Atch_01_Quote_and_Price_Schedule_Gillig.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Gillig Bus Repairs for Yosemite NP
Solicitation number
140P8526Q0034
Issued by

About this file

This is a Quote and Price Schedule template for Gillig bus repairs at Yosemite National Park. Offerors must provide itemized estimates for five specific repair projects on Gillig diesel-electric hybrid buses, including two wire harness replacements on 2005 G19D102N4 models (buses 20513 and 20518), three engine replacement jobs on 2011 G30D102N4 models (buses 21101, 21102, and 21104), and one DPIM Module repair on a 2011 G30D102N4 model (bus 21103). Each item requires a total price submission that encompasses all associated tasks and deliverables per the Statement of Work; if work does not fall under a specific line item, costs must be included in a related item.

The pricing schedule requires calculation of a subtotal followed by an additional 15 percent markup per Statement of Work Section 10.1 to arrive at the total contract value. All estimates must be rounded to two decimal places and itemized to demonstrate detailed labor, materials, and service costs. This is a firm fixed price solicitation issued as Request for Quotation 140P8526Q0034 by the National Park Service, a 100 percent total small business set-aside with NAICS code 811114 and a $9.0 million average annual receipts threshold. Quotes are due by 5:00 p.m. Pacific Time on May 29, 2026, via email only, with evaluation based on price, technical capability, and past performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 01
GILLIG BUS REPAIRS - YOSEMITE NATIONAL PARK
Quote and Price Schedule
Instructions: Offerors must provide an itemized estimate for each of the items below in addition to filling in the information on this page. Estimates shall be inclusive of all tasks and deliverables in accordance with the Statement of Work. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the itemized estimate governs. (Round to two decimal places)
Item No.Bus No.Make / ModelYearVINService StatusIdentified IssuesTotal Price
120513Gillig / G19D102N4200515GGD191151075059Out of ServiceWire harness replacement
220518Gillig / G19D102N4200515GGD191551075064Out of ServiceWire harness replacement
321101Gillig / G30D102N4201115GGD301XB1179747Out of ServiceEngine replacement
421102Gillig / G30D102N4201115GGD3011B1179748Out of ServiceEngine replacement
521103Gillig / G30D102N4201115GGD3013B1179749Out of ServiceDPIM Module
621104Gillig / G30D102N4201115GGD301XB1179750In ServiceEngine replacement
SUBTOTAL
Additional 15% (per Statement of Work, Section 10.1)
TOTAL CONTRACT VALUE

File details come from the government source that posted it. Updated .