About this file

This notice of award announces a contract for integrated solid waste management and pavement clearance services at U.S. Naval Base Guam activities and other Department of Defense and federal agencies in Guam. The contract is a follow-on to the incumbent's current services and will be awarded as an indefinite delivery/indefinite quantity, total small business set-aside contract. The contract will provide landfill operations and maintenance, waste collection and disposal, recycling services, and pavement sweeping. Services will be performed at all Naval Base Guam facilities, industrial sites, medical treatment facilities, and other military or federal locations in Guam. The contract includes recurring firm-fixed-price and non-recurring indefinite-quantity elements. The period of performance is one base year with four one-year options and a six-month extension option.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
Exhibit A through Exhibit F
SUMMARY
CLINAMOUNT

0001 Phase-In Mobilization $ - 0

0002 Base Period, Recurring Work $ - 0

0003 Base Period, Non-Recurring Work $ - 0

0004 First Option Period, Recurring Work $ - 0

0005 First Option Period, Non-Recurring Work $ - 0

0006 Second Option Period, Recurring Work $ - 0

0007 Second Option Period, Non-Recurring Work $ - 0

0008 Third Option Period, Recurring Work $ - 0

0009 Third Option Period, Non-Recurring Work $ - 0

0010 Fourth Option Period, Recurring Work $ - 0

0011 Fourth Option Period, Non-Recurring Work $ - 0

0012Phase-Out Demobilization$ - 0
BASE + 4 OPTION PERIODS TOTAL$ - 0

0013 Extension (6 months), Recurring $ - 0

0014 Extension (6 months), Non-Recurring $ - 0

Base + All Option Periods + Extension TOTAL AMOUNT $ - 0

Mob

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT A - CLIN 9000
Line Item 0001 Phase In Mobilization - Base Period (01 Sep 2021 - 30 Sep 2021)
RECURRING WORK - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityUnit of IssueFrequencyUnit PriceTotal
A001 - JRM/REGION
A001AAPhase-In Mobilization1MO$ - 0
A002 - BSVE (JRM)
A002AAPhase-In Mobilization1MO$ - 0
A003 - CSS-15 (JRM)
A003AAPhase-In Mobilization1MO$ - 0
A004 - Frank Cable T-shed Funded By JRM
A004AAPhase-In Mobilization1MO$ - 0
A005 - NBG HOUSING
A005AAPhase-In Mobilization1MO$ - 0
A006 - BUMED
A006AAPhase-In Mobilization1MO$ - 0
A007 - DLA DRMO
A007AAPhase-In Mobilization1MO$ - 0
A008 - DLA DDGM
A008AAPhase-In Mobilization1MO$ - 0
A009 - NAVSUP FLCY GUAM FUELS
A009AAPhase-In Mobilization1MO$ - 0
A010 - DECA CDC
A010AAPhase-In Mobilization1MO$ - 0
A011 - DECA OROTE
A011AAPhase-In Mobilization1MO$ - 0
A012 - EODMU-5
A012AAPhase-In Mobilization1MO$ - 0
A013 - DODEA
A013AAPhase-In Mobilization1MO$ - 0
A014 - USCG
A014AAPhase-In Mobilization1MO$ - 0
A015 - NGIS
A015AAPhase-In Mobilization1MO$ - 0
A016 - NAWMU
A016AAPhase-In Mobilization1MO$ - 0
A017 - 30 NCR
A017AAPhase-In Mobilization1MO$ - 0
A018 - MSC USNS Ship Support
A018AAPhase-In Mobilization1MO$ - 0
A019 - MSC Frank Cable
A019AAPhase-In Mobilization1MO$ - 0
A020 - MSC Emory Land
A020AAPhase-In Mobilization1MO$ - 0
A021 - MSC SSU B3110
A020AAPhase-In Mobilization1MO$ - 0
A022 - MESG-1
A022AAPhase-In Mobilization1MO$ - 0
A023 - VA CLINIC
A023AAPhase-In Mobilization1MO$ - 0
A024 - FEMA
A024AAPhase-In Mobilization1MO$ - 0
A025 - MCBCB
A025AAPhase-In Mobilization1MO$ - 0

