This document is a demolition specification diagram for the AMRAAM Breakroom Renovation Project. The diagram illustrates a loading dock area and identifies five specific demolition tasks to be completed during the project's preparation phase. The work includes removal of a 240V electrical box and conduit, removal of a 120V switch and conduit, removal of two runs of conduit from the wall, painting of a metal platform, and removal of an old security camera along with its mount and wiring. The specifications are presented as a floor plan with labeled arrows indicating the location and scope of each demolition item, providing contractors with a clear visual reference for the work to be performed in the breakroom renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOADING DOCK
Remove 240V Box and Conduit
Remove 120V Switch and Conduit
Remove 2 runs Conduit on from wall
Paint Metal Platform
Attachment 1 - AMRAAM Breakroom Renovation Project, Demolition
Remove old security camera, mount and wiring
Slide Number 1