Atachment+1A+-+Bid+Response.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Snow Pile Removal 2024
- Solicitation number
- MSU-24-004
- Issued by
- Ward County, North Dakota
About this file
This document is a bid response worksheet for a snow pile removal contract (Bid# MSU-24-004) issued by Minot State University in North Dakota. The contract requires the successful bidder to provide equipment and labor to remove snow from the Minot State University campus within 24 hours of receiving an order. The bid response worksheet requests information on the specific equipment (e.g. manufacturer, model, load capacity, hourly rate) the contractor will dedicate to this contract. Bidders are also asked to provide estimates on the number of loads and cubic yards of snow that can be moved per hour.
The pricing structure for this contract is based on an hourly rate, with the price per cubic yard provided for evaluation purposes only. There is no mention of any set-asides, incumbent contractors, funding sources, or other salient financial details in the provided documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| invitation-for-bid-Snow+Pile+Removal+2024.docx | DOCX document | |
| Attachment+1-Snow+Pile+Removal++.docx | DOCX document | |
| notice-of-intent-to-award.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Response
| ATTACHMENT 1A - BID RESPONSE WORKSHEET |
| BID NUMBER: MSU-24-004 |
| BID TITLE: Snow Pile Removal |
NAME OF CONTRACTOR (BIDDER):
EQUIPMENT TO BE DEDICATED TO SERVICE THIS CONTRACT FOR THE COMPLETION OF THIS WORK INCLUDES:
Equipment Type Manufacturer/Model Load Capacity which meets Manufacturer specifications for capacity of the dump bed Hourly Rate
$0.00
| Estimate of how many loads(per manufacturer specifications you can do in a hour per truck | |
| Estimate of how many cubic yards you can move in a hour (Total Truck Load Capacity x Number of Loads) | 0 |
Price Per Cubic Yard (Total hourly rate divided by cubic yards moved in a hour) ERROR:#DIV/0!
**Price per yard is for evaluation bids only. Invoices must be billed at the hourly rate.
Sheet2
| Pay loader |
| Skidsteer |
| Truck |
| Other |
File details come from the government source that posted it. Updated .