BASE PERIOD PHASE IN MOBILIZATION TOTAL $ - 0

ELINs-Base Period-FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Price - Base Period (01 Oct 2021 - 31 Aug 2022)
RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityU/IFrequencyUnit PriceTotal
A001 - JRM/REGIONRECURRING PRICE WORK
A00101Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.2,899.00TON$ - 0
A00102Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.419.00EA$ - 0
A00103Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls252.00HRS$ - 0
A00104Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.211.00EA104$ - 0
A00105Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.212.00EA104$ - 0
A00106Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.29.00EA52$ - 0
A00107Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.245.00EA104$ - 0
A00108Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
A00109Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.25.00EA12$ - 0
A00110Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing)110.00EA52$ - 0
A00111Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED)20.00EAAS NEEDED$ - 0
Sub-Total$ - 0
A002 - BSVE (JRM)RECURRING PRICE WORK
A00201Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA36$ - 0
Sub-Total$ - 0
A003 - CSS-15 (JRM)RECURRING PRICE WORK
A00301Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6400.00EA$ - 0
Sub-Total$ - 0
A004 - Frank Cable T-shed Funded By JRMRECURRING PRICE WORK
A00401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.412.00TON$ - 0
A00402Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.252.00EAAS NEEDED$ - 0
Sub-Total$ - 0
A005 - NBG HOUSINGRECURRING PRICE WORK
A00501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.776.00TON$ - 0
A00502Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
A00503Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2879.00EA52$ - 0
A00504Pavement Clearance per Spec Item 3.52,500.00MSF12$ - 0
Sub-Total$ - 0
A006 - BUMEDRECURRING PRICE WORK
A00601Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.224.00TON$ - 0
A00602Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.22.00EA52$ - 0
A00603Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
A00604Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA6$ - 0
A00605Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
A00606Pavement Clearance per Spec Item 3.5650.00MSF12$ - 0
Sub-Total$ - 0
A007 - DLA DRMORECURRING PRICE WORK
A00701Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.55.00TON$ - 0
A00702Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
B008 - DLA (2116 & 2118) DDGMRECURRING PRICE WORK
A00801Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.35.00TON$ - 0
A00802Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
Sub-Total$ - 0
A009 - NAVSUP FLCY GUAM FUELSRECURRING PRICE WORK
A00901Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.16.00TON$ - 0
Sub-Total$ - 0
A010 - DECA CDCRECURRING PRICE WORK
A01001Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.550.00TON$ - 0
A01002Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA104$ - 0
Sub-Total$ - 0
A011 - DECA OROTERECURRING PRICE WORK
A01101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4268.00TON$ - 0
A01102Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.230.00EAAS NEEDED$ - 0
Sub-Total$ - 0
A012 - EODMU-5RECURRING PRICE WORK
A01201Pavement Clearance Per Spec 3.5325.00MSF4$ - 0
Sub-Total$ - 0
A013 - DODEARECURRING PRICE WORK
A01301Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.93.00TON$ - 0
A01302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
A014 - USCGRECURRING PRICE WORK
A01401Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.46.00TON$ - 0
A01402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
A015 - NGISRECURRING PRICE WORK
A01501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.74.80TON$ - 0
A01502Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2143.00EA52$ - 0
Sub-Total$ - 0
A016 - NAWMURECURRING PRICE WORK
A01601Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
Sub-Total$ - 0
A017 - 30 NCRRECURRING PRICE WORK
A01701Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load)29.00EAAS NEEDED$ - 0
Sub-Total$ - 0
A018 - MSC USNS Ship SupportRECURRING PRICE WORK
A01801Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4335.00TON$ - 0
A01802Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.410.00EAAS NEEDED$ - 0
A01803Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.250.00EAAS NEEDED$ - 0
A01804Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.220.00EAAS NEEDED$ - 0
Sub-Total$ - 0
A019 - MSC Frank CableRECURRING PRICE WORK
A01901Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4382.00TON$ - 0
Sub-Total$ - 0
A020 - MSC Emory LandRECURRING PRICE WORK
A02001Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4224.00TON$ - 0
Sub-Total$ - 0
A021 - MSC SSU B3110RECURRING PRICE WORK
A02101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0
A022 - MESG-1RECURRING PRICE WORK
A02201Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.49.00TON$ - 0
Sub-Total$ - 0
A023 - VA CLINICRECURRING PRICE WORK
A02301Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
A02302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
A024 - FEMARECURRING PRICE WORK
A02401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
A02402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
A025 - MCBCBRECURRING PRICE WORK
A02501Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0

