The file's text, extracted by GovTribe without its formatting.
Summary
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| Exhibit A through Exhibit F | |
| SUMMARY | |
| CLIN | AMOUNT |
0001 Phase-In Mobilization $ - 0
0002 Base Period, Recurring Work $ - 0
0003 Base Period, Non-Recurring Work $ - 0
0004 First Option Period, Recurring Work $ - 0
0005 First Option Period, Non-Recurring Work $ - 0
0006 Second Option Period, Recurring Work $ - 0
0007 Second Option Period, Non-Recurring Work $ - 0
0008 Third Option Period, Recurring Work $ - 0
0009 Third Option Period, Non-Recurring Work $ - 0
0010 Fourth Option Period, Recurring Work $ - 0
0011 Fourth Option Period, Non-Recurring Work $ - 0
| 0012 | Phase-Out Demobilization | $ - 0 |
| BASE + 4 OPTION PERIODS TOTAL | $ - 0 |
0013 Extension (6 months), Recurring $ - 0
0014 Extension (6 months), Non-Recurring $ - 0
Base + All Option Periods + Extension TOTAL AMOUNT $ - 0
Mob
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Phase In Mobilization - Base Period (01 Sep 2021 - 30 Sep 2021) | | | | | | |
| RECURRING WORK - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Frequency | Unit Price | Total |
| A001 - JRM/REGION | | | | | | |
| A001AA | Phase-In Mobilization | 1 | MO | | | $ - 0 |
| A002 - BSVE (JRM) | | | | |
| A002AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A003 - CSS-15 (JRM) | | | | |
| A003AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A004 - Frank Cable T-shed Funded By JRM | | | | |
| A004AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A005 - NBG HOUSING | | | | |
| A005AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A006 - BUMED | | | | |
| A006AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A007 - DLA DRMO | | | | |
| A007AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A008 - DLA DDGM | | | | |
| A008AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A009 - NAVSUP FLCY GUAM FUELS | | | | |
| A009AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A010 - DECA CDC | | | | |
| A010AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A011 - DECA OROTE | | | | |
| A011AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A012 - EODMU-5 | | | | |
| A012AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A013 - DODEA | | | | |
| A013AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A014 - USCG | | | | |
| A014AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A015 - NGIS | | | | |
| A015AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A016 - NAWMU | | | | |
| A016AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A017 - 30 NCR | | | | |
| A017AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A018 - MSC USNS Ship Support | | | | |
| A018AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A019 - MSC Frank Cable | | | | |
| A019AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A020 - MSC Emory Land | | | | |
| A020AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A021 - MSC SSU B3110 | | | | |
| A020AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A022 - MESG-1 | | | | |
| A022AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A023 - VA CLINIC | | | | |
| A023AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A024 - FEMA | | | | |
| A024AA | Phase-In Mobilization | 1 | MO | $ - 0 |
| A025 - MCBCB | | | | |
| A025AA | Phase-In Mobilization | 1 | MO | $ - 0 |
BASE PERIOD PHASE IN MOBILIZATION TOTAL $ - 0
ELINs-Base Period-FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Price - Base Period (01 Oct 2021 - 31 Aug 2022) | | | | | | |
| RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | U/I | Frequency | Unit Price | Total |
| A001 - JRM/REGION | RECURRING PRICE WORK | | | | | |
| A00101 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 2,899.00 | TON | | | $ - 0 |
| A00102 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 19.00 | EA | | | $ - 0 |
| A00103 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls | 252.00 | HRS | | | $ - 0 |
| A00104 | Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 11.00 | EA | 104 | | $ - 0 |
| A00105 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 12.00 | EA | 104 | | $ - 0 |
| A00106 | Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 9.00 | EA | 52 | | $ - 0 |
| A00107 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 45.00 | EA | 104 | | $ - 0 |
| A00108 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| A00109 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 5.00 | EA | 12 | | $ - 0 |
| A00110 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing) | 110.00 | EA | 52 | | $ - 0 |
| A00111 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED) | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A002 - BSVE (JRM) | RECURRING PRICE WORK | | | | | |
| A00201 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 36 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A003 - CSS-15 (JRM) | RECURRING PRICE WORK | | | | |
