The file's text, extracted by GovTribe without its formatting.
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. | |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
11 Snowbird Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 11 Snowbird Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
12 Railroad Whistle Ln.
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 12 Rail Road Whistle Lane |
| PROJECT #: | 12 | CITY: | Green Mountain |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
19 Deneen Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 19 Deneen Road |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
19 Hill Crest Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 19 Hill Crest Lane |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
20 Snowbird Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 20 Snowbird Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
31 Coxes Creek Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 31 Coxes Creek Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
34 Shady Brook Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 34 Shady Brook Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
35 Roland St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 35 Roland St |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
43 Mountain Farm Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 43 Mountain Farm Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
44 Deer Trail Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 44 Deer Trail Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
45 Hill Crest Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 45 Hill Crest Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
50 Boone Branch Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 50 Boone Branch Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
53 Shady Brook Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 53 Shady Brook Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
59 Sky View Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 59 Sky View Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
77 Truckers Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 77 Truckers Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
80 Hill Crest Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 80 Hill Crest Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
90 Sky View Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 90 Sky View Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
101 Mountain Farm Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 101 Mountain Farm Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
129 A F Simmons Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 129 A F Simmons Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
130 Courage Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 130 Courage Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
193 Morning View Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 193 Morning View Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
198 Settlers Ridge Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 198 Settlers Ridge Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
205 Sully Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 205 Sully Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
250 Miners Ridge Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 250 Miners Ridge Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
264 Sledrunner Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 264 Sledrunner Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
286 Morning View Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 286 Morning View Dr |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
295 Brookwood Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 295 Brookwood Ln |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
314 Tennis Court Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 314 Tennis Court Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
359 Shull Farm Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 359 Shull Farm Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
362 Riverwood Dr E
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 362 Riverwood Dr E |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
380 Riverwood Dr E
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 380 Riverwood Dr E |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
410 Tennis Court Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 410 Tennis Court Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
436 N Fork Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 436 N Fork Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
460 Broadstone Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 460 Broadstone Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
461 Deep Gap Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 461 Deep Gap Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
524 Monroe King Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 524 Monroe King Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
600 Phillips Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 600 Phillips Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
828 Rock Creek Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 828 Rock Creek Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
846 Shull Farm Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 846 Shull Farm Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
1113 Charlie Brown Cir
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 1113 Charlie Brown Cir |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
1174 Clearmont School
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 1174 Clearmont School Rd |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
4075 US Hwy 19 E
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | | | |
| STORM #: | 4827 | STREET ADDRESS: | 4075 US Hwy 19 E | | |
| PROJECT #: | 12 | CITY: | Burnsville | | |
| | | | Commerical | |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7010 Crabtree Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 7010 Crabtree Rd |
| PROJECT #: | 12 | CITY: | Spruce Pine |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
8814 US Hwy 19 W
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 8814 US Hwy 19 W |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
12771 US Hwy 19 W
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 12771 US Hwy 19 W |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
5475 US Hwy 19 E
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | | | |
| STORM #: | 4827 | STREET ADDRESS: | 5475 US Hwy 19 E | | |
| PROJECT #: | 12 | CITY: | Burnsville | | |
| | | | Commerical and home | |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option- 20 Deneen Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 20 Deneen Road |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option-32 Deep Gap Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 32 Deep Gap Road |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option- 34 Cherokee Lane
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 34 Cherokee Lane |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option-363 Winter Star Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 363 Winter Star Road |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option-364 Winter Star Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 364 Winter Star Road |
| PROJECT #: | 12 | CITY: | Burnsville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
Option-441 Little Creek Road
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 441 Little Creek Road |
| PROJECT #: | 12 | CITY: | Burnsville |
This is the start of the file's text. The full file is on GovTribe.