RECURRING WORK BASE PERIOD TOTAL $ - 0

ELINs-Base Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Price - Base Period (01 Oct 2021 - 31 Aug 2022)
NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Solid Waste Collection and Disposal per Spec Item 4.1The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4100.00TON$ - 0
A701Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
A702Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
A703Recyclables 90 Gallon Container per Spec Item 4.4Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
A704Foreign Waste Collection & Disposal per Spec Item 4.5The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.444.00EA$ - 0
A705Mixed Load per Spec Item 4.6Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load)100.00EA$ - 0
A706Pavement Clearance (Sweeping Services) per Spec Item 4.7The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.510,000.00MSF$ - 0
A707Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply.Not to Exceed (NTE)$ 50,000
A708Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort.1,200HR (Hour)$ - 0
A709Overtime Work per Spec Item 4.10Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1800HR (Hour)$ - 0
TOTAL INDEFINITE QUANTITY PRICE$

ELINs-1st Opt Period-FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring Price - 1st Option Period (01 Sep 2022 - 31 Aug 2023)
RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityU/IFrequencyUnit PriceTotal
B001 - JRM/REGIONRECURRING PRICE WORK
B00101Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.2,899.00TON$ - 0
B00102Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.419.00EA$ - 0
B00103Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls252.00HRS$ - 0
B00104Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.211.00EA104$ - 0
B00105Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.212.00EA104$ - 0
B00106Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.29.00EA52$ - 0
B00107Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.245.00EA104$ - 0
B00108Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
B00109Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.25.00EA12$ - 0
B00110Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing)110.00EA52$ - 0
B00111Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED)20.00EAAS NEEDED$ - 0
Sub-Total$ - 0
B002 - BSVE (JRM)RECURRING PRICE WORK
B00201Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA36$ - 0
Sub-Total$ - 0
B003 - CSS-15 (JRM)RECURRING PRICE WORK
B00301Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6400.00EA$ - 0
Sub-Total$ - 0
B004 - Frank Cable T-shed Funded By JRMRECURRING PRICE WORK
B00401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.412.00TON$ - 0
B00402Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.252.00EAAS NEEDED$ - 0
Sub-Total$ - 0
B005 - NBG HOUSINGRECURRING PRICE WORK
B00501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.776.00TON$ - 0
B00502Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
B00503Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2879.00EA52$ - 0
B00504Pavement Clearance per Spec Item 3.52,500.00MSF12$ - 0
Sub-Total$ - 0
B006 - BUMEDRECURRING PRICE WORK
B00601Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.224.00TON$ - 0
B00602Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.22.00EA52$ - 0
B00603Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
B00604Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA6$ - 0
B00605Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
B00606Pavement Clearance per Spec Item 3.5650.00MSF12$ - 0
Sub-Total$ - 0
B007 - DLA (631) DRMORECURRING PRICE WORK
B00701Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.55.00TON$ - 0
B00702Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
B008 - DLA (2116 & 2118) DDGMRECURRING PRICE WORK
B00801Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.35.00TON$ - 0
B00802Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
Sub-Total$ - 0
B009 - NAVSUP FLCY GUAM FUELSRECURRING PRICE WORK
B00901Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.16.00TON$ - 0
Sub-Total$ - 0
B010 - DECA (CDC)RECURRING PRICE WORK
B01001Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.550.00TON$ - 0
B01002Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA104$ - 0
Sub-Total$ - 0
B011 - DECA OROTERECURRING PRICE WORK
B01101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4268.00TON$ - 0
B01102Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.230.00EAAS NEEDED$ - 0
Sub-Total$ - 0
B012 - EODMU-5RECURRING PRICE WORK
B01201Pavement Clearance Per Spec 3.5325.00MSF4$ - 0
Sub-Total$ - 0
B013 - DODEARECURRING PRICE WORK
B01301Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.93.00TON$ - 0
B01302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
B014 - USCGRECURRING PRICE WORK
B01401Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.46.00TON$ - 0
B01402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
B015 - NGISRECURRING PRICE WORK
B01501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.74.80TON$ - 0
B01502Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2143.00EA52$ - 0
Sub-Total$ - 0
B016 - NAWMURECURRING PRICE WORK
B01601Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
Sub-Total$ - 0
B017 - 30 NCRRECURRING PRICE WORK
B01701Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load)29.00EAAS NEEDED$ - 0
Sub-Total$ - 0
B018 - MSC USNS Ship SupportRECURRING PRICE WORK
B01801Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4335.00TON$ - 0
B01802Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.410.00EAAS NEEDED$ - 0
B01803Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.250.00EAAS NEEDED$ - 0
B01804Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.220.00EAAS NEEDED$ - 0
Sub-Total$ - 0
B019 - MSC Frank CableRECURRING PRICE WORK
B01901Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4382.00TON$ - 0
Sub-Total$ - 0
B020 - MSC Emory LandRECURRING PRICE WORK
B02001Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4224.00TON$ - 0
Sub-Total$ - 0
B021 - MSC SSU B3110RECURRING PRICE WORK
B02101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0
B022 - MESG-1RECURRING PRICE WORK
B02201Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.49.00TON$ - 0
Sub-Total$ - 0
B023 - VA CLINICRECURRING PRICE WORK
B02301Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
B02302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
B024 - FEMARECURRING PRICE WORK
B02401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
B02402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
B025 - MCBCBRECURRING PRICE WORK
B02501Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0

