This document is a demolition specification diagram for the AMRAAM Breakroom Renovation Project. The diagram illustrates a loading dock area and identifies five specific demolition tasks to be completed during the project's preparation phase. The work includes removal of a 240V electrical box and conduit, removal of a 120V switch and conduit, removal of two runs of conduit from the wall, painting of a metal platform, and removal of an old security camera along with its mount and wiring. The specifications are presented as a floor plan with labeled arrows indicating the location and scope of each demolition item, providing contractors with a clear visual reference for the work to be performed in the breakroom renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOADING DOCK

Remove 240V Box and Conduit

Remove 120V Switch and Conduit

Remove 2 runs Conduit on from wall

Paint Metal Platform

Attachment 1 - AMRAAM Breakroom Renovation Project, Demolition

Remove old security camera, mount and wiring