Atch_01_Quote_and_Price_Schedule_New_Flyer.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- New Flyer Bus Repairs for Yosemite NP
- Solicitation number
- 140P8526Q0035
About this file
This file is a Quote and Price Schedule template for New Flyer bus repairs required by Yosemite National Park. Offerors must provide itemized cost estimates for seven specific repair and maintenance tasks on New Flyer Xcelsior diesel-electric hybrid buses, including NOx sensor replacement, twin vision camera installation, door assembly replacement, coolant hose replacement, fuel filter assembly replacement, and clutch assembly and AC compressor replacement. The template requires vendors to identify total pricing for each bus line item and calculate a subtotal, to which an additional 15% will be added per the Statement of Work Section 10.1 to establish the total contract value. All cost estimates must be inclusive of labor, materials, and all tasks and deliverables outlined in the SOW, with costs for any work not covered by specific line items rolled into related categories.
This is a firm fixed price RFQ solicitation (140P8526Q0035) issued as a 100% total small business set-aside with a NAICS code 811114 and small business size standard of $9.0 million in average annual receipts. Quotes are due by 5:00 p.m. Pacific Time on Friday, May 29, 2026, via email only. The National Park Service will award a single contract to the responsible offeror whose quote is most advantageous considering price, technical capability, and past performance. Questions must be submitted by May 19, 2026, at 1:00 p.m. PT to lisa_henson@ios.doi.gov with the solicitation number in the subject line.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 01 | |||||||
| NEW FLYER BUS REPAIRS - YOSEMITE NATIONAL PARK | |||||||
| Quote and Price Schedule | |||||||
| Instructions: Offerors must provide an itemized estimate for each of the items below in addition to filling in the information on this page. Estimates shall be inclusive of all tasks and deliverables in accordance with the Statement of Work. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the itemized estimate governs. (Round up to the penny) | |||||||
| Item No. | Bus No. | Make / Model | Year | VIN | Service Status | Identified Issues | Total Price |
| 1 | 22001 | New Flyer/ Xcelsior XDE40 | 2020 | 5FYH8FR11LF074331 | Out of Service | Nox sensor replacement | |
| 2 | 22004 | New Flyer/ Xcelsior XDE40 | 2020 | 5FYH8FR13LF074334 | In Service | Install Twin vision camera | |
| 3 | 22005 | New Flyer/ Xcelsior XDE40 | 2020 | 5FYH8FR19LF074335 | In Service | Replace door assembly | |
| 4 | 22006 | New Flyer/ Xcelsior XDE40 | 2020 | 5FYH8FR12LF074336 | Out of Service | Replace coolant hose | |
| 5 | 22008 | New Flyer/ Xcelsior XDE40 | 2020 | 5FYH8FR14LF074338 | In Service | Replace door assembly | |
| 6 | 21701 | New Flyer/ Xcelsior XDE40 | 2017 | 5FYH8FR14HB051947 | In Service | Replace fuel filter assembly | |
| 7 | 21702 | New Flyer/ Xcelsior XDE46 | 2017 | 5FYH8FR16HB051948 | In Service | Replace clutch assembly, AC compressor, hybrid battery | |
| SUBTOTAL | |||||||
| Additional 15% (per Statement of Work, Section 10.1) | |||||||
| TOTAL CONTRACT VALUE |
File details come from the government source that posted it. Updated .