This document is a Statement of Work (SOW) for vault toilet and septic tank pumping services at Yosemite National Park. The National Park Service requires a contractor to pump 55 vault toilets and septic tanks across 21 locations along Tioga Road from Crane Flat to Tioga Pass Entrance Station, with work to be performed over approximately 17 weeks from June 23, 2025 through October 18, 2025. The contractor must provide all labor, materials, and tools to service the locations, using suction hoses between 20-100 feet long (no larger than 2.5"), and will be responsible for removing non-disposable trash items found in the vaults.

The contractor may dispose of collected sewage at the Yosemite Creek Lift Station (YCLS) located behind Yosemite Lodge, with disposal permitted only on Mondays, Tuesdays, Wednesdays, and Fridays between 0700-1530 hours. Specific deliverables include providing pumping logs that correlate with metered gallons disposed of at YCLS, which must be submitted with invoice payments. The contract duration may be affected by seasonal snowfall, with potential variations in start and completion dates due to snow conditions that can persist into May and mid-October.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 01

RFQ 140P8525Q0032 - Vault Toilet & Septic Tank Pumping at Yosemite NP Page 1 of 2

Statement of Work

VAULT TOILET AND SEPTIC TANK PUMPING

Yosemite National Park

1. INTRODUCTION

1.1. Yosemite National Park requires a contractor to pump vault toilets and septic tanks from the Crane Flat area to the Tioga Pass Entrance Station on Hwy 120, inside Yosemite National Park.

2. BACKGROUND

2.1. The Utilities Branch services vault toilets and septic tanks throughout Yosemite National

Park. The areas from Crane Flat to Tioga Pass Entrance Station require pumping for 21 locations to include a total of 55 vault toilets and septic tanks for a period of approximately 17 weeks from 06/23/2025 through 10/18/2025.

2.1.1. Seasonal snowfall may affect actual contract start and completion dates as snow frequently occurs into May and into mid-October.

3. TASKS

3.1. The Contractor shall provide all labor, materials, tools, and services needed to fulfill the requirement. The Contractor shall:

3.1.1. Pump vault toilets in Yosemite National Park, California, along Tioga Road from

Crane Flat to Lee Vining. A map has been included to show the locations of the vault and septic locations to be serviced (Atch 04_Location Map) and the frequency of service by location (Atch 03_Service Schedule).

3.1.1.1. Hose lengths needed to reach each vault differs by location.

3.1.1.2. Lengths of hose required are 20 feet to a maximum of 100 feet.

3.1.1.3. Suction hoses no larger than 2.5” must be used to avoid large un-grindable materials that when dumped may clog sewer lines.

3.2. Contractor shall be responsible to remove any trash items in the vaults: diapers, phones, sunglasses, etc. These items cannot be disposed of when dumping into NPS wastewater treatment facility, however, may be disposed of in trash bins located at each site.

3.3. The Contractor shall notify the NPS Contracting Officer’s Representative (COR) of any circumstances of needed repair to the facilities or of any area that may affect performance of contract work, present hazardous, unsafe, or unhealthy conditions, or cause any delays or interference of work by employees of the contractor.

Attachment 01

RFQ 140P8525Q0032 - Vault Toilet & Septic Tank Pumping at Yosemite NP Page 2 of 2

4. ALLOWANCES

4.1. Contractor may take waste to the Yosemite Creek Lift Station (YCLS) and dispose of sewage collected solely from NPS owned structures. YCLS is located behind the Yosemite Lodge located at 9006 Yosemite Lodge Dr., Yosemite Valley, CA, 95389.

4.1.1. Contractor may dispose at YCLS during the week on Monday, Tuesday, Wednesday, and Friday only, between the hours of 0700-1530.

5. DELIVERABLES

5.1. Contractor shall be required to provide the pumping log to correlate with metered gallons disposed of at YCLS each time.

5.2. Contractor shall supply complete pumping logs when submitting invoice payments into IPP.gov.