At03_ConstructionWorkspaces.pdf
PDF 961 KB Posted
- Attached to
- GAOA BAR ISLAND DAM RECONSTRUCTION
- Solicitation number
- 140L0626R0006
About this file
This document is an aerial map depicting the construction work spaces for the Bar Island Dam Reconstruction project managed by the Bureau of Land Management Malta Field Office in Montana. The map shows three primary designated areas overlaid on satellite imagery of the surrounding terrain: estimated construction work spaces (indicated in tan/orange), an estimated temporary water storage pond (shown in blue), and an estimated borrow location (outlined in tan). The project site is located within an Environmental Assessment (EA) review area, marked by red dashed lines on the map. The document includes a legend identifying BLM land, the construction work spaces, temporary water storage facilities, and borrow locations, along with a scale bar for geographic reference. This appears to be a planning and environmental documentation map used to identify the spatial extent and configuration of construction activities, material sourcing areas, and temporary infrastructure required for the dam reconstruction initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| At5_RFI_Responses_AM03_26May_0003.pdf | ||
| Sol_140L0626R0006_Amd_0003.pdf | ||
| At4_WD_MT20260076_18May26_0002.pdf | ||
| At6_ACOE_NWP3_0002.pdf | ||
| 26R0006_ContPages_AM02_22May_0002.pdf | ||
| At5_RFI_Responses_AM02_22May_0002.pdf | ||
| Sol_140L0626R0006_Amd_0002.pdf | ||
| 26R0006_SiteVisit_SignInSheet_0001.pdf | ||
| At05_RFI_Responses_AM01_0001.pdf | ||
| 26R0006_ContPages_AM01_7May_0001.pdf | ||
| Sol_140L0626R0006_Amd_0001.pdf | ||
| At12_Experience_ProjectDataSheet_Const.docx | DOCX document | |
| Sol_140L0626R0006.pdf | ||
| At13_140L0626R0006_Past_Perf_Questionnaire.docx | DOCX document | |
| At04_WD_MT202060076_2Jan26.pdf | ||
| At14_RFI_Form.docx | DOCX document | |
| At11_Lim_on_SubK_Breakout.xlsx | XLSX spreadsheet | |
| At10_PriceSchedule.xlsx | XLSX spreadsheet | |
| At02_Specifications_Jan26.pdf | ||
| At01_Drawings_22Dec25.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
,c •
..Y
·j.-· . .... • • t
� l • •
" . . t ··•
-!I! ,.
I:. • •
·1 • • • .. .,, .. ;� • ,t ' '
�BLM
� ESTIMATED CONSTRUCTION WORK SPACES - - EA REVIEW AREA
� ESTIMATED TEMPORARY WATER STORAGE POND
� ESTIMATEDBORROWLOCATION
• .. • • •, .. • • ,\.!j .... � c•
• •• ? ,( .. • 3, L _/
,1
'l,,;, .... • •
UNITID STATES DEPARlMENT OF THE INTERIOR
BUREAU OF LAND w.NAGEl.!ENT i
: t .• •
CONSTRUCTION WORK SPACES
BAR ISLAND DAM RECONSTRUCTION
MALTA FlELD OFFlCE MONTANA l
File details come from the government source that posted it. Updated .