| A00301 | Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6 | 400.00 | EA | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A004 - Frank Cable T-shed Funded By JRM | RECURRING PRICE WORK | | | | | |
| A00401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 12.00 | TON | | | $ - 0 |
| A00402 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 52.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A005 - NBG HOUSING | RECURRING PRICE WORK | | | | | |
| A00501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 776.00 | TON | | | $ - 0 |
| A00502 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| A00503 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 879.00 | EA | 52 | | $ - 0 |
| A00504 | Pavement Clearance per Spec Item 3.5 | 2,500.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A006 - BUMED | RECURRING PRICE WORK | | | | | |
| A00601 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 224.00 | TON | | | $ - 0 |
| A00602 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 2.00 | EA | 52 | | $ - 0 |
| A00603 | Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| A00604 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 6 | | $ - 0 |
| A00605 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| A00606 | Pavement Clearance per Spec Item 3.5 | 650.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A007 - DLA DRMO | RECURRING PRICE WORK | | | | | |
| A00701 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 55.00 | TON | | | $ - 0 |
| A00702 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B008 - DLA (2116 & 2118) DDGM | RECURRING PRICE WORK | | | | | |
| A00801 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 35.00 | TON | | | $ - 0 |
| A00802 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A009 - NAVSUP FLCY GUAM FUELS | RECURRING PRICE WORK | | | | |
| A00901 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 16.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A010 - DECA CDC | RECURRING PRICE WORK | | | | | |
| A01001 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 550.00 | TON | | | $ - 0 |
| A01002 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 104 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A011 - DECA OROTE | RECURRING PRICE WORK | | | | | |
| A01101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 268.00 | TON | | | $ - 0 |
| A01102 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 30.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A012 - EODMU-5 | RECURRING PRICE WORK | | | | | |
| A01201 | Pavement Clearance Per Spec 3.5 | 325.00 | MSF | 4 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A013 - DODEA | RECURRING PRICE WORK | | | | | |
| A01301 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 93.00 | TON | | | $ - 0 |
| A01302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A014 - USCG | RECURRING PRICE WORK | | | | | |
| A01401 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 46.00 | TON | | | $ - 0 |
| A01402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A015 - NGIS | RECURRING PRICE WORK | | | | | |
| A01501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 74.80 | TON | | | $ - 0 |
| A01502 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 143.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A016 - NAWMU | RECURRING PRICE WORK | | | | | |
| A01601 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A017 - 30 NCR | RECURRING PRICE WORK | | | | | |
| A01701 | Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load) | 29.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A018 - MSC USNS Ship Support | RECURRING PRICE WORK | | | | | |
| A01801 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 335.00 | TON | | | $ - 0 |
| A01802 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 10.00 | EA | AS NEEDED | | $ - 0 |
| A01803 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 50.00 | EA | AS NEEDED | | $ - 0 |
| A01804 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A019 - MSC Frank Cable | RECURRING PRICE WORK | | | | |
| A01901 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 382.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A020 - MSC Emory Land | RECURRING PRICE WORK | | | | |
| A02001 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 224.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A021 - MSC SSU B3110 | RECURRING PRICE WORK | | | | |
| A02101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A022 - MESG-1 | RECURRING PRICE WORK | | | | |
| A02201 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 9.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| A023 - VA CLINIC | RECURRING PRICE WORK | | | | | |
| A02301 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| A02302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A024 - FEMA | RECURRING PRICE WORK | | | | | |
| A02401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| A02402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| A025 - MCBCB | RECURRING PRICE WORK | | | | |
| A02501 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
RECURRING WORK BASE PERIOD TOTAL $ - 0
ELINs-Base Period-IDIQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Price - Base Period (01 Oct 2021 - 31 Aug 2022) | | | | | | |
| NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4 | | | | | | |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Solid Waste Collection and Disposal per Spec Item 4.1 | The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4 | 100.00 | TON | | $ - 0 |
| A701 | Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| A702 | Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| A703 | Recyclables 90 Gallon Container per Spec Item 4.4 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| A704 | Foreign Waste Collection & Disposal per Spec Item 4.5 | The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.4 | 44.00 | EA | | $ - 0 |
| A705 | Mixed Load per Spec Item 4.6 | Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load) | 100.00 | EA | | $ - 0 |
| A706 | Pavement Clearance (Sweeping Services) per Spec Item 4.7 | The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.5 | 10,000.00 | MSF | | $ - 0 |
| A707 | Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8 | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed (NTE) | | | $ 50,000 |
| A708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9 | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,200 | HR (Hour) | | $ - 0 |
| A709 | Overtime Work per Spec Item 4.10 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1 | 800 | HR (Hour) | | $ - 0 |
| | TOTAL INDEFINITE QUANTITY PRICE | | | | $ |
ELINs-1st Opt Period-FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Price - 1st Option Period (01 Sep 2022 - 31 Aug 2023) | | | | | | |
| RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | U/I | Frequency | Unit Price | Total |
| B001 - JRM/REGION | RECURRING PRICE WORK | | | | | |
| B00101 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 2,899.00 | TON | | | $ - 0 |
| B00102 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 19.00 | EA | | | $ - 0 |
| B00103 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls | 252.00 | HRS | | | $ - 0 |
| B00104 | Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 11.00 | EA | 104 | | $ - 0 |
| B00105 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 12.00 | EA | 104 | | $ - 0 |
| B00106 | Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 9.00 | EA | 52 | | $ - 0 |
| B00107 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 45.00 | EA | 104 | | $ - 0 |
| B00108 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| B00109 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 5.00 | EA | 12 | | $ - 0 |
| B00110 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing) | 110.00 | EA | 52 | | $ - 0 |
| B00111 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED) | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B002 - BSVE (JRM) | RECURRING PRICE WORK | | | | | |
| B00201 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 36 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B003 - CSS-15 (JRM) | RECURRING PRICE WORK | | | | |
| B00301 | Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6 | 400.00 | EA | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B004 - Frank Cable T-shed Funded By JRM | RECURRING PRICE WORK | | | | | |
| B00401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 12.00 | TON | | | $ - 0 |
| B00402 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 52.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B005 - NBG HOUSING | RECURRING PRICE WORK | | | | | |
| B00501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 776.00 | TON | | | $ - 0 |
| B00502 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| B00503 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 879.00 | EA | 52 | | $ - 0 |
| B00504 | Pavement Clearance per Spec Item 3.5 | 2,500.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B006 - BUMED | RECURRING PRICE WORK | | | | | |
| B00601 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 224.00 | TON | | | $ - 0 |
| B00602 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 2.00 | EA | 52 | | $ - 0 |
| B00603 | Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| B00604 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 6 | | $ - 0 |
| B00605 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| B00606 | Pavement Clearance per Spec Item 3.5 | 650.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B007 - DLA (631) DRMO | RECURRING PRICE WORK | | | | | |
| B00701 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 55.00 | TON | | | $ - 0 |
| B00702 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B008 - DLA (2116 & 2118) DDGM | RECURRING PRICE WORK | | | | | |
| B00801 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 35.00 | TON | | | $ - 0 |
| B00802 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B009 - NAVSUP FLCY GUAM FUELS | RECURRING PRICE WORK | | | | |
| B00901 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 16.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B010 - DECA (CDC) | RECURRING PRICE WORK | | | | | |
| B01001 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 550.00 | TON | | | $ - 0 |
| B01002 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 104 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B011 - DECA OROTE | RECURRING PRICE WORK | | | | | |
| B01101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 268.00 | TON | | | $ - 0 |
| B01102 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 30.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B012 - EODMU-5 | RECURRING PRICE WORK | | | | | |
| B01201 | Pavement Clearance Per Spec 3.5 | 325.00 | MSF | 4 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B013 - DODEA | RECURRING PRICE WORK | | | | | |
| B01301 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 93.00 | TON | | | $ - 0 |
| B01302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B014 - USCG | RECURRING PRICE WORK | | | | | |
| B01401 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 46.00 | TON | | | $ - 0 |
| B01402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B015 - NGIS | RECURRING PRICE WORK | | | | | |
| B01501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 74.80 | TON | | | $ - 0 |
| B01502 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 143.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B016 - NAWMU | RECURRING PRICE WORK | | | | | |
| B01601 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B017 - 30 NCR | RECURRING PRICE WORK | | | | | |
| B01701 | Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load) | 29.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B018 - MSC USNS Ship Support | RECURRING PRICE WORK | | | | | |
| B01801 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 335.00 | TON | | | $ - 0 |
| B01802 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 10.00 | EA | AS NEEDED | | $ - 0 |
| B01803 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 50.00 | EA | AS NEEDED | | $ - 0 |
| B01804 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B019 - MSC Frank Cable | RECURRING PRICE WORK | | | | |
| B01901 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 382.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B020 - MSC Emory Land | RECURRING PRICE WORK | | | | |
| B02001 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 224.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B021 - MSC SSU B3110 | RECURRING PRICE WORK | | | | |
| B02101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B022 - MESG-1 | RECURRING PRICE WORK | | | | |
| B02201 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 9.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| B023 - VA CLINIC | RECURRING PRICE WORK | | | | | |
| B02301 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| B02302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B024 - FEMA | RECURRING PRICE WORK | | | | | |
| B02401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| B02402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B025 - MCBCB | RECURRING PRICE WORK | | | | |
| B02501 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
RECURRING WORK FIRST OPTION PERIOD TOTAL $ - 0
ELINs-1st Opt Period-IDIQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Price - 1st Option Period (01 Sep 2022 - 31 Aug 2023) | | | | | | |
| NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4 | | | | | | |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Solid Waste Collection and Disposal per Spec Item 4.1 | The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4 | 100.00 | TON | | $ - 0 |
| B701 | Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| B702 | Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| B703 | Recyclables 90 Gallon Container per Spec Item 4.4 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| B704 | Foreign Waste Collection & Disposal per Spec Item 4.5 | The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.4 | 44.00 | EA | | $ - 0 |
| B705 | Mixed Load per Spec Item 4.6 | Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load) | 100.00 | EA | | $ - 0 |
| B706 | Pavement Clearance (Sweeping Services) per Spec Item 4.7 | The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.5 | 10,000.00 | MSF | | $ - 0 |
| B707 | Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8 | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed (NTE) | | | $ 50,000 |
| B708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9 | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,200 | HR (Hour) | | $ - 0 |
| B709 | Overtime Work per Spec Item 4.10 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1 | 800 | HR (Hour) | | $ - 0 |
| | NON-RECURRING WORK FIRST OPTION PERIOD TOTAL | | | | $ |
ELINs -2nd Opt Period-FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring Price - 2nd Option Period (01 Sep 2023 - 31 Aug 2024) | | | | | | |
| RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | U/I | Frequency | Unit Price | Total |
| C001 - JRM/REGION | RECURRING PRICE WORK | | | | | |
| C00101 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 2,899.00 | TON | | | $ - 0 |
| C00102 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 19.00 | EA | | | $ - 0 |
| C00103 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls | 252.00 | HRS | | | $ - 0 |
| C00104 | Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 11.00 | EA | 104 | | $ - 0 |
| C00105 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 12.00 | EA | 104 | | $ - 0 |
| C00106 | Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 9.00 | EA | 52 | | $ - 0 |
| C00107 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 45.00 | EA | 104 | | $ - 0 |
| C00108 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| C00109 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 5.00 | EA | 12 | | $ - 0 |
| C00110 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing) | 110.00 | EA | 52 | | $ - 0 |
| C00111 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED) | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C002 - BSVE (JRM) | RECURRING PRICE WORK | | | | | |
| C00201 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 36 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C003 - CSS-15 (JRM) | RECURRING PRICE WORK | | | | |
| C00301 | Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6 | 400.00 | EA | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C004 - Frank Cable T-shed Funded By JRM | RECURRING PRICE WORK | | | | | |
| C00401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 12.00 | TON | | | $ - 0 |
| C00402 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 52.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C005 - NBG HOUSING | RECURRING PRICE WORK | | | | | |
| C00501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 776.00 | TON | | | $ - 0 |
| C00502 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| C00503 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 879.00 | EA | 52 | | $ - 0 |
| C00504 | Pavement Clearance per Spec Item 3.5 | 2,500.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C006 - BUMED | RECURRING PRICE WORK | | | | | |
| C00601 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 224.00 | TON | | | $ - 0 |
| C00602 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 2.00 | EA | 52 | | $ - 0 |
| C00603 | Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| C00604 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 6 | | $ - 0 |
| C00605 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| C00606 | Pavement Clearance per Spec Item 3.5 | 650.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C007 - DLA (631) DRMO | RECURRING PRICE WORK | | | | | |
| C00701 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 55.00 | TON | | | $ - 0 |
| C00702 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| B008 - DLA (2116 & 2118) DDGM | RECURRING PRICE WORK | | | | | |
| C00801 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 35.00 | TON | | | $ - 0 |
| C00802 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C009 - NAVSUP FLCY GUAM FUELS | RECURRING PRICE WORK | | | | |
| C00901 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 16.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C010 - DECA (CDC) | RECURRING PRICE WORK | | | | | |
| C01001 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 550.00 | TON | | | $ - 0 |
| C01002 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 104 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C011 - DECA OROTE | RECURRING PRICE WORK | | | | | |
| C01101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 268.00 | TON | | | $ - 0 |
| C01102 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 30.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C012 - EODMU-5 | RECURRING PRICE WORK | | | | | |
| C01201 | Pavement Clearance Per Spec 3.5 | 325.00 | MSF | 4 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C013 - DODEA | RECURRING PRICE WORK | | | | | |
| C01301 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 93.00 | TON | | | $ - 0 |
| C01302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C014 - USCG | RECURRING PRICE WORK | | | | | |
| C01401 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 46.00 | TON | | | $ - 0 |
| C01402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C015 - NGIS | RECURRING PRICE WORK | | | | | |
| C01501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 74.80 | TON | | | $ - 0 |
| C01502 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 143.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C016 - NAWMU | RECURRING PRICE WORK | | | | | |
| C01601 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C017 - 30 NCR | RECURRING PRICE WORK | | | | | |
| C01701 | Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load) | 29.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C018 - MSC USNS Ship Support | RECURRING PRICE WORK | | | | | |
| C01801 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 335.00 | TON | | | $ - 0 |
| C01802 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 10.00 | EA | AS NEEDED | | $ - 0 |
| C01803 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 50.00 | EA | AS NEEDED | | $ - 0 |
| C01804 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C019 - MSC Frank Cable | RECURRING PRICE WORK | | | | |
| C01901 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 382.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C020 - MSC Emory Land | RECURRING PRICE WORK | | | | |
| C02001 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 224.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C021 - MSC SSU B3110 | RECURRING PRICE WORK | | | | |
| C02101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C022 - MESG-1 | RECURRING PRICE WORK | | | | |
| C02201 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 9.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| C023 - VA CLINIC | RECURRING PRICE WORK | | | | | |
| C02301 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| C02302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C024 - FEMA | RECURRING PRICE WORK | | | | | |
| C02401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| C02402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| C025 - MCBCB | RECURRING PRICE WORK | | | | |
| C02501 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
RECURRING WORK SECOND OPTION PERIOD TOTAL $ - 0
ELINs-2nd Opt Period-IDIQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 Non-Recurring Price - 2nd Option Period (01 Sep 2023 - 31 Aug 2024) | | | | | | |
| NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4 | | | | | | |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Solid Waste Collection and Disposal per Spec Item 4.1 | The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4 | 100.00 | TON | | $ - 0 |
| C701 | Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| C702 | Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| C703 | Recyclables 90 Gallon Container per Spec Item 4.4 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| C704 | Foreign Waste Collection & Disposal per Spec Item 4.5 | The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.4 | 44.00 | EA | | $ - 0 |
| C705 | Mixed Load per Spec Item 4.6 | Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load) | 100.00 | EA | | $ - 0 |
| C706 | Pavement Clearance (Sweeping Services) per Spec Item 4.7 | The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.5 | 10,000.00 | MSF | | $ - 0 |
| C707 | Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8 | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed (NTE) | | | $ 50,000 |
| C708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9 | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,200 | HR (Hour) | | $ - 0 |
| C709 | Overtime Work per Spec Item 4.10 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1 | 800 | HR (Hour) | | $ - 0 |
| | NON-RECURRING WORK SECOND OPTION PERIOD TOTAL | | | | $ |
ELINs-3rd Opt Period-FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring Price - 3rd Option Period (01 Sep 2024 - 31 Aug 2025) | | | | | | |
| RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | U/I | Frequency | Unit Price | Total |
| D001 - JRM/REGION | RECURRING PRICE WORK | | | | | |
| D00101 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 2,899.00 | TON | | | $ - 0 |
| D00102 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 19.00 | EA | | | $ - 0 |
| D00103 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls | 252.00 | HRS | | | $ - 0 |
| D00104 | Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 11.00 | EA | 104 | | $ - 0 |
| D00105 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 12.00 | EA | 104 | | $ - 0 |
| D00106 | Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 9.00 | EA | 52 | | $ - 0 |
| D00107 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 45.00 | EA | 104 | | $ - 0 |
| D00108 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| D00109 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 5.00 | EA | 12 | | $ - 0 |
| D00110 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing) | 110.00 | EA | 52 | | $ - 0 |
| D00111 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED) | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D002 - BSVE (JRM) | RECURRING PRICE WORK | | | | | |
| D00201 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 36 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D003 - CSS-15 (JRM) | RECURRING PRICE WORK | | | | |
| D00301 | Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6 | 400.00 | EA | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D004 - Frank Cable T-shed Funded By JRM | RECURRING PRICE WORK | | | | | |
| D00401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 12.00 | TON | | | $ - 0 |
| D00402 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 52.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D005 - NBG HOUSING | RECURRING PRICE WORK | | | | | |
| D00501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 776.00 | TON | | | $ - 0 |
| D00502 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| D00503 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 879.00 | EA | 52 | | $ - 0 |
| D00504 | Pavement Clearance per Spec Item 3.5 | 2,500.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D006 - BUMED | RECURRING PRICE WORK | | | | | |
| D00601 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 224.00 | TON | | | $ - 0 |
| D00602 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 2.00 | EA | 52 | | $ - 0 |
| D00603 | Recycling Aluminum, Glass/Bottles, Cardboard, 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| D00604 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 6 | | $ - 0 |
| D00605 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| D00606 | Pavement Clearance per Spec Item 3.5 | 650.00 | MSF | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D007 - DLA (631) DRMO | RECURRING PRICE WORK | | | | | |
| D00701 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 55.00 | TON | | | $ - 0 |
| D00702 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D008 - DLA (2116 & 2118) DDGM | RECURRING PRICE WORK | | | | | |
| D00801 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 35.00 | TON | | | $ - 0 |
| D00802 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D009 - NAVSUP FLCY GUAM FUELS | RECURRING PRICE WORK | | | | |
| D00901 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 16.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D010 - DECA (CDC) | RECURRING PRICE WORK | | | | | |
| D01001 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 550.00 | TON | | | $ - 0 |
| D01002 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 104 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D011 - DECA OROTE | RECURRING PRICE WORK | | | | | |
| D01101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 268.00 | TON | | | $ - 0 |
| D01102 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 30.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D012 - EODMU-5 | RECURRING PRICE WORK | | | | | |
| D01201 | Pavement Clearance Per Spec 3.5 | 325.00 | MSF | 4 | $ - 0 | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D013 - DODEA | RECURRING PRICE WORK | | | | | |
| D01301 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 93.00 | TON | | | $ - 0 |
| D01302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D014 - USCG | RECURRING PRICE WORK | | | | | |
| D01401 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 46.00 | TON | | | $ - 0 |
| D01402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D015 - NGIS | RECURRING PRICE WORK | | | | | |
| D01501 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 74.80 | TON | | | $ - 0 |
| D01502 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 143.00 | EA | 52 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D016 - NAWMU | RECURRING PRICE WORK | | | | | |
| D01601 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 12 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D017 - 30 NCR | RECURRING PRICE WORK | | | | | |
| D01701 | Recycling 20 cy per Spec Item 3.1.2.5; 3.2.7 and 3.4.5 (Mixed Load) | 29.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D018 - MSC USNS Ship Support | RECURRING PRICE WORK | | | | | |
| D01801 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 335.00 | TON | | | $ - 0 |
| D01802 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 10.00 | EA | AS NEEDED | | $ - 0 |
| D01803 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 50.00 | EA | AS NEEDED | | $ - 0 |
| D01804 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2, 3.1.2.2, 3.2.2, and 3.4.2 | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D019 - MSC Frank Cable | RECURRING PRICE WORK | | | | |
| D01901 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 382.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D020 - MSC Emory Land | RECURRING PRICE WORK | | | | |
| D02001 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 224.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D021 - MSC SSU B3110 | RECURRING PRICE WORK | | | | |
| D02101 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D022 - CRG-1 | RECURRING PRICE WORK | | | | |
| D02201 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 9.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| D023 - VA CLINIC | RECURRING PRICE WORK | | | | | |
| D02301 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| D02302 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D024 - FEMA | RECURRING PRICE WORK | | | | | |
| D02401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 7.00 | TON | | | $ - 0 |
| D02402 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 24 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| D025 - MCBG | RECURRING PRICE WORK | | | | |
| D02501 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 15.00 | TON | | $ - 0 |
| | | | Sub-Total | $ - 0 |
RECURRING WORK THIRD OPTION PERIOD TOTAL $ - 0
ELINs-3rd Opt Period-IDIQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 Non-Recurring Price - 3rd Option Period (01 Sep 2024 - 31 Aug 2025) | | | | | | |
| NON-RECURRING - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 4 | | | | | | |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Solid Waste Collection and Disposal per Spec Item 4.1 | The Contractor shall provide labor, material and equipment to perform Solid Waste Collection and Disposal per Spec Item 3.1; 3.2 and 3.4 | 100.00 | TON | | $ - 0 |
| D701 | Recycling 1.5 - 8 Cubic Yard Container per Spec Item 4.2 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| D702 | Recyclables 20 - 40 Cubic Yard Container per Spec Item 4.3 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| D703 | Recyclables 90 Gallon Container per Spec Item 4.4 | Recycling per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 50.00 | EA | | $ - 0 |
| D704 | Foreign Waste Collection & Disposal per Spec Item 4.5 | The Contractor shall provide labor, material and equipment to perform Foreign Waste Collection and Disposal Spec Item 3.1.3 ; 3.2.3 and 3.4.4 | 44.00 | EA | | $ - 0 |
| D705 | Mixed Load per Spec Item 4.6 | Recycling 20 CY Per Spec Item 3.4.5 (Mixed Load) | 100.00 | EA | | $ - 0 |
| D706 | Pavement Clearance (Sweeping Services) per Spec Item 4.7 | The Contractor shall provide labor, material and equipment to perform street sweeping services per Spec Item 3.5 | 10,000.00 | MSF | | $ - 0 |
| D707 | Material Costs - MUST BE NEGOTIATED BY KO per Spec Item 4.8 | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed (NTE) | | | $ 50,000 |
| D708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO per Spec Item 4.9 | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,200 | HR (Hour) | | $ - 0 |
| D709 | Overtime Work per Spec Item 4.10 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls per Spec Items 2.6.1 | 800 | HR (Hour) | | $ - 0 |
| | NON-RECURRING WORK THIRD OPTION PERIOD TOTAL | | | | $ |
ELINs-4th Opt Period-FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-21-R-9100 |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 Recurring Price - 4th Option Period (01 Sep 2025 - 31 Aug 2026) | | | | | | |
| RECURRING PRICE - IN ACCORDANCE WITH SECTION C, ANNEX 1503030, SPEC ITEM 3 | | | | | | |
| ELIN / Sub ELIN | Description | Quantity | U/I | Frequency | Unit Price | Total |
| E001 - JRM/REGION | RECURRING PRICE WORK | | | | | |
| E00101 | Solid Waste Collection and Disposal per Spec Item 3.1; 3.2, 3.3, and 3.4. ONLY tonnage for refuse and not to include segregated recyclable material. | 2,899.00 | TON | | | $ - 0 |
| E00102 | Foreign Waste Collection and Disposal per Spec Item 3.1.2.4, 3.2.3, and 3.4.4 | 19.00 | EA | | | $ - 0 |
| E00103 | Overtime for Solid Waste Collection & Landfill Services for Sundays and holidays and after normal working hours for unscheduled service calls | 252.00 | HRS | | | $ - 0 |
| E00104 | Recycling Aluminum 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 11.00 | EA | 104 | | $ - 0 |
| E00105 | Recycling Plastic 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 12.00 | EA | 104 | | $ - 0 |
| E00106 | Recycling Glass/Bottles 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 9.00 | EA | 52 | | $ - 0 |
| E00107 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 45.00 | EA | 104 | | $ - 0 |
| E00108 | Recycling Cardboard 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 3.00 | EA | 52 | | $ - 0 |
| E00109 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 5.00 | EA | 12 | | $ - 0 |
| E00110 | Recycling 90 gallon per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (Unaccompanied Housing) | 110.00 | EA | 52 | | $ - 0 |
| E00111 | Recycling Metal 20 - 40 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 (AS NEEDED) | 20.00 | EA | AS NEEDED | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| E002 - BSVE (JRM) | RECURRING PRICE WORK | | | | | |
| E00201 | Recycling Cardboard 1.5 - 8 cy per Spec Item 3.1.1.2; 3.1.2.2; 3.2.2 and 3.4.2 | 1.00 | EA | 36 | | $ - 0 |
| | | | | Sub-Total | $ - 0 |
| E003 - CSS-15 (JRM) | RECURRING PRICE WORK | | | | |
| E00301 | Trash Disposal Unit (TDU) Canister Opening per Spec Item 3.1.2.6 and 3.2.6 | 400.00 | EA | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| E004 - Frank Cable T-shed Funded By JRM | RECURRING PRICE WORK | | | | | |
| E00401 | Solid Waste Collection and Disposal per Spec Item 3.1, 3.2, 3.3, and 3.4 | 12.00 | TON | | | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.