At11_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- GAOA BAR ISLAND DAM RECONSTRUCTION
- Solicitation number
- 140L0626R0006
About this file
This is a Limitations on Subcontracting Breakout template for a small business set-aside contract (Solicitation Number 140L0625R0012). The template is designed to track compliance with FAR 52.219-14(e)(3) or (4) requirements, which mandate that contractors perform a minimum of 15% of total labor costs with their own workforce. The spreadsheet structure requires contractors to itemize total contract amount (comprising material costs and labor costs), detail self-performed labor, and separately track payments to small business subcontractors (SSS) and large business subcontractors (LBS) across up to six vendors each. The limitation on subcontracting percentage is calculated as (Total Labor Cost minus Total Amount Paid to LBS Companies) divided by Total Labor Cost, and this percentage must exceed the required 15% self-performance threshold for compliance.
The template includes provisions for material costs (which encompass special tooling, special testing equipment, and construction equipment) and specifies that only first-tier subcontractors qualifying as small businesses under the solicitation's NAICS code count toward SSS calculations, with all second-tier subcontractors classified as LBS labor. The file contains tabs for different service categories (services except construction, general construction, and construction by special trade contractors), allowing contractors to apply the appropriate compliance calculations based on their contract type. This template is utilized for proposals under the Department of the Interior Bureau of Land Management, including the GAOA Bar Island Dam Reconstruction project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| At5_RFI_Responses_AM03_26May_0003.pdf | ||
| Sol_140L0626R0006_Amd_0003.pdf | ||
| At4_WD_MT20260076_18May26_0002.pdf | ||
| At6_ACOE_NWP3_0002.pdf | ||
| 26R0006_ContPages_AM02_22May_0002.pdf | ||
| At5_RFI_Responses_AM02_22May_0002.pdf | ||
| Sol_140L0626R0006_Amd_0002.pdf | ||
| 26R0006_SiteVisit_SignInSheet_0001.pdf | ||
| At05_RFI_Responses_AM01_0001.pdf | ||
| 26R0006_ContPages_AM01_7May_0001.pdf | ||
| Sol_140L0626R0006_Amd_0001.pdf | ||
| At12_Experience_ProjectDataSheet_Const.docx | DOCX document | |
| Sol_140L0626R0006.pdf | ||
| At13_140L0626R0006_Past_Perf_Questionnaire.docx | DOCX document | |
| At04_WD_MT202060076_2Jan26.pdf | ||
| At14_RFI_Form.docx | DOCX document | |
| At10_PriceSchedule.xlsx | XLSX spreadsheet | |
| At03_ConstructionWorkspaces.pdf | ||
| At02_Specifications_Jan26.pdf | ||
| At01_Drawings_22Dec25.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0625R0012 |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |