At10_PriceSchedule.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
GAOA BAR ISLAND DAM RECONSTRUCTION
Solicitation number
140L0626R0006
Issued by

About this file

This is a price schedule (bid schedule) for the Bar Island Dam Reconstruction project under GAOA funding, managed by the Department of the Interior Bureau of Land Management. The schedule itemizes 21 base line items and one optional item for which bidders must provide unit prices and total prices.

The base work scope includes mobilization and preparatory work, site clearing and restoration, demolition of the existing primary spillway, and excavation of approximately 35,000 cubic yards of common excavation and 2,700 cubic yards of muck excavation. The project requires construction of compacted embankment (32,000 cubic yards), lime-amended embankment (2,150 cubic yards), filter sand (780 cubic yards), and drain gravel (350 cubic yards). Additional items include installation of an 18-inch CMP culvert (27 linear feet), primary spillway riser and inlet structure, primary spillway conduit, stilling basin, toe drain, class 1 riprap slope protection (240 tons), water control and dewatering, stabilization fabric (2,000 square yards), and filter fabric (400 square yards). The optional item includes spillway armoring. All item prices are fully burdened and must include overhead, profit, and bond costs, with bidders required to specify their respective overhead, profit, and bond rates. Quantities noted are not guaranteed, with measurement and payment defined separately in the contract documents.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BarIsland BidSched

BAR ISLAND DAM RECONSTRUCTION
SCHEDULE OF ITEMS
Item
No.DescriptionQuantity*0Unit PriceTotal Price**
1Mobilization and Preparatory Work1LS$0.00
2Site Clearing and Restoration1LS$0.00
3Existing Primary Spillway Demolition1LS$0.00
4Common Excavation35,000CY$0.00
5Muck Excavation2,700CY$0.00
6Compacted Embankment32,000CY$0.00
7Lime Amended Embankment2,150CY$0.00
8Filter Sand780CY$0.00
9Drain Gravel350CY$0.00
10Road Gravel280TON$0.00
1118" CMP Culvert27LF$0.00
12Primary Spillway Riser and Inlet Structure1LS
13Primary Spillway Conduit1LS
14Stilling Basin1LS
15Toe Drain1LS
16New Class 1 Riprap Slope Protection240Ton
17Water Control/Dewatering1LS
18Stabilization Fabric2,000SY
19Filter Fabric400SY$0.00
20General Construction Operations1LS$0.00
BASE PRICE$0.00
OPTION(S)
21Spillway Armoring1LS
OPTION(S) PRICE

TOTAL PRICE (BASE + OPTION(S))

Rate***
Overhead%
Profit%
Bonds%
*Quantities are not guaranteed. Measurement and payment for each Item is defined in Section 01150, Measurement and Payment.
** Total Price for each Item is fully burdened and includes Overhead, Profit, and Bond.
*** Overhead, Profit, and Bond rates used in the total price to be provided.