Gillig Bus Repairs for Yosemite NP
Solicitation number
140P8526Q0034
Issued by

About this file

This is a Statement of Work for repairs to six Gillig shuttle buses at Yosemite National Park. The National Park Service owns the buses, which are operated by the park's concessioner. Five of the six buses are currently out of service and require extensive repairs including wire harness replacements (buses 20513 and 20518), engine replacements (buses 21101, 21102, and 21104), and DPIM module replacement (bus 21103). All buses are Gillig hybrid electric vehicles: two 2005 models (G19D102N4) and four 2011 models (G30D102N4).

The contractor must be a Gillig-authorized service partner or factory-certified technician at contract award and throughout performance. All repairs, including diagnostics, disassembly, rebuilding, calibration, and testing, must be performed at an authorized Gillig repair facility; mobile or field repairs are prohibited unless pre-approved in writing by the Contracting Officer. The contractor is responsible for all labor, tools, equipment, OEM parts, transportation, and incidentals. Key deliverables include diagnostic reports for each bus, a repair plan with parts list, written completion reports, final operational testing results with signed certification, and warranty documentation. Overhauled engines must include at least a 2-year, 100,000-mile parts and labor warranty with full coverage for defects in materials or workmanship. The contractor must coordinate scheduling with the NPS Contracting Officer's Representative (COR) and the concessioner to prioritize repairs while maintaining maximum shuttle service availability. The performance period extends from contract award through December 31, 2025. Invoices must be submitted in arrears through the Department of Treasury's Invoice Processing Platform with a final invoice due within 30 days of the performance period end. The contractor must maintain workers' compensation and liability insurance and comply with all OSHA, federal, state, and local safety regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

REPAIRS TO GILLIG BUSES

Yosemite National Park

1. BACKGROUND

Yosemite National Park supports visitor transportation throughout the park by providing shuttle buses at no charge to the public. The shuttle system is a core component of the park’s mission to provide reliable shuttle service to reduce traffic and ensure accessibility needs are met.

Shuttles are owned by the National Park Service (NPS) and operated by the park’s concessioner, which is also contracted to provide routine bus maintenance in the performance of their contract with the government. However, such maintenance does not include the repairs needed under this current requirement. Six buses need extensive repairs, with five of the buses currently out of service.

2. SCOPE

The contractor shall furnish all labor, tools, equipment, materials, OEM parts, transportation, and incidentals necessary to complete the repairs outlined below in accordance with manufacturer specifications and industry best practices.

The Contractor must be a Gillig-authorized service partner or factory-certified technician at the time of the award and for the duration of the contract. All repair, including diagnostic, disassembly, rebuilding, calibration, and testing work shall be performed at an authorized Gillig repair facility. Mobile or field repairs conducted outside of an authorized Gillig facility are not permitted for this scope of work, unless otherwise requested by the Contractor and approved in writing by the Contracting Officer in advance of performance. Proof of current authorization, including dealership or service certification documentation issued by Gillig, shall be submitted to the Government upon request. Subcontracting repair work to non-authorized facilities is strictly prohibited.

3. OBJECTIVES

This contract aims to deliver diagnostic, repair, and corrective maintenance services for the six shuttle buses listed here, ensuring that each vehicle is restored to a safe, dependable, and fully functional state as recommended by the manufacturer.

4. REQUIREMENTS

4.1. Independently, and not as an agent of the government, the contractor shall provide the

National Park Service with all labor, supplies, materials, equipment, and travel necessary to repair the shuttle buses described in this contract.

4.2. Contractor shall install all equipment and materials in accordance with the manufacturer’s specifications and recommendations first and any other industry standards second.

4.3. See table below for identified issues; diagnostic phase may identify additional maintenance needed.

Table 1 Equipment for Maintenance/Repair

Bus No.

Make / Model Year VIN Service

Status Identified Issues

20513 Gillig / G19D102N4 2005 15GGD191151075059 Out of

Service Wire harness replacement

20518 Gillig / G19D102N4 2005 15GGD191551075064 Out of

Service Wire harness replacement

21101 Gillig / G30D102N4 2011 15GGD301XB1179747 Out of

Service Engine replacement

21102 Gillig / G30D102N4 2011 15GGD3011B1179748 Out of

Service Engine replacement

21103 Gillig / G30D102N4 2011 15GGD3013B1179749 Out of

Service DPIM Module

21104 Gillig / G30D102N4 2011 15GGD301XB1179750 In

Service Engine replacement

1 2005 Gillig, Model G19D102N4, are low-floor, Hybrid Electric Vehicles (HEV), 40-foot length 2 2011 Gillig, Model G30D102N4, are low-floor, Hybrid Electric Vehicles (HEV), 40-foot length

5. TASKS

5.1. Task 1 – Transportation and Towing

5.1.1. The pickup and delivery address for all buses is at the Yosemite Garage, 9002 Village

Drive, in Yosemite Valley, California. The contractor is solely responsible for transporting buses to and from the repair facility.

5.1.2. The contractor shall coordinate with the NPS Contracting Officer’s Representative (COR) and the concessioner’s designated point of contact (hereby referred to as “Concessioner”) to schedule bus transports to and from the repair facility.

5.1.3. Contractor shall coordinate with the COR and Concessioner to prioritize shuttle repairs in a way that keeps as many shuttles in service as possible while ensuring timely completion of repairs.

5.2. Task 2 – Diagnostics

The contractor shall conduct a full diagnostic assessment of each bus, to include:

5.2.1. Check all deficiencies identified by NPS

5.2.2. Confirm all reported deficiencies and identify any additional issues

5.2.3. Provide written inspection reports for NPS approval before any major repairs begin

5.3. Task 3 – Repair

The Contractor shall:

5.3.1. Disassemble, remove, repair, rebuild, or replace failed or worn components identified and verified during diagnostics, in accordance with Gillig service manuals and technical bulletins.

5.3.2. Reassemble all components, torque fasteners to manufacturer specifications, and verify proper alignment and fitment.

5.3.3. Provide all replacement parts that meet or exceed Gillig specifications. Use of remanufactured parts shall be permitted only if OEM-approved and with prior written approval from the Contracting Officer.

5.3.4. Provide applicable warranty information for parts and labor.

5.3.5. Perform repairs and install all equipment and materials in accordance with the manufacturer’s specifications and recommendations first and any other industry standards second.

5.3.6. Conduct post-repair testing to verify safe and reliable operation.

5.3.7. Document all work performed.

5.4. Task 4 – Testing

After completion of repairs, the Contractor shall perform comprehensive testing to verify that all systems and components manipulated during the repair are functional according to manufacturer specifications. Testing shall include, but is not limited to:

5.4.1. Operational Checks to confirm proper performance of repaired systems.

5.4.2. Use of diagnostic scans and tools to identify and resolve any remaining fault codes.

5.4.3. Conducting controlled road testing to validate vehicle performance under normal operating conditions.

5.4.4. Documentation of all test results and provision of a signed certificate of compliance with manufacturer specifications and/or applicable standards.

6. DELIVERABLES

The contractor shall provide:

6.1. Proof of licensing, certification, and documentation verifying that the contractor is a Gillig authorized service partner and/or factory-certified technician, upon request.

6.2. Diagnostic reports for each bus.

6.3. A repair plan to include a parts list for each vehicle.

6.4. Written completion report summarizing completed repairs.

6.5. Final operational testing results and certification.

6.6. Warranty documentation for parts and labor.

7. WARRANTY

7.1. Overhauled engines shall include at least a 2-year up to 100,000-mile parts and labor.

7.2. The warranty must include the following:

7.2.1. Full coverage of parts and labor for defects in materials or workmanship

7.2.2. Prompt replacement/repair of any major issues

7.3. The contractor is required to provide thorough documentation detailing both standard and additional warranties.

7.4. Pass-through of any longer OEM warranties is mandatory at no added cost to government.

7.5. Extended warranty options may be proposed as add-ons.

8. VERIFICATION OF REPAIR METHODS

The contractor shall verify that all materials and repair methods shown in this Statement of Work are correct and suitable for the project. Any discrepancies in materials or repair methods shall be immediately brought to the attention of the Contracting Officer and COR before proceeding. The Contractor shall notify the Contracting Officer and COR of any significant deviation in measurements and quantities that will affect the intended outcome of the project or result in a change of cost or time to complete the work.

9. PERSONNEL QUALIFICATIONS

9.1. Personnel qualifications include, but are not limited to, being knowledgeable of Gillig repair procedures, and being certified or authorized through Gillig. The contractor shall make no substitutions or subcontracts without obtaining prior approval from the Contracting Officer.

9.2. The Contractor shall, without expense to the Government, be responsible for obtaining any necessary licenses and permits, and complying with all applicable federal, state and municipal laws, codes and regulations.

9.3. The Contractor shall provide proof of licensing, certification, and documentation verifying that the contractor is an authorized Gillig service provider, upon request.

10. UNANTICIPATED CONDITIONS AND REPORTING

10.1. The Contractor shall include an additional 15% of the overall project cost for unforeseen and undiscovered damages or repairs that were not initially found at the inspection and estimation process.

10.1.1. If during the execution of the project, additional damage above the allowed 15% is discovered, the Contractor shall provide the COR and Contracting Officer, within three (3) calendar days, with a written estimate for additional labor and parts to include any overhead and profit.

10.2. Should the findings in the inspection report determine that the specified additional repair is necessary, the Contracting Officer will make the determination as to how the contractor shall proceed. The Contractor shall NOT procure any additional work without prior approval; to do so is at the Contractor’s own risk, with no liability of the government.

11. CONTRACTOR’S AUTHORIZED REPRESENTATIVE

Upon contract award, the Contractor shall provide to the CO with the name, email, and primary phone number of the Contractor's representative and an alternate contact who is responsible for overseeing the performance of this contract. This person must be able to make decisions for the company. The Contractor's representative will report to the COR.

12. COORDINATION AND SCHEDULING OF WORK

12.1. All work is to be scheduled and coordinated through the COR. Within 5 working days of receiving the contract, the Contractor shall establish contact with the assigned COR so that mutually agreeable time frames for scheduling and performing the prescribed work can be established.

12.2. Any proposed changes to schedule or scope of work must be submitted in writing per the description under “Contracting Officer’s Representative” above.

12.3. If, at any time, the COR determines that the work is unsatisfactory or is being conducted in an unsafe manner, the contractor will be notified and shall immediately cease all work activities.

13. ENVIRONMENTAL CONCERNS AND SAFETY STANDARDS

13.1. The contractor and each of their employees shall work in compliance with all applicable OSHA, Federal, state and local safety laws and regulations.

13.2. The contractor shall provide and ensure that all personnel at the workplace use the proper Personal Protective Equipment (PPE) required by OSHA regulations.

13.3. The contractor shall take all necessary precautions for safety and shall provide reasonable protection to prevent damage, injury or loss to people, properties, equipment, and vehicles.

13.4. Damage caused by the contractor to any property shall be repaired or replaced to the satisfaction of the Government at the expense of the contractor. The Government, at its sole direction, may elect to repair or replace the damaged property, and deduct such costs from monies due to the contractor.

14. INSURANCE

14.1. General: The Contractor shall be insured in accordance with state and federal insurance regulations. The Government will not accept any liability due to contractor employee negligence.

14.2. Workers Compensation: The contractor shall furnish proof of workers’ compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation State and Federal Laws.

14.3. Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims due to bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

15. LOSS OR DAMAGE

15.1. If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this contract, the contractor shall be responsible for the same.

15.2. The government, at its discretion, in lieu of repayment, may require the contractor to replace, at its own expense, all property as directed by the Contracting Officer.

16. INVOICING

16.1. Invoices shall be submitted in arrears, and no advance payments shall be authorized. The contractor shall submit invoices for payment as follows:

16.1.1. Invoices must be submitted to the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online through IPP. See:

https://www.ipp.gov/index.htm

16.2. After contract award, if not already enrolled, the contractor will receive an email from IPP with a link to log in and set up their account in IPP. The benefits of registering with IPP include the ability to create invoices directly from a contract award and submit them electronically, as well as email notifications when invoice(s) are paid, online payment history and email notification when you are awarded a new contract.

16.3. The email notification of payment is sent when a payment is distributed to your bank account and will include all pertinent payment information. For all questions related to IPP registration and issues with submitting invoices, please contact IPP Customer Support at 1

(866) 973-3131.

16.4. The contractor shall submit a final invoice within thirty (30) calendar days after the end of the Performance Period.

16.4.1. The final invoice shall be marked as “FINAL.”

16.5. In accordance with Prompt Payment Act (Public Law 97-177), contractors are to submit proper invoices for payment. A proper invoice includes:

16.5.1. Name and address of the Contractor

16.5.2. Invoice date and invoice number

16.5.3. Contract/order number

16.5.4. Taxpayer Identification Number (TIN)

16.5.5. Description, quantity, unit of measure, unit price, and extended price

16.5.6. Shipping and payment terms (unless mutually agreed that this information is only required in the contract)

16.5.7. Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.

16.6. The invoice must contain specific information as listed above or the invoice shall be returned to the contractor within seven days after receipt, noting reasons why it is not a proper invoice. The contractor must correct and resubmit the invoice through the Invoice Processing Platform (IPP).

17. PERIOD OF PERFORMANCE

The anticipated performance period is from date of award to December 31, 2025.