RECURRING WORK FIRST OPTION PERIOD TOTAL $ - 0

ELINs-1st Opt Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Price - 1st Option Period (01 Sep 2022 - 31 Aug 2023)
NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Solid Waste Collection and Disposal per Spec Item 4.1The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4100.00TON$ - 0
B701Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
B702Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
B703Recyclables 90 Gallon Container per Spec Item 4.4Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
B704Foreign Waste Collection & Disposal per Spec Item 4.5The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.444.00EA$ - 0
B705Mixed Load per Spec Item 4.6Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load)100.00EA$ - 0
B706Pavement Clearance (Sweeping Services) per Spec Item 4.7The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.510,000.00MSF$ - 0
B707Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply.Not to Exceed (NTE)$ 50,000
B708Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort.1,200HR (Hour)$ - 0
B709Overtime Work per Spec Item 4.10Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1800HR (Hour)$ - 0
NON-RECURRING WORK FIRST OPTION PERIOD TOTAL$

ELINs -2nd Opt Period-FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT C - CLIN 9002
Line Item 0005 Recurring Price - 2nd Option Period (01 Sep 2023 - 31 Aug 2024)
RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityU/IFrequencyUnit PriceTotal
C001 - JRM/REGIONRECURRING PRICE WORK
C00101Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.2,899.00TON$ - 0
C00102Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.419.00EA$ - 0
C00103Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls252.00HRS$ - 0
C00104Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.211.00EA104$ - 0
C00105Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.212.00EA104$ - 0
C00106Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.29.00EA52$ - 0
C00107Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.245.00EA104$ - 0
C00108Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
C00109Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.25.00EA12$ - 0
C00110Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing)110.00EA52$ - 0
C00111Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED)20.00EAAS NEEDED$ - 0
Sub-Total$ - 0
C002 - BSVE (JRM)RECURRING PRICE WORK
C00201Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA36$ - 0
Sub-Total$ - 0
C003 - CSS-15 (JRM)RECURRING PRICE WORK
C00301Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6400.00EA$ - 0
Sub-Total$ - 0
C004 - Frank Cable T-shed Funded By JRMRECURRING PRICE WORK
C00401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.412.00TON$ - 0
C00402Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.252.00EAAS NEEDED$ - 0
Sub-Total$ - 0
C005 - NBG HOUSINGRECURRING PRICE WORK
C00501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.776.00TON$ - 0
C00502Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
C00503Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2879.00EA52$ - 0
C00504Pavement Clearance per Spec Item 3.52,500.00MSF12$ - 0
Sub-Total$ - 0
C006 - BUMEDRECURRING PRICE WORK
C00601Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.224.00TON$ - 0
C00602Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.22.00EA52$ - 0
C00603Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
C00604Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA6$ - 0
C00605Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
C00606Pavement Clearance per Spec Item 3.5650.00MSF12$ - 0
Sub-Total$ - 0
C007 - DLA (631) DRMORECURRING PRICE WORK
C00701Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.55.00TON$ - 0
C00702Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
B008 - DLA (2116 & 2118) DDGMRECURRING PRICE WORK
C00801Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.35.00TON$ - 0
C00802Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
Sub-Total$ - 0
C009 - NAVSUP FLCY GUAM FUELSRECURRING PRICE WORK
C00901Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.16.00TON$ - 0
Sub-Total$ - 0
C010 - DECA (CDC)RECURRING PRICE WORK
C01001Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.550.00TON$ - 0
C01002Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA104$ - 0
Sub-Total$ - 0
C011 - DECA OROTERECURRING PRICE WORK
C01101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4268.00TON$ - 0
C01102Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.230.00EAAS NEEDED$ - 0
Sub-Total$ - 0
C012 - EODMU-5RECURRING PRICE WORK
C01201Pavement Clearance Per Spec 3.5325.00MSF4$ - 0
Sub-Total$ - 0
C013 - DODEARECURRING PRICE WORK
C01301Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.93.00TON$ - 0
C01302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
C014 - USCGRECURRING PRICE WORK
C01401Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.46.00TON$ - 0
C01402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
C015 - NGISRECURRING PRICE WORK
C01501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.74.80TON$ - 0
C01502Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2143.00EA52$ - 0
Sub-Total$ - 0
C016 - NAWMURECURRING PRICE WORK
C01601Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
Sub-Total$ - 0
C017 - 30 NCRRECURRING PRICE WORK
C01701Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load)29.00EAAS NEEDED$ - 0
Sub-Total$ - 0
C018 - MSC USNS Ship SupportRECURRING PRICE WORK
C01801Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4335.00TON$ - 0
C01802Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.410.00EAAS NEEDED$ - 0
C01803Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.250.00EAAS NEEDED$ - 0
C01804Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.220.00EAAS NEEDED$ - 0
Sub-Total$ - 0
C019 - MSC Frank CableRECURRING PRICE WORK
C01901Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4382.00TON$ - 0
Sub-Total$ - 0
C020 - MSC Emory LandRECURRING PRICE WORK
C02001Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4224.00TON$ - 0
Sub-Total$ - 0
C021 - MSC SSU B3110RECURRING PRICE WORK
C02101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0
C022 - MESG-1RECURRING PRICE WORK
C02201Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.49.00TON$ - 0
Sub-Total$ - 0
C023 - VA CLINICRECURRING PRICE WORK
C02301Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
C02302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
C024 - FEMARECURRING PRICE WORK
C02401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
C02402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
C025 - MCBCBRECURRING PRICE WORK
C02501Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0

RECURRING WORK SECOND OPTION PERIOD TOTAL $ - 0

ELINs-2nd Opt Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT C - CLIN 9002
Line Item 0006 Non-Recurring Price - 2nd Option Period (01 Sep 2023 - 31 Aug 2024)
NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Solid Waste Collection and Disposal per Spec Item 4.1The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4100.00TON$ - 0
C701Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
C702Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
C703Recyclables 90 Gallon Container per Spec Item 4.4Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
C704Foreign Waste Collection & Disposal per Spec Item 4.5The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.444.00EA$ - 0
C705Mixed Load per Spec Item 4.6Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load)100.00EA$ - 0
C706Pavement Clearance (Sweeping Services) per Spec Item 4.7The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.510,000.00MSF$ - 0
C707Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply.Not to Exceed (NTE)$ 50,000
C708Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort.1,200HR (Hour)$ - 0
C709Overtime Work per Spec Item 4.10Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1800HR (Hour)$ - 0
NON-RECURRING WORK SECOND OPTION PERIOD TOTAL$

ELINs-3rd Opt Period-FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT D - CLIN 9003
Line Item 0007 Recurring Price - 3rd Option Period (01 Sep 2024 - 31 Aug 2025)
RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityU/IFrequencyUnit PriceTotal
D001 - JRM/REGIONRECURRING PRICE WORK
D00101Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.2,899.00TON$ - 0
D00102Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.419.00EA$ - 0
D00103Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls252.00HRS$ - 0
D00104Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.211.00EA104$ - 0
D00105Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.212.00EA104$ - 0
D00106Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.29.00EA52$ - 0
D00107Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.245.00EA104$ - 0
D00108Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
D00109Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.25.00EA12$ - 0
D00110Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing)110.00EA52$ - 0
D00111Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED)20.00EAAS NEEDED$ - 0
Sub-Total$ - 0
D002 - BSVE (JRM)RECURRING PRICE WORK
D00201Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA36$ - 0
Sub-Total$ - 0
D003 - CSS-15 (JRM)RECURRING PRICE WORK
D00301Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6400.00EA$ - 0
Sub-Total$ - 0
D004 - Frank Cable T-shed Funded By JRMRECURRING PRICE WORK
D00401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.412.00TON$ - 0
D00402Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.252.00EAAS NEEDED$ - 0
Sub-Total$ - 0
D005 - NBG HOUSINGRECURRING PRICE WORK
D00501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.776.00TON$ - 0
D00502Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
D00503Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2879.00EA52$ - 0
D00504Pavement Clearance per Spec Item 3.52,500.00MSF12$ - 0
Sub-Total$ - 0
D006 - BUMEDRECURRING PRICE WORK
D00601Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.224.00TON$ - 0
D00602Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.22.00EA52$ - 0
