management & control software. The computer terminal applications shall be isolated from internet connection, and any existing JBSA access

& video management/control applications and software. The VMS shall include video management servers with monitors and shall be high-definition digital video recorder (HD-DVR) wired connected to computer terminal and wired HD surveillance camera. Contractor shall install the HD cameras, pointed towards the controlled area main entrance of each floor, as to observe/record card/badge reader operation.

2.3 TRAINING: Contractor shall provide up to 6 hours of training to designated 23 IS & 50

NWS Staff and Asset Owners on operation of the alarm system. (i.e. Activate, reset, testing, etc.)

2.4 As-Built Drawings: Contractor shall provide Electronic PDF As-Built Drawing following the completion of all work to 802 SFS/ESS and provide those as part of the final

Performance Verification Test (PVT).

2.5 SAFETY: The contractor shall provide all safety gear to include, hard hats, eye protection, ear/sound protection, and for providing any other safety equipment required for safe working conditions. The contractor is also responsible for proper safety around the work area.

3. SYSTEM CHECK: The Contractor shall complete a system check for Phase 1 of project to include but not limited to ensuring all installed components are functioning to manufacture specifications, certified test requirements IAW 802 SFS/ESSP.

3.1 Certification Test Requirements. ESS/PM will conduct functional and operational certification tests of the IDS to ensure the system meets effectiveness standards/compliance requirements.

3.2 The contractor shall participate in this phase of testing with the ESS/PM.

Testing shall consist of the following: intrusion tests, tamper tests, annunciation test, assessment test, AC power loss test, line supervision test, sensor system self-tests, and access control.

3.3 Phase II and III Testing will be completed by the government.

Page | 8

3.4 Phase I: The contractor shall perform a Contractor Verification Test (CVT) will occur upon IDE installation at each facility or groups of facilities. The contractor and government representative the ESS NCOIC/Manager shall witness this test. Any component found to be inoperative during the test or at any time during the installation period shall be brought to the attention of the

Security Forces POC. Acceptance testing shall consist of the following: intrusion tests, tamper tests, annunciation test, assessment test, AC power loss test, line supervision test, sensor system self-tests, and access control.

3.5 Phase II: Phase II testing is a 72-hour continuous test that ensures all equipment is installed properly and works according to specifications. It will establish initial expectations in regard to false and nuisance alarm. The AFTO

747, Communications and Information Systems Acceptance Certificate, transferring the system will be signed after successful completion of this test phase. AFTO 747 is used to signify the completion of the project and acceptance of the installed system by the user. The completion of this form means the system has been tested and accepted as installed, and all noted exceptions shall be corrected by the responsible party to the satisfaction of the government

POC/ESS NCOIC. The decision to accept the successful completion of the test phase is a commander-level decision and should be completed by the appropriate commander.

3.6 Phase III: Phase III testing is a 30-day continuous operational test to assess how well the system performs in its normal operating mode on a permanent basis. This test is to detect any premature or latent defects in the equipment or components and to allow the operators and maintainers an opportunity to assess the adequacy of logistics support, and assess the false and nuisance alarm rates of the system. After successful completion of this test phase, the using organization will request MAJCOM certification.

NOTE: Phase II and III Testing will be completed by the government

Warranty: Shall include service visits within 365 days from Phase-1 completion and unlimited phone support for 2 years.

Key Personnel:

The following personnel are considered key personnel by the government concerning the 802

SFS/Electronic Security Systems (ESS)

Program Manager, 802 SFS/Resource Protection Program Manager, 802 SFS/Electronic

210-671-7262 Security Systems 210-671-7253.

4. Installation Schedules.

Period of performance for this Project is approximately 6 months from contract award date.

The Contractor shall provide a complete milestone schedule in MS Project Gantt Chart format (compatible with MS Project 2010) that denotes project activities to include time-phased start and completion dates for the project and sub-projects associated with the installation of the components and system.

5. Weekly Status Reports.

Page | 9

The Contractor shall prepare a Weekly Status Report and distribute to Integrated Process

Team (IPT) members. The purpose of the report is to inform IPT members of project progress, problems being encountered, and other topics necessary/beneficial to ensure success and timely completion of the contract requirements.

6. Hours of Operation

The Contractor shall perform the services required under this contract during normal duty hours (0700- 1600) of the site where work is being performed. However, mission requirements may necessitate work outside normal hours (nights and/or weekends), especially if existing service must be interrupted. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated and approved by the

802nd CES Project Manager at least ten (10) calendar days in advance. Part or all of the facility may be occupied during this effort. Contractor shall accomplish the installation with minimum disruption of daily office activities.

7. Approval and Acceptance

Phase 1 project to be inspected and approved by Government (802 SFS/ESSP) and the

End User, 960th Cyberspace Wing Security Manager.

Attchment:

As-Built Drawings for Floor Plan information only

1 2 3

***SAFETY PAYS***

4 5

6 7 8 9

KEYED NOTES:

F

NOTES:

1. THE CONTRACTOR SHALL PROWIDE CONDUIT,

US ARMY CORPS

OF ENGINEERS ®

LOUISWILLE DISTRICT

2.1 3.4

E

PIR

2.1

L1-3 B

2.1

STAIR

ST1

ELEVATOR

ELEV MACHINE

FIRE RISER

ELEC

D

MISSION

ASSURANCE

SERVER

1.1

BREAKROOM

TRAINING

ADMIN

100A

LOBBY

WWS 2

2 WOMEN

9. ALL MECHANICAL DUCTWORK OWER 96 S UARE

10. CONDUITS FOR POWER, LIGHTING, FIRE ALARM,

C

106B PIR

B L1-3

OPS

106A

CORRIDOR

JAN

MEN

CNSSAM 1/13.

B L1-3

STAN/EVAL

WEAPONS

TACTICS

CONFERENCE

STORAGE

PRINT/FILE

1ST SHIRT

COMMANDER

SENSITIWE

SPACE

PERIMETER

A

1 3 4

FIRST FLOOR SECURITY PLAN

SCALE: 3/16" = 1'-0"

0 4' 8' 12'

SHEET

REFERENCE

NUMBER:

TY101

FILE:

DATE:

BIM 360://108962 LacklandRenov/108962 E B310 Central.rvt

7/27/2020 10:08:17 AM

***SUPPORT WALUE ENGINEERING - IT PAYS***

CERTIFIED FINAL

EL1

W W

S

P

U

O

P Y

R

IG

H T

B

U R

N S

A N

D M

C D

O N

N E

L L

E N

G

IN

E E

R

IN

G C

O M

P A

N Y

IN

C

U S F

E D

E R

A L G

O V

E R

N M

E N

T H

A S U

N L

IM

IT

E D

R E P R

O D

U C

T

IV

E R

IG

H

T

R

F

N

W

IS

IO

S C

R

IP

T

IO

Y

.N

.M P

Y

N O

W A

T E

B

F

O R

I

S

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

T E

X

IR

S T

F L

O O

R S

E C

U R

IT

L

M B

P R

S T

F L

O O

R R

E W

IS

IO

/2

/1

R

T

IF

IE

IN

(8

-9

A1

T E

S C

A L

E

A S

I N

D

IC

A T

A W

IN

G

C O

D

O

J E

C T

E N

G

IN

E E

R /A

R C

H

IT

E

S

IG

N E

D B

Y

S

S T

R A

T T

A W

N B

Y

R

T H

O M

P S

H

E C

K E

D B

Y

C

P L

U M

M

.S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

R

P S

O F

E N

G

IN

E E

U

IS

W

IL

L E

K

E N

T U

C K

R N

S

M c D

O N

N E

W

A R

D P

A R

K W

N S

A S

C

IT

Y

M

1 2 3

***SAFETY PAYS***

4 5

6 7 8 9

KEYED NOTES

NOTES

US ARMY CORPS

OF ENGINEERS ®

LOUISvILLE DISTRICT

CC

L2-30

DEPUTY

L2-30 206

CSS

COMM

SMA

ACCP

STAIR

ST2

FIRST SGT

LOBBY

ELEVATOR

EL2

STORAGE

MULTIPURPOSE

ROOM

B B

2 3 vvS

WOMEN

TRAINING

TRAINING CELL

DO CELL

OPEN

CORR

-AN

MEN

C SM

SM

BREAKROOM

COLLABORATIVE

CONFERENCE

SECOND FLOOR SECURITY PLAN

SCALE: 3/16" = 1'-0"

0 4' 8' 12'

FILE:

DATE:

BIM 360://108962 LacklandRenov/108962 E B310 Central.rvt

5/14/2019 9:45:29 AM

***SUPPORT vALUE ENGINEERING - IT PAYS***

ARIMS: 200A

Disposition: Maintain for 15yrs after construction.

SHEET

REFERENCE

NUMBER:

TY111

CERTIFIED FINAL

214 212

C O

P Y

R

IG

H T

B

U R

N S

A N

D M

C D

O N

N E

L L

E N

G

IN

E E

R

IN

G C

O M

P A

N Y

IN

C

U S F

E D

E R A

L G

O V E R N

M E N

T H

A S U

N

LI

M

IT

E D

R E P R

O D

U C

T

IV

E

R

IG

H

F

S S v v

.N

.M P

Y

N O v A

T E

B

F

O R

I

S

J

IN

T

B A

S E

S A

N A

N T

O N

IO

T E

X

C O

N D

F L

O

C U

R

IT

Y P

L v

IS

IO

S C

R

IP

T

IO

M B

P

R

R

T

IF

IE

D

F

IN

(8

-9 s A w a rd e d

S e p te m b e r

Q

R C

/W

Q

R R

A1

A

T E

S C

A L E

A S

I N

D

IC

A T

A W

IN

G

C O

D

O

J E

C T

E N

G

IN

E E

R /A

R C

H

IT

E

S

IG

N E

D B

Y

S S

T R

A T

T

A W

N B

Y

R

T H

O M

P S

H

E C

K E

D B

Y

C

P L U

M M

.S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

R

P S

O F

E N

G

IN

E E

U

IS

v

IL

L E

, K E

N T

U C

R

M c

D O

N N

E

R

K W

N S

A S

C

IT

Y M

O

File details come from the government source that posted it. Updated .