D00603Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
D00604Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA6$ - 0
D00605Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
D00606Pavement Clearance per Spec Item 3.5650.00MSF12$ - 0
Sub-Total$ - 0
D007 - DLA (631) DRMORECURRING PRICE WORK
D00701Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.55.00TON$ - 0
D00702Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
D008 - DLA (2116 & 2118) DDGMRECURRING PRICE WORK
D00801Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.35.00TON$ - 0
D00802Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
Sub-Total$ - 0
D009 - NAVSUP FLCY GUAM FUELSRECURRING PRICE WORK
D00901Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.16.00TON$ - 0
Sub-Total$ - 0
D010 - DECA (CDC)RECURRING PRICE WORK
D01001Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.550.00TON$ - 0
D01002Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA104$ - 0
Sub-Total$ - 0
D011 - DECA OROTERECURRING PRICE WORK
D01101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4268.00TON$ - 0
D01102Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.230.00EAAS NEEDED$ - 0
Sub-Total$ - 0
D012 - EODMU-5RECURRING PRICE WORK
D01201Pavement Clearance Per Spec 3.5325.00MSF4$ - 0$ - 0
Sub-Total$ - 0
D013 - DODEARECURRING PRICE WORK
D01301Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.93.00TON$ - 0
D01302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
D014 - USCGRECURRING PRICE WORK
D01401Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.46.00TON$ - 0
D01402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA52$ - 0
Sub-Total$ - 0
D015 - NGISRECURRING PRICE WORK
D01501Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.74.80TON$ - 0
D01502Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2143.00EA52$ - 0
Sub-Total$ - 0
D016 - NAWMURECURRING PRICE WORK
D01601Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA12$ - 0
Sub-Total$ - 0
D017 - 30 NCRRECURRING PRICE WORK
D01701Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load)29.00EAAS NEEDED$ - 0
Sub-Total$ - 0
D018 - MSC USNS Ship SupportRECURRING PRICE WORK
D01801Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4335.00TON$ - 0
D01802Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.410.00EAAS NEEDED$ - 0
D01803Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.250.00EAAS NEEDED$ - 0
D01804Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.220.00EAAS NEEDED$ - 0
Sub-Total$ - 0
D019 - MSC Frank CableRECURRING PRICE WORK
D01901Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4382.00TON$ - 0
Sub-Total$ - 0
D020 - MSC Emory LandRECURRING PRICE WORK
D02001Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4224.00TON$ - 0
Sub-Total$ - 0
D021 - MSC SSU B3110RECURRING PRICE WORK
D02101Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0
D022 - CRG-1RECURRING PRICE WORK
D02201Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.49.00TON$ - 0
Sub-Total$ - 0
D023 - VA CLINICRECURRING PRICE WORK
D02301Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
D02302Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
D024 - FEMARECURRING PRICE WORK
D02401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.47.00TON$ - 0
D02402Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA24$ - 0
Sub-Total$ - 0
D025 - MCBGRECURRING PRICE WORK
D02501Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.415.00TON$ - 0
Sub-Total$ - 0

RECURRING WORK THIRD OPTION PERIOD TOTAL $ - 0

ELINs-3rd Opt Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT D - CLIN 9003
Line Item 0008 Non-Recurring Price - 3rd Option Period (01 Sep 2024 - 31 Aug 2025)
NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
D700Solid Waste Collection and Disposal per Spec Item 4.1The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4100.00TON$ - 0
D701Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
D702Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
D703Recyclables 90 Gallon Container per Spec Item 4.4Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.250.00EA$ - 0
D704Foreign Waste Collection & Disposal per Spec Item 4.5The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.444.00EA$ - 0
D705Mixed Load per Spec Item 4.6Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load)100.00EA$ - 0
D706Pavement Clearance (Sweeping Services) per Spec Item 4.7The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.510,000.00MSF$ - 0
D707Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply.Not to Exceed (NTE)$ 50,000
D708Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort.1,200HR (Hour)$ - 0
D709Overtime Work per Spec Item 4.10Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1800HR (Hour)$ - 0
NON-RECURRING WORK THIRD OPTION PERIOD TOTAL$

ELINs-4th Opt Period-FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-21-R-9100
EXHIBIT E - CLIN 9004
Line Item 0009 Recurring Price - 4th Option Period (01 Sep 2025 - 31 Aug 2026)
RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3
ELIN / Sub ELINDescriptionQuantityU/IFrequencyUnit PriceTotal
E001 - JRM/REGIONRECURRING PRICE WORK
E00101Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material.2,899.00TON$ - 0
E00102Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.419.00EA$ - 0
E00103Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls252.00HRS$ - 0
E00104Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.211.00EA104$ - 0
E00105Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.212.00EA104$ - 0
E00106Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.29.00EA52$ - 0
E00107Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.245.00EA104$ - 0
E00108Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.23.00EA52$ - 0
E00109Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.25.00EA12$ - 0
E00110Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing)110.00EA52$ - 0
E00111Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED)20.00EAAS NEEDED$ - 0
Sub-Total$ - 0
E002 - BSVE (JRM)RECURRING PRICE WORK
E00201Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.21.00EA36$ - 0
Sub-Total$ - 0
E003 - CSS-15 (JRM)RECURRING PRICE WORK
E00301Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6400.00EA$ - 0
Sub-Total$ - 0
E004 - Frank Cable T-shed Funded By JRMRECURRING PRICE WORK
E00401Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.412.00TON$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .