This document provides details for a federal contract opportunity to upgrade communication facilities and infrastructure at Aviano Air Base in Italy. The project involves demolitions, excavations, mechanical, electrical, and construction work across multiple buildings. Interested vendors must have an active System for Award Management registration and an Italian Statement of Authorization certification in category OG11. The estimated value is between $1 million and $5 million. A mandatory site visit will be scheduled in February 2023 at the air base contractor gate. Proposals are due in February 2023. The work will be performed in Italy according to Defense Federal Acquisition Regulation Supplement clauses and requires compliance with Italian health and safety law. This is a firm-fixed-price contract to deliver a complete, functioning project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AVIANO MASTERSPECS 2020.pdf | ||
| ASHE 21-2001 PSC.pdf | ||
| ASHE 21-2001_Tech Specs Jan 23.pdf | ||
| ASHE 21-2001_Dwgs 73-135.pdf | ||
| ASHE 21-2001_Dwgs 1-72.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| UPGRADE COMM FACILITIES AND INFRASTRUCTURE - BLDG 1442 | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||||||
| ASHE 21-2001 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||||||
| A | BUILDING 1442 - ICC BUILDING | ||||||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||||||
| Ic Civil Demolitions - Ic Demolizioni Civili | |||||||||||||||||
| 1 | DEMOLITION OF BITUMINOUS CNC PAVEMENT | ||||||||||||||||
| Demolizione di pavimentazione in congloimerato bituminoso | IT. No. Art. n. | 1 | Sq.m/Mq | 56.00 | |||||||||||||
| 2 | EXCAVATIONS ON EARTH | ||||||||||||||||
| Scavo su terreno | IT. No. Art. n. | 2 | Sq.m/Mq | 32.00 | |||||||||||||
| 3 | CONCRETE PAVEMENT DEMOLITION | ||||||||||||||||
| Demolizione di pavimentazione in calcestruzzo | IT. No. Art. n. | 3 | Sq.m/Mq | 4.00 | |||||||||||||
| 4 | TRENCH EXCAVATAION ON BITIMINOUS PAVEMENT | ||||||||||||||||
| Scavo in trince su pavimentazione in cong. Bituminoso | IT. No. Art. n. | 4 | Cu.m/Mc | 15.60 | |||||||||||||
| 5 | MILLING OF WEARING COURSE | ||||||||||||||||
| Scarifica strato di usura | IT. No. Art. n. | 5 | Sq.m/Mq | 110.00 | |||||||||||||
| 6 | REMOVAL OF DRAINAGE PIPES | ||||||||||||||||
| Rimozione di tubazioni acque meteoriche | IT. No. Art. n. | 6 | Lm/Ml | 17.00 | |||||||||||||
| Total Civil - Totale Civile | |||||||||||||||||
| Id Mechanical Demolitions - Id Demolizioni Meccaniche | |||||||||||||||||
| 7 | REMOVAL OF PORTABLE AIR CONDITIONER | ||||||||||||||||
| Rimozione di condizionatore d'aria portatle | IT. No. Art. n. | 7 | LS/AC | 0.00 | |||||||||||||
| Total Mechanical - Totale Meccanico | |||||||||||||||||
| Ie Electrical Demolitions - Ia Demolizioni Elettriche | |||||||||||||||||
| 8 | REMOVE UPS AND BATTERTY CABINET 1 | ||||||||||||||||
| Rimozione di UPS e Quadro Batterie 1 | IT. No. Art. n. | 8 | LS/AC | 1.00 | |||||||||||||
| 9 | REMOVE UPS AND BATTERTY CABINET 2 | ||||||||||||||||
| Rimozione di UPS e Quadro Batterie 2 | IT. No. Art. n. | 9 | LS/AC | 1.00 | |||||||||||||
| 10 | REMOVE PARALLEL CABINET | ||||||||||||||||
| Rimozione QuadrParallelo | IT. No. Art. n. | 10 | LS/AC | 1.00 | |||||||||||||
| 11 | REMOVE BY PASS PANEL | ||||||||||||||||
| Rimozione QuadrParallelo | IT. No. Art. n. | 11 | LS/AC | 1.00 | |||||||||||||
| 12 | REMOVE ESS PANEL | ||||||||||||||||
| Rimozione Quadro ESS | IT. No. Art. n. | 12 | LS/AC | 1.00 | |||||||||||||
| 13 | REMOVE FUEL TANK | ||||||||||||||||
| Rimozione Serbatoio | IT. No. Art. n. | 13 | LS/AC | 1.00 | |||||||||||||
| 14 | REMOVE MISCELLANEOUS ELECTRICAL EQUIPMENT | ||||||||||||||||
| Rimozione di varie apparecchiature elettriche | IT. No. Art. n. | 14 | LS/AC | 1.00 | |||||||||||||
| Total Electrical - Totale Elettrico | |||||||||||||||||
| TOTAL PART I / Totale Parte I | |||||||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||||||
| 15 | 10cm THICK INDUSTRIAL TYPE FLOOR PAVEMENT | ||||||||||||||||
| Pavimento tipo industriale, spessore 10cm | IT. No. Art. n. | 1 | Sq.m/Mq | 31.00 | |||||||||||||
| 16 | ROOFING SYSTEM | ||||||||||||||||
| Pacchetto di copertura | IT. No. Art. n. | 2 | Sq.m/Mq | 45.00 | |||||||||||||
| 17 | EXTERIOR PLASTER | ||||||||||||||||
| Intonaco per esterni | IT. No. Art. n. | 3 | Sq.m/Mq | 63.00 | |||||||||||||
| 18 | PRECAST CONCRETE ROSETTE | ||||||||||||||||
| Rosone in cls prefabbricato | IT. No. Art. n. | 4 | EA/NO | 2.00 | |||||||||||||
| 19 | PAINT EXTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici esterne | IT. No. Art. n. | 5 | Sq.m/Mq | 72.50 | |||||||||||||
| 20 | PAINT INTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici interne | IT. No. Art. n. | 6 | Sq.m/Mq | 98.50 | |||||||||||||
| 21 | MARBLE SILLS AND THRESHOLDS | ||||||||||||||||
| Soglie e davanzali | IT. No. Art. n. | 7 | Lm/Ml | 2.20 | |||||||||||||
| 22 | BASEBOARD | ||||||||||||||||
| Battiscopa | IT. No. Art. n. | 8 | Lm/Ml | 22.20 | |||||||||||||
| 23 | STEEL LOUVERS | ||||||||||||||||
| Griglie di aerazione in acciaio | IT. No. Art. n. | 9 | EA/NO | 2.00 | |||||||||||||
| 24 | STEEL DOORS, D1 Type | ||||||||||||||||
| Porta in acciaio tipo D1 | IT. No. Art. n. | 10 | EA/NO | 1.00 | |||||||||||||
| 25 | FLASHINGS | ||||||||||||||||
| Scossaline | IT. No. Art. n. | 11 | Lm/Ml | 26.50 | |||||||||||||
| 26 | DOWNSPOUTS | ||||||||||||||||
| Pluviali | IT. No. Art. n. | 12 | Lm/Ml | 7.50 | |||||||||||||
| 27 | GUTTERS | ||||||||||||||||
| Gronda | IT. No. Art. n. | 13 | Lm/Ml | 12.60 | |||||||||||||
| 28 | FALL PROTECTION SYSTEM | ||||||||||||||||
| Dispositivo anticaduta | IT. No. Art. n. | 14 | Ls/Ac | 1.00 | |||||||||||||
| 29 | SUSPENDED CEILING PANELS REMOVAL, STORE AND REINSTALLATION | ||||||||||||||||
| Rimozione, accantonamento e reinstallazione di pannelli controsoffitto | IT. No. Art. n. | 15 | Sq.m/Mq | 200.00 | |||||||||||||
| 30 | MASONRY WORK ASSISTANCE - SLOTS | ||||||||||||||||
| Assistenza opere murarie - Asole | IT. No. Art. n. | 16a | Ls/Ac | 1.00 | |||||||||||||
| 31 | MASONRY WORK ASSISTANCE - FIRE RATED SEALINGS | ||||||||||||||||
| Assistenza opere murarie - Sigillature REI | IT. No. Art. n. | 16b | Ls/Ac | 1.00 | |||||||||||||
| 32 | MASONRY WORK ASSISTANCE - PIPE CROSSING | ||||||||||||||||
| Assistenza opere murarie - Attraversamento tubazioni | IT. No. Art. n. | 16c | Ls/Ac | 1.00 | |||||||||||||
| 33 | MASONRY WORK ASSISTANCE - LOUVER OPENING | ||||||||||||||||
| Assistenza opere murarie - Apertura griglie | IT. No. Art. n. | 16d | Ls/Ac | 1.00 | |||||||||||||
| 34 | MASONRY WORK ASSISTANCE - ENCASEMENT | ||||||||||||||||
| Assistenza opere murarie - Tracantone | IT. No. Art. n. | 16e | Ls/Ac | 1.00 | |||||||||||||
| Total Architectural - Totale Architettura | |||||||||||||||||
| IIb Structural - IIb Strutturale | |||||||||||||||||
| 35 | PLINTH - C16/20 LEAN CONCRETE | ||||||||||||||||
| Plinti - Calcestruzzo MAGRO C16/20 | IT. No. Art. n. | 17a | Cu.m/Mc | 1.00 | |||||||||||||
| 36 | PLINTHS - FORMWORKS | ||||||||||||||||
| Plinti - Casseforme | IT. No. Art. n. | 17b | Sq.m/Mq | 8.00 | |||||||||||||
| 37 | PLINTHS - B450C STEEL | ||||||||||||||||
| Plinti - Acciaio B450C | IT. No. Art. n. | 17c | Kg/Kg | 250.00 | |||||||||||||
| 38 | PLINTHS - C28/35 CONCRETE | ||||||||||||||||
| Plinti - Calcestruzzo C28/35 | IT. No. Art. n. | 17d | Cu.m/Mc | 2.50 | |||||||||||||
| 39 | PLINTHS - WATERPROOFING | ||||||||||||||||
| Plinti - Impermeabilizzazione | IT. No. Art. n. | 17e | Sq.m/Mq | 110.00 | |||||||||||||
| 40 | COLUMNS - FORMWORKS | ||||||||||||||||
| Pilastri - Casseforme | IT. No. Art. n. | 18a | Sq.m/Mq | 10.50 | |||||||||||||
| 41 | COLUMNS - B450 STEEL | ||||||||||||||||
| Pilastri - Acciaio B450C | IT. No. Art. n. | 18b | Kg/Kg | 130.00 | |||||||||||||
| 42 | COLUMNS - C28/35 CONCRETE | ||||||||||||||||
| Pilastri - Calcestruzzo C28/35 | IT. No. Art. n. | 18c | Cu.m/Mc | 1.50 | |||||||||||||
| 43 | CONCRETE BEAMS - FORMWORKS | ||||||||||||||||
| Travi in cls - Casseforme | IT. No. Art. n. | 19a | Sq.m/Mq | 25.00 | |||||||||||||
| 44 | CONCRETE BEAMS - B450 STEEL | ||||||||||||||||
| Travi in cls - Acciaio B450C | IT. No. Art. n. | 19b | Kg/Kg | 380.00 | |||||||||||||
| 45 | CONCRETE BEAMS - C28/35 CONCRETE | ||||||||||||||||
| Travi in cls - Calcestruzzo C28/35 | IT. No. Art. n. | 19c | Cu.m/Mc | 3.80 | |||||||||||||
| 46 | CONCRETE WALLS - FORMWORKS | ||||||||||||||||
| pareti in cls - Casseforme | IT. No. Art. n. | 20a | Sq.m/Mq | 81.20 | |||||||||||||
| 47 | CONCRETE WALLS - B450 STEEL | ||||||||||||||||
| pareti in cls - Acciaio B450C | IT. No. Art. n. | 20b | Kg/Kg | 2,000.00 | |||||||||||||
| 48 | CONCRETE WALLS - C28/35 CONCRETE | ||||||||||||||||
| pareti in cls - Calcestruzzo C28/35 | IT. No. Art. n. | 20c | Cu.m/Mc | 20.00 | |||||||||||||
| 49 | H24 (4+16+4) PREDALLE ROOF SLAB | ||||||||||||||||
| Solaio copertura tipo predalle, H24 (4+16+4) | IT. No. Art. n. | 21a | Sq.m/Mq | 41.60 | |||||||||||||
| 50 | H30 (4+22+4) PREDALLE FLOOR SLAB | ||||||||||||||||
| Solaio tipo predalle, H30 (4+22+4) | IT. No. Art. n. | 21b | Sq.m/Mq | 31.00 | |||||||||||||
| 51 | TESTING OF THE STRUCTURE | ||||||||||||||||
| Collaudo della struttura | IT. No. Art. n. | 22 | Ls/Ac | 1.00 | |||||||||||||
| Total Structural - Totale Structural | 0.00 | ||||||||||||||||
| IIc Civil - IIc Civile | |||||||||||||||||
| 52 | REINFORCED CONCRETE PAVEMENT, 20cm THICK | ||||||||||||||||
| Marciapiedi in calcestruzzo armato, SP=20cm | IT. No. Art. n. | 23 | Sq.m/Mq | 80.00 | |||||||||||||
| 53 | BITUMINOUS CONCRETE PAVEMENT | ||||||||||||||||
| pavimentazione in conclomerato bituminoso | IT. No. Art. n. | 24 | Sq.m/Mq | 22.00 | |||||||||||||
| 54 | 3cm THICK WEARING COURSE | ||||||||||||||||
| Tappetino di usura, SP=3cm | IT. No. Art. n. | 25 | Sq.m/Mq | 110.00 | |||||||||||||
| 55 | SN4 PVC PIPES FOR DRAINAGE SYSTEM - DN125 | ||||||||||||||||
| Tubi in PVC classe SN4 impianto di drenaggio - DN125 | IT. No. Art. n. | 26a | Lm/Ml | 12.00 | |||||||||||||
| 56 | SN4 PVC PIPES FOR DRAINAGE SYSTEM - DN160 | ||||||||||||||||
| Tubi in PVC classe SN4 impianto di drenaggio - DN160 | IT. No. Art. n. | 26b | Lm/Ml | 7.00 | |||||||||||||
| 57 | SN4 PVC PIPES FOR DRAINAGE SYSTEM - DN200 | ||||||||||||||||
| Tubi in PVC classe SN4 impianto di drenaggio - DN200 | IT. No. Art. n. | 26c | Lm/Ml | 11.00 | |||||||||||||
| 58 | 50x50 cm CONCRETE PIT INCL. D400 CAST IRON COVER | ||||||||||||||||
| Pozzetto di cls 50x50 cm incluso chiusino in ghisa D400 | IT. No. Art. n. | 27.28 | EA/NO | 7.00 | |||||||||||||
| 59 | EXISTING UNDERGROUND UTILITIES RE-ROUTING | ||||||||||||||||
| Ricollocamento utenze interrate esistenti | IT. No. Art. n. | 28 | Ls/Ac | 1.00 | |||||||||||||
| 60 | NEW CHILLER UNIT YARD | ||||||||||||||||
| Nuova area tecnica chiller | IT. No. Art. n. | 29 | Ls/Ac | 1.00 | |||||||||||||
| Total Civil - Totale Civile | |||||||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||||||
| IIIa - HVAC System /IIIa - Imp. HVAC | |||||||||||||||||
| 61 | NEW WATER CHILLER 120KW COOLING CAPACITY : CH-3 | ||||||||||||||||
| nuovo chiller di 120kW di potenza frigorifera: CH-3 | IT. No. Art. n. | 1 | EA/NO | 1.00 | |||||||||||||
| 62 | NEW CHILLED AND HOT WATER PIPELINES WITH EQPM | ||||||||||||||||
| Nuove tubazioni accqua calda e refrigerata con dispositivi in linea | IT. No. Art. n. | 2 | LS/AC | 1.00 | |||||||||||||
| 63 | NEW CH-3 MAKE-UP PIPELINES FROM BOILER ROOM | ||||||||||||||||
| Linea di riempimento per CH-3 a partire dalla centrale termica | IT. No. Art. n. | 3 | LS/AC | 1.00 | |||||||||||||
| 64 | NEW "IN ROW" DX AIR CONDITIONERS: PDXU-2N + EU | ||||||||||||||||
| Nuovi condizionatori "in row" DX: PDXU-2N + EU | IT. No. Art. n. | 4a | EA/NO | 1.00 | |||||||||||||
| 65 | NEW "IN ROW" DX AIR CONDITIONERS: PDXU-4 + EU | ||||||||||||||||
| Nuovi condizionatori "in row" DX: PDXU-4 + EU | IT. No. Art. n. | 4b | EA/NO | 1.00 | |||||||||||||
| 66 | NEW MONO-SPLIT AIR CONDITIONERS FOR ROOM 174 | ||||||||||||||||
| Nuovi condizionatori mono-split per il locale 174 | IT. No. Art. n. | 5 | EA/NO | 2.00 | |||||||||||||
| 67 | NEW ROOM OVERPRESSURE MONITORING SYSTEM | ||||||||||||||||
| Nuovo sistema di monitoraggio della sovrapressione dei locali | IT. No. Art. n. | 6 | EA/NO | 3.00 | |||||||||||||
| 68 | NEW ROOM TEMP/HUMIDITY MONITORING SYSTEM | ||||||||||||||||
| Nuovo sistema di monitoraggio della temperat./umidità dei locali | IT. No. Art. n. | 7 | EA/NO | 4.00 | |||||||||||||
| 69 | NEW LEAK DETECTION & MONITORNG SYSTEM : ROOM#128 | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite : Room#128 | IT. No. Art. n. | 8a | EA/NO | 1.00 | |||||||||||||
| 70 | NEW LEAK DETECTION & MONITORNG SYSTEM : ROOM#224 | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite : Room#224 | IT. No. Art. n. | 8b | EA/NO | 1.00 | |||||||||||||
| 71 | NEW LEAK DETECTION & MONITORNG SYSTEM : ROOM#225 | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite : Room#225 | IT. No. Art. n. | 8c | EA/NO | 1.00 | |||||||||||||
| 72 | NEW LEAK DETECTION & MONITORNG SYSTEM : ROOM#174 | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite : Room#174 | IT. No. Art. n. | 8d | EA/NO | 1.00 | |||||||||||||
| 73 | RS485 MODBUS CARD FOR EXISTING UNIT : ROOM#128 | ||||||||||||||||
| Scheda MODbus su RS485 per unità esistenti : Room#128 | IT. No. Art. n. | 9a | EA/NO | 3.00 | |||||||||||||
| 74 | RS485 MODBUS CARD FOR EXISTING UNIT : ROOM#224 | ||||||||||||||||
| Scheda MODbus su RS485 per unità esistenti : Room#224 | IT. No. Art. n. | 9b | EA/NO | 3.00 | |||||||||||||
| 75 | RS485 MODBUS CARD FOR EXISTING UNIT : ROOM#225 | ||||||||||||||||
| Scheda MODbus su RS485 per unità esistenti : Room#225 | IT. No. Art. n. | 9c | EA/NO | 3.00 | |||||||||||||
| 76 | NEW ROOM CONTROL SYSTEM | ||||||||||||||||
| Nuovo sistema di regolazione e controllo ambienti | IT. No. Art. n. | 10 | LS/AC | 1.00 | Pipe | valve | leak det | acc | |||||||||
| 77 | FUEL FEEDING SYSTEM FOR ELECTRIC GENERATOR | ||||||||||||||||
| Sistema di alimentazione del gasolio per il generatore elettirco | IT. No. Art. n. | 11 | LS/AC | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| 78 | MOTORIZED AIR DAMPER FOR ELECTIRC GENERATOR | ||||||||||||||||
| Serrande aria motorizzate per il generatore elettrico | IT. No. Art. n. | 12 | LS/AC | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| 79 | ELECTRIC UNIT HEATER - UH-EG - WITH ROOM TERMOSTAT | ||||||||||||||||
| Aerotermo elettrico - UH-EG - con termostato ambiente | IT. No. Art. n. | 13 | EA/NO | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| 80 | GENERATOR ROOM VENTILATION SYSTEM | ||||||||||||||||
| Sistema di ventilazione locale generatore | IT. No. Art. n. | 14 | LS/AC | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| 81 | UPS VENTILATION SYSTEM MONITORING | ||||||||||||||||
| Monitoraggio operatività del sistema di ventilazione locale UPS | IT. No. Art. n. | 15 | LS/AC | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| TOTAL HVAC / Totale HVAC | |||||||||||||||||
| IIIb - Fire Existinguishing system /IIIb - Imp. di Estinzione Incendio | |||||||||||||||||
| 82 | NEW NOVEC 1230 EXTINGUISHING SYSTEM (No.4 ROOMS) | ||||||||||||||||
| Nuovo impianto di estinziona a gas Novec 1230 (N.4 Ambienti) | IT. No. Art. n. | 16 | LS/AC | 1.00 | |||||||||||||
| 83 | FIRE RESISTANT DUCTS (No.2 ROOMS) | ||||||||||||||||
| Condotti resistenti al fuoco (N.2 Ambienti) | IT. No. Art. n. | 17 | LS/AC | 1.00 | |||||||||||||
| TOTAL Fire Existinguishing / Totale Estinzione | |||||||||||||||||
| TOTAL PART III / Totale Parte III | |||||||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||||||
| IVa Power System - Impianto Forza Motrice | |||||||||||||||||
| 84 | NEW 800 KVA GENSET AND FUEL TANK | ||||||||||||||||
| Nuovo Gruppo Elettrogeno da 800 kVA e serbatoio | IT. No. Art. n. | 1 | LS/AC | 1.00 | |||||||||||||
| 85 | ABOVE GROUND FUEL TANK | ||||||||||||||||
| Serbatoio FUORI TERRA | IT. No. Art. n. | 2 | EA/NO | 2.00 | |||||||||||||
| 86 | FOUR WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a quattro vie | IT. No. Art. n. | 3 | LM/Ml | 10.00 | |||||||||||||
| 87 | NEW 300 KVA UPS | ||||||||||||||||
| NuovI UPS da 300kVA | IT. No. Art. n. | 4 | EA/NO | 2.00 | |||||||||||||
| 88 | NEW LI-ON BATTERIES | ||||||||||||||||
| Nuove Batterie a Ioni di Litio | IT. No. Art. n. | 5 | EA/NO | 2.00 | |||||||||||||
| 89 | NEW BY-PASS PANEL | ||||||||||||||||
| Nuovo Quadro di By-Pass | IT. No. Art. n. | 6 | EA/NO | 2.00 | |||||||||||||
| 90 | NEW EP1 PANEL | ||||||||||||||||
| Nuovo Quadro EP1 | IT. No. Art. n. | 7a | EA/NO | 1.00 | |||||||||||||
| 91 | NEW MUP B PANEL | ||||||||||||||||
| Nuovo QuadroMUP B | IT. No. Art. n. | 7b | EA/NO | 1.00 | |||||||||||||
| 92 | NEW BREAKER 1000 A | ||||||||||||||||
| Nuovo interruttore da 1000 A | IT. No. Art. n. | 7d | EA/NO | 1.00 | |||||||||||||
| 93 | EMERGENCY POWER OFF PUSH BUTTOM | ||||||||||||||||
| Pulsante disttivazione emergenza | IT. No. Art. n. | 8 | EA/NO | 10.00 | |||||||||||||
| 94 | NEW DISTRIBUTION PANEL NIPR B1 | ||||||||||||||||
| Nuovo Quadro di Distribuzione NIPR B1 | IT. No. Art. n. | 9a | EA/NO | 1.00 | |||||||||||||
| 95 | NEW DISTRIBUTION PANEL SIPR B1 | ||||||||||||||||
| Nuovo Quadro di Distribuzione SIPR B1 | IT. No. Art. n. | 9b | EA/NO | 1.00 | |||||||||||||
| 96 | NEW DISTRIBUTION PANEL NIPR B2 | ||||||||||||||||
| Nuovo Quadro di Distribuzione NIPR B2 | IT. No. Art. n. | 9c | EA/NO | 1.00 | |||||||||||||
| 97 | NEW DISTRIBUTION PANEL SIPR B2 | ||||||||||||||||
| Nuovo Quadro di Distribuzione SIPR B2 | IT. No. Art. n. | 9d | EA/NO | 1.00 | |||||||||||||
| 98 | NEW DISTRIBUTION PANEL NIPR B3 | ||||||||||||||||
| Nuovo Quadro di Distribuzione NIPR B3 | IT. No. Art. n. | 9e | EA/NO | 1.00 | |||||||||||||
| 99 | NEW DISTRIBUTION PANEL A/C UNIT | ||||||||||||||||
| Nuovo Quadro di Distribuzione Unita' A/C | IT. No. Art. n. | 9f | EA/NO | 1.00 | |||||||||||||
| 100 | NEW FEEDING LINES 3x35+25N+25G TO NIPR B1 PANEL | ||||||||||||||||
| Nuove linee di alimentazione 3x35+25N+25G a NIPR B1 | IT. No. Art. n. | 10a | LM/Ml | 45.00 | |||||||||||||
| 101 | NEW FEEDING LINES 3x35+25N+25G TO SIPR B1 PANEL | ||||||||||||||||
| Nuove linee di alimentazione 3x35+25N+25G a SIPR B1 | IT. No. Art. n. | 10b | LM/Ml | 45.00 | |||||||||||||
| 102 | NEW FEEDING LINES 3x35+25N+25G TO NIPR B2 PANEL | ||||||||||||||||
| Nuove linee di alimentazione 3x35+25N+25G a NIPR B2 | IT. No. Art. n. | 10c | LM/Ml | 45.00 | |||||||||||||
| 103 | NEW FEEDING LINES 3x35+25N+25G TO NIPR B3 PANEL | ||||||||||||||||
| Nuove linee di alimentazione 3x35+25N+25G a NIPR B3 | IT. No. Art. n. | 10d | LM/Ml | 45.00 | |||||||||||||
| 104 | NEW FEEDING LINES 3x35+25N+25G TO NIPR B3 PANEL | ||||||||||||||||
| Nuove linee di alimentazione 3x35+25N+25G a NIPR B3 | IT. No. Art. n. | 10e | LM/Ml | 45.00 | |||||||||||||
| 105 | NEW FEEDING LINES 4x16+16G TO A/C PANEL | ||||||||||||||||
| Nuove linee di alimentazione 4x16+16G al Quadro A/C | IT. No. Art. n. | 10f | LM/Ml | 45.00 | |||||||||||||
| 106 | NEW FEEDING LINES 4x10+10G TO PDXU-4-UE | ||||||||||||||||
| Nuove linee di alimentazione 4x10+10G al PDXU-4-UE | IT. No. Art. n. | 10g | LM/Ml | 30.00 | |||||||||||||
| 107 | NEW FEEDING LINES 4x25+25G TO CHILLER 3 | ||||||||||||||||
| Nuove linee di alimentazione 4x25+25G al Chiller 3 | IT. No. Art. n. | 10h | LM/Ml | 30.00 | |||||||||||||
| 108 | NEW FEEDING LINES 4x10+10G TO PDXU-1-UE | ||||||||||||||||
| Nuove linee di alimentazione 4x10+10G al PDXU-1-UE | IT. No. Art. n. | 10i | LM/Ml | 100.00 | |||||||||||||
| 109 | 4" STEEL CONDUIT | ||||||||||||||||
| Tubazione in acciaio da 4" | IT. No. Art. n. | 10j | LM/Ml | 100.00 | |||||||||||||
| 110 | 500x150mm GALVANIZED STEEL CABLE TRAY | ||||||||||||||||
| Canalina in acciaio 500x150mm | IT. No. Art. n. | 10k | LM/Ml | 150.00 | |||||||||||||
| 111 | 300x100mm GALVANIZED STEEL CABLE TRAY | ||||||||||||||||
| Canalina in acciaio 300x100mm | IT. No. Art. n. | 10l | LM/Ml | 280.00 | |||||||||||||
| 112 | NEW FEEDING LINES 4x(3x1x240)+2x1x240N+2x1x240PE TO EP1 Panel | ||||||||||||||||
| Nuove linee di alimentazione 4x(3x1x240)+2x1x240N+2x1x240PE al Quadro EP1 | IT. No. Art. n. | 10m | LM/Ml | 10.00 | |||||||||||||
| 113 | NEW FEEDING LINES 4x(3x1x240)+2x1x240N+2x1x240PE TO EP1 Panel | ||||||||||||||||
| Nuove linee di alimentazione 4x(3x1x240)+2x1x240N+2x1x240PE al Quadro EP1 | IT. No. Art. n. | 10n | LM/Ml | 50.00 | |||||||||||||
| 114 | NEW FEEDING LINES 3x1x240+120N+120PE TO UPS 1 | ||||||||||||||||
| Nuove linee di alimentazione3x1x240+120N+120PE TO UPS 1 | IT. No. Art. n. | 10o | LM/Ml | 15.00 | |||||||||||||
| 115 | NEW FEEDING LINES 3x1x240+120N+120PE TO UPS 2 | ||||||||||||||||
| Nuove linee di alimentazione3x1x240+120N+120PE TO UPS 2 | IT. No. Art. n. | 10p | LM/Ml | 20.00 | |||||||||||||
| 116 | NEW FEEDING LINES 3x1x240+120N+120PE TO MUP B PANEL | ||||||||||||||||
| Nuove linee di alimentazione3x1x240+120N+120PE al Quadro MUP B | IT. No. Art. n. | 10q | LM/Ml | 10.00 | |||||||||||||
| 117 | NEW FEEDING LINES 3x1x240+120N+120PE TO MUP A PANEL | ||||||||||||||||
| Nuove linee di alimentazione3x1x240+120N+120PE al Quadro MUP A | IT. No. Art. n. | 10r | LM/Ml | 20.00 | |||||||||||||
| 118 | NEW FEEDING LINES 4x10+10G TO GR PANEL | ||||||||||||||||
| Nuove linee di alimentazione 4x10+10G al Quadro GR | IT. No. Art. n. | 10s | LM/Ml | 50.00 | |||||||||||||
| 119 | NEW FEEDING LINES 3G4 IN ROOM 128 | ||||||||||||||||
| Nuove linee di alimentazione3G4 nel locale 128 | IT. No. Art. n. | 11a | LM/Ml | 1,800.00 | |||||||||||||
| 120 | NEW FEEDING LINES 3G4 IN ROOM 224 | ||||||||||||||||
| Nuove linee di alimentazione3G4 nel locale 224 | IT. No. Art. n. | 11b | LM/Ml | 420.00 | |||||||||||||
| 121 | NEW FEEDING LINES 3G4 IN ROOM 225 | ||||||||||||||||
| Nuove linee di alimentazione3G4 nel locale 225 | IT. No. Art. n. | 11c | LM/Ml | 820.00 | |||||||||||||
| 122 | MISCELLANEOUS WORKS | ||||||||||||||||
| Lavori Vari | IT. No. Art. n. | 12 | LS/AC | 1.00 | |||||||||||||
| 123 | LIGHTNING/GROUNDING SYSTEM | ||||||||||||||||
| Impianto Parafulmini/Terra | IT. No. Art. n. | 13 | LS/AC | 1.00 | |||||||||||||
| 124 | TESTING | ||||||||||||||||
| Prove | IT. No. Art. n. | 14 | LS/AC | 1.00 | |||||||||||||
| Total Power System - Totale Impianto Forza Motrice | |||||||||||||||||
| IVb Lighting System System - Impianto Illuminazione | |||||||||||||||||
| 125 | 36 W LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti da 36W | IT. No. Art. n. | 15a | EA/No | 48.00 | |||||||||||||
| 126 | 36 W LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti da 36W | IT. No. Art. n. | 15b | EA/No | 18.00 | |||||||||||||
| 127 | 36 W LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti da 36W | IT. No. Art. n. | 15c | EA/No | 12.00 | |||||||||||||
| 128 | 36 W LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti da 36W | IT. No. Art. n. | 15d | EA/No | 4.00 | |||||||||||||
| 129 | 8 W EXIT LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti Uscita da 8 W | IT. No. Art. n. | 16a | EA/No | 2.00 | |||||||||||||
| 130 | 8 W EXIT LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti Uscita da 8 W | IT. No. Art. n. | 16b | EA/No | 1.00 | |||||||||||||
| 131 | 8 W EXIT LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti Uscita da 8 W | IT. No. Art. n. | 16c | EA/No | 1.00 | |||||||||||||
| 132 | 2x50 W EMERGENCY LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti di emergenza 2x50W | IT. No. Art. n. | 17a | EA/No | 5.00 | |||||||||||||
| 133 | 2x50 W EMERGENCY LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti di emergenza 2x50W | IT. No. Art. n. | 17b | EA/No | 5.00 | |||||||||||||
| 134 | 2x50 W EMERGENCY LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti di emergenza 2x50W | IT. No. Art. n. | 17c | EA/No | 4.00 | |||||||||||||
| 135 | 54 W LED FLOODLIGHT | ||||||||||||||||
| Proiettore da 54 W a LED | IT. No. Art. n. | 18 | Ea/No | 4.00 | |||||||||||||
| Total Ligting System System - Totale Impianto Illuminazione | |||||||||||||||||
| IVc Comm System - Impianto Comunicazione | |||||||||||||||||
| 136 | NEW TELEMONITORING SYSTEM | ||||||||||||||||
| Nuovo Impianto di Monitoraggio | IT. No. Art. n. | 19 | LS/AC | 1.00 | |||||||||||||
| 137 | NEW STS IN EXISTING TELECOM RACKS ROOM 128 | ||||||||||||||||
| Nuovi STS nei Rack esistenti delle Telecomunicazioni Locale 128 | IT. No. Art. n. | 20a | EA/No | 57.00 | |||||||||||||
| 138 | NEW STS IN EXISTING TELECOM RACKS ROOM 224 | ||||||||||||||||
| Nuovi STS nei Rack esistenti delle Telecomunicazioni Locale 224 | IT. No. Art. n. | 20b | EA/No | 26.00 | |||||||||||||
| 139 | NEW STS IN EXISTING TELECOM RACKS ROOM 225 | ||||||||||||||||
| Nuovi STS nei Rack esistenti delle Telecomunicazioni Locale 225 | IT. No. Art. n. | 20c | EA/No | 13.00 | |||||||||||||
| 140 | NEW TVCC SYSTEM | ||||||||||||||||
| Nuovo Impianto TVCC | IT. No. Art. n. | 21 | LS/AC | 1.00 | |||||||||||||
| Total Comm System System - Totale Impianto Telecomunicazioni | |||||||||||||||||
| IVd Fire Alarm System systems - Impianto Allarme Incedio | |||||||||||||||||
| 141 | SMOKE DETECTORS | ||||||||||||||||
| Rilevatori di fumo | IT. No. Art. n. | 22 | EA/No | 3.00 | |||||||||||||
| 142 | MANUAL STATIONS | ||||||||||||||||
| Stazioni Manuali | IT. No. Art. n. | 23 | EA/No | 1.00 | |||||||||||||
| 143 | AUDIO/VISUAL DEVICES | ||||||||||||||||
| Dispositivi Audio/visivi | IT. No. Art. n. | 24 | EA/No | 1.00 | |||||||||||||
| 139 | FIRE SUPPRESSION CONTROL PANEL | ||||||||||||||||
| Quadro Comando Impianto Spegnimento | IT. No. Art. n. | 22 | EA/No | 5.00 | |||||||||||||
| 140 | PROGRAMMING | ||||||||||||||||
| Programmazione | IT. No. Art. n. | 23 | LS/Ac | 1.00 | |||||||||||||
| Total Fire Alarm System - Totale Impianto Allarme Incendio | |||||||||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||||||
| PART V - FIRE PREVENTION/ Parte V - Prevenzione Incendi | |||||||||||||||||
| 141 | TEST | ||||||||||||||||
| Prove | IT. No. Art. n. | 1 | LS/AC | 1.00 | |||||||||||||
| 142 | FIRE ESTINGUISHER | ||||||||||||||||
| Estintore | IT. No. Art. n. | 2 | EA/NO | 1.00 | |||||||||||||
| 143 | FIRE PREVENTION SIGNS | ||||||||||||||||
| Segnaletica antincendio | IT. No. Art. n. | 3 | LS/AC | 1.00 | |||||||||||||
| 144 | CPI PROCUREMENTS | ||||||||||||||||
| Ottenimento Certificato Prevenzioen incendi | IT. No. Art. n. | 4 | LS/AC | 1.00 | |||||||||||||
| Total Fire Prevention - Totale Prevenzione Incendi | 0.00 | ||||||||||||||||
| TOTAL PART V - Totale Parte V | 0.00 | ||||||||||||||||
| BUILDING 1442 SUMMARY / RiepilogofABBRICATO 1442 | |||||||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | 0.00 | ||||||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | 0.00 | ||||||||||||||||
| PART III - MECHANICAL | 0.00 | ||||||||||||||||
| PART IV - ELECTRICAL WORK | 0.00 | ||||||||||||||||
| PART V - FIRE PREVENTION | 0.00 | ||||||||||||||||
| TOTAL PRICE / Costo Totale | 0.00 | ||||||||||||||||
| OR US DOLLARS (RATE 1$ = 0,8390€) | 0.00 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N
11341
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| UPGRADE COMM FACILITIES AND INFRASTRUCTURE - BLDG 11341 | |||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||||||
| ASHE 21-2001 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||||||
| B | BUILDING 11341 - ALTERNATE COMM FACILITY | ||||||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||||||
| Ia Architectural Demolitions - Ia Demolizioni Architettoniche | |||||||||||||||||
| 1 | PARTIAL DEMOLITION OF CONCRETE WALL | ||||||||||||||||
| Demolizione parziale di parete in calcestruzzo | IT. No. Art. n. | 1 | Sqm/Mq | 9.00 | |||||||||||||
| 2 | METAL DOOR REMOVAL | ||||||||||||||||
| Rimozione porta metallica | IT. No. Art. n. | 2 | EA/NO | 1.00 | |||||||||||||
| 3 | DOWNSPOUT REMOVAL | ||||||||||||||||
| Rimozione pluviali | IT. No. Art. n. | 3 | EA/NO | 2.00 | |||||||||||||
| Total Architectural - Totale Architettonico | |||||||||||||||||
| Ic Civil Demolitions - Ic Demolizioni Civili | |||||||||||||||||
| 4 | EXCAVATIONS ON SOIL, H 80Cm | ||||||||||||||||
| Scavo su terreno, H 80cm | IT. No. Art. n. | 4a | Cu.m | 45.00 | |||||||||||||
| 5 | EXCAVATIONS ON SOIL, H 50cm | ||||||||||||||||
| Scavo su terreno, H 50cm | IT. No. Art. n. | 4b | Cu.m | 58.00 | |||||||||||||
| 6 | TRENCH EXCAVATIONS ON BITUMINOUS CNC PAVEMENT | ||||||||||||||||
| Scavo in trincea su pavimentazione in conglomerato bituminoso | IT. No. Art. n. | 5 | Sq.m/Mq | 12.50 | |||||||||||||
| 7 | SIDEWALK DEMOLITION | ||||||||||||||||
| Demolizione di marciapiede | IT. No. Art. n. | 6 | Sq.m/Mq | 10.00 | |||||||||||||
| 8 | MILLING OF WEARING COURSE | ||||||||||||||||
| Scarifica strato d'usura | IT. No. Art. n. | 7 | Sq.m/Mq | 50.00 | |||||||||||||
| 9 | MISCELLANEOUS REMOVALS | ||||||||||||||||
| Rimozioni varie | IT. No. Art. n. | 8 | Ls/Ac | 1.00 | |||||||||||||
| Total Civil - Totale Civile | |||||||||||||||||
| Id Mechanical Demolitions - Id Demolizioni Meccaniche | |||||||||||||||||
| 10 | REMOVAL OF No.2 DX AIR CONDITIONERS | ||||||||||||||||
| Rimozione di N.2 condizionatorI MONO-SPLIT | IT. No. Art. n. | 9 | LS/AC | 0.00 | |||||||||||||
| Total Mechanical - Totale Meccanico | |||||||||||||||||
| Ie Electrical Demolitions - Ia Demolizioni Elettriche | |||||||||||||||||
| 11 | REMOVE UPS | ||||||||||||||||
| Rimozione UPS | IT. No. Art. n. | 10 | LS/AC | 1.00 | |||||||||||||
| 12 | REMOVE ELECTRICAL PANELS | ||||||||||||||||
| Rimozione Quadri Elettrici | IT. No. Art. n. | 11 | LS/AC | 1.00 | |||||||||||||
| 13 | REMOVE MISCELLANEOUS ELECTRICAL EQUIPMENT | ||||||||||||||||
| Rimozione di varie apparecchiature elettriche | IT. No. Art. n. | 12 | LS/AC | 1.00 | |||||||||||||
| Total Electrical - Totale Elettrico | |||||||||||||||||
| TOTAL PART I / Totale Parte I | |||||||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||||||||||||
| IIa Architectural - IIa Architettonico | |||||||||||||||||
| 14 | 30cm THICK GRAVEL MATERIAL SUBBASE | ||||||||||||||||
| Sottofondo in misto granulare, Sp=30cm | IT. No. Art. n. | 1 | Cu.m/Mc | 10.80 | |||||||||||||
| 15 | 15cm THICK INDUSTRIAL TYPE FLOOR PAVEMENT | ||||||||||||||||
| Pavimento tipo industriale, spessore 15cm | IT. No. Art. n. | 2 | Sq.m/Mq | 35.80 | |||||||||||||
| 16 | FLOOR RECESSED CABLE TRENCH | ||||||||||||||||
| Trincea a pavimento | IT. No. Art. n. | 3 | Lm/Ml | 10.00 | |||||||||||||
| 17 | ROOFING SYSTEM | ||||||||||||||||
| Pacchetto di copertura | IT. No. Art. n. | 4 | Sq.m/Mq | 41.00 | |||||||||||||
| 18 | EXTERIOR PLASTER | ||||||||||||||||
| Intonaco per esterno | IT. No. Art. n. | 5 | Sq.m/Mq | 57.60 | |||||||||||||
| 19 | PAINT EXTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici esterna | IT. No. Art. n. | 6a | Sq.m/Mq | 46.60 | |||||||||||||
| 20 | PAINT EXTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici esterna | IT. No. Art. n. | 6b | Sq.m/Mq | 82.50 | |||||||||||||
| 21 | PAINT INTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici interne | IT. No. Art. n. | 7a | Sq.m/Mq | 104.00 | |||||||||||||
| 22 | PAINT INTERIOR SURFACES | ||||||||||||||||
| Pitturazione superfici interne | IT. No. Art. n. | 7b | Sq.m/Mq | 264.00 | |||||||||||||
| 23 | MARBLE SILLS AND THRESHOLDS | ||||||||||||||||
| Soglie e davanzali | IT. No. Art. n. | 8 | Lm/Ml | 4.00 | |||||||||||||
| 24 | BASEBOARD | ||||||||||||||||
| Battiscopa | IT. No. Art. n. | 9 | Lm/Ml | 26.00 | |||||||||||||
| 25 | BLOCK-UP OF LOUVER | ||||||||||||||||
| Chiusura glirglia | IT. No. Art. n. | 10 | Ls/Ac | 1.00 | |||||||||||||
| 26 | STEEL DOORS, D1 Type | ||||||||||||||||
| Porta in acciaio tipo D1 | IT. No. Art. n. | 11a | EA/NO | 1.00 | |||||||||||||
| 27 | STEEL DOORS, D2 Type | ||||||||||||||||
| Porta in acciaio tipo D2 | IT. No. Art. n. | 11b | EA/NO | 1.00 | |||||||||||||
| 28 | FLASHINGS | ||||||||||||||||
| Scossaline | IT. No. Art. n. | 12 | Lm/Ml | 27.00 | |||||||||||||
| 29 | DOWNSPOUTS | ||||||||||||||||
| Pluviali | IT. No. Art. n. | 13 | Lm/Ml | 5.40 | |||||||||||||
| 30 | DOWNSPOUTS ADAPTATION | ||||||||||||||||
| Adattamento pluviali | IT. No. Art. n. | 14 | LS/AC | 1.00 | |||||||||||||
| 31 | ANTISTATIC VINIL FLOOR | ||||||||||||||||
| Pavimento vinilico antistatico | IT. No. Art. n. | 15 | Sqm/Mq | 108.00 | |||||||||||||
| 32 | JOINT STEEL COVER | ||||||||||||||||
| Coprigiunto in acciaio | IT. No. Art. n. | 16 | Lm/Ml | 11.20 | |||||||||||||
| 33 | TYPE A FALL PROTECTION STYSTEM | ||||||||||||||||
| Sistema anticaduta tipo A | IT. No. Art. n. | 17 | LS/AC | 1.00 | |||||||||||||
| Total Architectural - Totale Architettura | |||||||||||||||||
| IIb Structural - IIb Strutturale | |||||||||||||||||
| 34 | GROUND BEAM - C16/20 LEAN CONCRETE | ||||||||||||||||
| Travi Fondazione - Calcestruzzo MAGRO C16/20 | IT. No. Art. n. | 18a | Cu.m/Mc | 4.50 | |||||||||||||
| 35 | GROUND BEAM - FORMWORKS | ||||||||||||||||
| Travi Fondazione - Casseforme | IT. No. Art. n. | 18b | Sq.m/Mq | 18.50 | |||||||||||||
| 36 | GROUND BEAM - B450C STEEL | ||||||||||||||||
| Travi Fondazione - Acciaio B450C | IT. No. Art. n. | 18c | Kg/Kg | 750.00 | |||||||||||||
| 37 | GROUND BEAM - C28/35 CONCRETE | ||||||||||||||||
| Travi Fondazione - Calcestruzzo C28/35 | IT. No. Art. n. | 18d | Cu.m/Mc | 7.00 | |||||||||||||
| 38 | GROUND BEAM - WATERPROOFING | ||||||||||||||||
| Travi di fondazione - Impermeabilizzazione | IT. No. Art. n. | 18e | Sq.m/Mq | 34.00 | |||||||||||||
| 39 | CONCRETE WALLS - FORMWORKS | ||||||||||||||||
| pareti in cls - Casseforme | IT. No. Art. n. | 19a | Sq.m/Mq | 135.00 | |||||||||||||
| 40 | CONCRETE WALLS - B450 STEEL | ||||||||||||||||
| pareti in cls - Acciaio B450C | IT. No. Art. n. | 19b | Kg/Kg | 2,700.00 | |||||||||||||
| 41 | CONCRETE WALLS - C28/35 CONCRETE | ||||||||||||||||
| pareti in cls - Calcestruzzo C28/35 | IT. No. Art. n. | 19c | Cu.m/Mc | 18.00 | |||||||||||||
| 42 | H=30 (4+22+4) PREDALLE ROOF SLAB | ||||||||||||||||
| Solaio di copertura tipo predalle, H=30 (4+22+4) | IT. No. Art. n. | 20 | Sq.m/Mq | 45.50 | |||||||||||||
| 43 | TESTING OF THE STRUCTURE | ||||||||||||||||
| Collaudo della struttura | IT. No. Art. n. | 21 | Ls/Ac | 1.00 | |||||||||||||
| Total Structural - Totale Structural | 0.00 | ||||||||||||||||
| IIb Civil - IIb Civile | |||||||||||||||||
| 44 | REINFORCED CONCRETE PAD | ||||||||||||||||
| Basamento in calcestruzzo armato | IT. No. Art. n. | 22 | Sq.m/Mq | 117.00 | |||||||||||||
| 45 | REINFORCED CONCRETE PERIMETER WALL | ||||||||||||||||
| Parete perimetrale in calcestruzzo armato | IT. No. Art. n. | 23 | Ls/Ac | 1.00 | |||||||||||||
| 46 | REINFORCED CONCRETE SIDEWALK | ||||||||||||||||
| Marciapiede in calcestruzzo | IT. No. Art. n. | 24 | Sq.m/Mq | 3.00 | |||||||||||||
| 47 | NEW BITUMINOUS CONCRETE PAV | ||||||||||||||||
| Nuova pavimentazione in conglomerato bituminoso | IT. No. Art. n. | 25 | Sq.m/Mq | 15.50 | |||||||||||||
| 48 | 3cm THICK WEARING COURSE | ||||||||||||||||
| Tappetino di usura, SP=3cm | IT. No. Art. n. | 26 | Sq.m/Mq | 30.00 | |||||||||||||
| 49 | RESTORATION OF GRASS SEEDED AREA | ||||||||||||||||
| Ripristino aree a prato | IT. No. Art. n. | 27 | Sq.m/Mq | 250.00 | |||||||||||||
| 50 | EXISTING UNDERGROUND UTILITIES RE-ROUTING | ||||||||||||||||
| Ricollocazione utenze interrate esistenti | IT. No. Art. n. | 28 | Ls/Ac | 500.00 | |||||||||||||
| 51 | SECURITY METAL FENCE | ||||||||||||||||
| Recinzione metallica di sicurezza | IT. No. Art. n. | 29 | Ls/Ac | 1.00 | |||||||||||||
| Total Civil - Totale Civile | |||||||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||||||
| IIIa - HVAC /IIIa - HVAC | |||||||||||||||||
| 52 | NEW MONO-SPLIT AIR CONDITIONERS FOR IT ROOMS | ||||||||||||||||
| Nuovi condizionatori mono-split per sale IT | IT. No. Art. n. | 1 | EA/NO | 6.00 | |||||||||||||
| 53 | NEW AIR PRESSURIZATION SYSTEM | ||||||||||||||||
| Nuovo sistema di pressurizzazione dell'aria | IT. No. Art. n. | 2 | LS/AC | 1.00 | |||||||||||||
| 54 | NEW ROOM OVERPRESSURE MONITORING SYS | ||||||||||||||||
| Nuovo sist di monitoraggio della sovrapressione locali | IT. No. Art. n. | 3 | EA/NO | 1.00 | |||||||||||||
| 55 | NEW ROOM TEMP/HUMIDITY MONITORING SYSTEM | ||||||||||||||||
| Nuovo sist di monitoraggio della temperat./umidità locali | IT. No. Art. n. | 4 | EA/NO | 1.00 | |||||||||||||
| 56 | NEW LEAK DETECTION & MONITORNG SYSTEM : UPS ROOM | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite : UPS Room | IT. No. Art. n. | 5a | EA/NO | 1.00 | |||||||||||||
| 57 | NEW LEAK DETECTION & MONITORNG SYSTEM: RACK ROOM | ||||||||||||||||
| Nuovo sistema di rilevazione e monitor. delle perdite: Rack Room | IT. No. Art. n. | 5b | EA/NO | 1.00 | |||||||||||||
| 58 | NEW DDC CONTROL AND SUPERVISION SYSTEM | ||||||||||||||||
| Nuovo sistema di regolazione e supervisione di tipo DDC | IT. No. Art. n. | 6 | LS/AC | 1.00 | |||||||||||||
| 59 | UPS VENTILATION SYSTEM MONITORING | ||||||||||||||||
| Monitoraggio operatività del sistema di ventilazione locale UPS | IT. No. Art. n. | 7 | LS/AC | 1.00 | 2925 | 1575 | 400 | 750 | 200 | ||||||||
| TOTAL PART IIIa / Totale Parte IIIa | |||||||||||||||||
| IIIb - Fire Existinguishing system /IIIb - Imp. di Estinzione Incendio | |||||||||||||||||
| 60 | NEW NOVEC 1230 EXTINGUISHING SYSTEM (No.4 ROOMS) | ||||||||||||||||
| Nuovo impianto di estinziona a gas Novec 1230 (N.4 Ambienti) | IT. No. Art. n. | 8 | LS/AC | 1.00 | |||||||||||||
| TOTAL PART IIIb / Totale Parte IIIb | |||||||||||||||||
| TOTAL PART III / Totale Parte III | |||||||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||||||
| IVa Power System - Impianto Forza Motrice | |||||||||||||||||
| 61 | NEW BREAKERS | ||||||||||||||||
| Nuovi interruttori | IT. No. Art. n. | 1 | EA/No | 2.00 | |||||||||||||
| 62 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2a | LM/Ml | 190.00 | |||||||||||||
| 63 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2b | LM/Ml | 90.00 | |||||||||||||
| 64 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2c | LM/Ml | 190.00 | |||||||||||||
| 65 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2d | LM/Ml | 90.00 | |||||||||||||
| 66 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2e | LM/Ml | 20.00 | |||||||||||||
| 67 | TWO WAY CABLE DUCT | ||||||||||||||||
| Cavidotto a due vie | IT. No. Art. n. | 2f | LM/Ml | 30.00 | |||||||||||||
| 68 | NEW 125 KVA GENSETS AND FUEL TANKS | ||||||||||||||||
| Nuovi Gruppi Elettrogeni da 125 kVA e serbatoi | IT. No. Art. n. | 3 | EA/No | 2.00 | |||||||||||||
| 69 | NEW 60 KVA UPS | ||||||||||||||||
| NuovI UPS da 60 kVA | IT. No. Art. n. | 4 | EA/No | 2.00 | |||||||||||||
| 70 | NEW BATTERY CABINETS | ||||||||||||||||
| NuovI Quadri Batterie | IT. No. Art. n. | 5 | EA/No | 2.00 | |||||||||||||
| 71 | NEW PARALLEL PANEL | ||||||||||||||||
| Nuovo Quadro di Parallelo | IT. No. Art. n. | 6 | EA/No | 1.00 | |||||||||||||
| 72 | NEW DISTRIBUTION PANELS | ||||||||||||||||
| Nuovi Quadri di Distribuzione | IT. No. Art. n. | 7a | EA/No | 1.00 | |||||||||||||
| 73 | NEW DISTRIBUTION PANELS | ||||||||||||||||
| Nuovi Quadri di Distribuzione | IT. No. Art. n. | 7b | EA/No | 1.00 | |||||||||||||
| 74 | NEW DISTRIBUTION PANELS | ||||||||||||||||
| Nuovi Quadri di Distribuzione | IT. No. Art. n. | 7c | EA/No | 1.00 | |||||||||||||
| 75 | NEW FEEDING LINES | ||||||||||||||||
| Nuove alimentazioni | IT. No. Art. n. | 8a | EA/No | 300.00 | |||||||||||||
| 76 | NEW FEEDING LINES | ||||||||||||||||
| Nuove linee di alimentazione | IT. No. Art. n. | 8b | LM/Ml | 100.00 | |||||||||||||
| 77 | NEW FEEDING LINES | ||||||||||||||||
| Nuove linee di alimentazione | IT. No. Art. n. | 8c | LM/Ml | 60.00 | |||||||||||||
| 78 | NEW FEEDING LINES | ||||||||||||||||
| Nuove linee di alimentazione | IT. No. Art. n. | 8d | LM/Ml | 30.00 | |||||||||||||
| 79 | NEW FEEDING LINES | ||||||||||||||||
| Nuove linee di alimentazione | IT. No. Art. n. | 8e | LM/Ml | 30.00 | |||||||||||||
| 80 | 300x100mm GALVANIZED STEEL CABLE TRAY | ||||||||||||||||
| Canalina in acciaio 300x100mm | IT. No. Art. n. | 8f | LM/Ml | 50.00 | |||||||||||||
| 76 | 16A INTERLOCKED OUTLET | ||||||||||||||||
| Presa interbloccata 16 A | IT. No. Art. n. | 9 | Ea/No | 4.00 | |||||||||||||
| 77 | ALTERATION ON GROUNDING SYSTEM | ||||||||||||||||
| Modifiche Impianto di terra | IT. No. Art. n. | 10 | LS/AC | 1.00 | |||||||||||||
| 78 | LIGHTNING/ GROUNDING SYSTEM | ||||||||||||||||
| Impianto Parafulmini/ Impianto di terra | IT. No. Art. n. | 11 | LS/AC | 1.00 | |||||||||||||
| 79 | TESTING | ||||||||||||||||
| Prove | IT. No. Art. n. | 12 | LS/AC | 1.00 | |||||||||||||
| Total Power System - Totale Impianto Forza Motrice | |||||||||||||||||
| IVb Lighting System System - Impianto Illuminazione | |||||||||||||||||
| 80 | 36 W LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti da 36W | IT. No. Art. n. | 13 | EA/No | 44.00 | |||||||||||||
| 81 | 8 W EXIT LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti Uscita da 8 W | IT. No. Art. n. | 14 | EA/No | 2.00 | |||||||||||||
| 82 | 2x50 W EMERGENCY LIGHTING FIXTURES | ||||||||||||||||
| Corpi Illuminanti di emergenza 2x50W | IT. No. Art. n. | 15 | EA/No | 3.00 | |||||||||||||
| 83 | 54 W LED FLOODLIGHT | ||||||||||||||||
| Lprtoiettore da 54 W a LED | IT. No. Art. n. | 16 | Ea/No | 4.00 | |||||||||||||
| Total Ligting System System - Totale Impianto Illuminazione | |||||||||||||||||
| IVc Comm System - Impianto Comunicazione | |||||||||||||||||
| 84 | NEW TELEMONITORING SYSTEM | ||||||||||||||||
| Nuovo Impianto di Monitoraggio | IT. No. Art. n. | 17 | LS/Ac | 1.00 | |||||||||||||
| 85 | NEW STS IN EXISTING TELECOM RACKS | ||||||||||||||||
| Nuovi STS nei Rack esistenti delle Telecomunicazioni | IT. No. Art. n. | 18 | EA/No | 16.00 | |||||||||||||
| 86 | NEW TVCC SYSTEM | ||||||||||||||||
| Nuovo Impianto TVCC | IT. No. Art. n. | 19 | LS/AC | 1.00 | |||||||||||||
| Total Comm System System - Totale Impianto Telecomunicazioni | |||||||||||||||||
| IVd Fire Alarm System systems - Impianto Allarme Incedio | |||||||||||||||||
| 87 | SMOKE DETECTORS | ||||||||||||||||
| Rilevatori di fumo | IT. No. Art. n. | 20 | EA/No | 2.00 | |||||||||||||
| 88 | MANUAL STATIONS | ||||||||||||||||
| Stazioni Manuali | IT. No. Art. n. | 21 | EA/No | 1.00 | |||||||||||||
| 89 | AUDIO/VISUAL DEVICES | ||||||||||||||||
| Dispositivi Audio/visivi | IT. No. Art. n. | 22 | EA/No | 1.00 | |||||||||||||
| 90 | FIRE SUPPRESSION CONTROL PANEL | ||||||||||||||||
| Quadro Comando Impianto Spegnimento | IT. No. Art. n. | 23 | EA/No | 1.00 | |||||||||||||
| 91 | PROGRAMMING | ||||||||||||||||
| Programmazione | IT. No. Art. n. | 24 | LS/Ac | 1.00 | |||||||||||||
| Total Fire Alarm System - Totale Impianto Allarme Incendio | |||||||||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||||||
| PART V - FIRE PREVENTION/ Parte V - Prevenzione Incendi | |||||||||||||||||
| 92 | TEST | ||||||||||||||||
| Prove | IT. No. Art. n. | 1 | LS/AC | 1.00 | |||||||||||||
| 93 | FIRE ESTINGUISHER | ||||||||||||||||
| Estintore | IT. No. Art. n. | 2 | EA/NO | 1.00 | |||||||||||||
| 94 | FIRE PREVENTION SIGNS | ||||||||||||||||
| Segnaletica antincendio | IT. No. Art. n. | 3 | LS/AC | 1.00 | |||||||||||||
| 95 | CPI PROCUREMENTS | ||||||||||||||||
| Ottenimento Certificato Prevenzioen incendi | IT. No. Art. n. | 4 | LS/AC | 1.00 | |||||||||||||
| Total Fire Prevention - Totale Prevenzione Incendi | |||||||||||||||||
| TOTAL PART V - Totale Parte V | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||||
| BUILDING 11341 SUMMARY / Riepilogo FABBRICATO 11341 | |||||||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||||||
| PART III - MECHANICAL | |||||||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||||||
| PART V - FIRE PREVENTION | |||||||||||||||||
| TOTAL PRICE / Costo Totale | |||||||||||||||||
| OR US DOLLARS (RATE 1$ = 0,8390€) |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &CFOR OFFICIAL USE ONLY&RSheet &P of &N
F04 1304
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| UPGRADE COMM FACILITIES AND INFRASTRUCTURE - BLDG 1304 | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 21-2021 | AREA F - AVIANO AIR BASE | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| C | BUILDING 1304 - SUBSTATION F04 | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Id Electrical Demolitions - Demolizioni Elettriche | |||||||||||||
| 1 | REMOVAL OF EXISTING HV SWITCHGEAR | ||||||||||||
| Rimozione del QMT | IT. No. Art. n. | 1 | Ls/Ac | 1.00 | |||||||||
| 2 | REMOVAL OF CAST RESIN TRANSFORMER, INCL METAL ENCLOSURE | ||||||||||||
| Rimozione di Trasformatore in resina, incl box metallico | IT. No. Art. n. | 2 | Ls/Ac | 1.00 | |||||||||
| 3 | REMOVAL OF LV SWITCHGEAR | ||||||||||||
| Rimozione di QGBT | IT. No. Art. n. | 3 | Ls/Ac | 1.00 | |||||||||
| 4 | REMOVAL OF PFC UNITs | ||||||||||||
| Rimozione di Quadri Rifasamento | IT. No. Art. n. | 4 | Ls/Ac | 1.00 | |||||||||
| 5 | REMOVAL OF BUSWAYS | ||||||||||||
| Rimozione di Blindosbarre | IT. No. Art. n. | 5 | Ls/Ac | 1.00 | |||||||||
| 6 | REMOVAL OF TEL/TEL PANEL TO BE REINSTALLED | ||||||||||||
| Rimozione di Quadro TEL/TEL da reinstallare | IT. No. Art. n. | 6 | Ls/Ac | 1.00 | |||||||||
| 7 | REMOVAL OF STREET LIGHTING PANEL TO BE REINSTALLED | ||||||||||||
| Rimozione di Quadro Illuminazione Esterna da reinstallare | IT. No. Art. n. | 7 | Ls/Ac | 1.00 | |||||||||
| 8 | REMOVAL OF LIGHTING FIXTURES AND OUTLETS, INCL WIRINGS | ||||||||||||
| Rimozione elementi illuminanti, incluso pese e cablaggi | IT. No. Art. n. | 8 | Ls/Ac | 1.00 | |||||||||
| Total Electrical - Totale Elettrico | |||||||||||||
| TOTAL PART I / Totale Parte I | |||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORK / Parte II - Lavori Architettonici e Civili | |||||||||||||
| IIa Architectural and Structural Work - IIa Lavori Architettonici e Strutturali | |||||||||||||
| 9 | PAINTING OF EXTERIOR WALL SURFACES | ||||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | 213.00 | |||||||||
| 10 | PAINTING OF INTERIOR SURFACES | ||||||||||||
| Tinteggiatura delle superfici INTERNE | IT. No. Art. n. | 2 | SQM/MQ | 165.00 | |||||||||
| 11 | PAINTING OF EXTERIOR METAL SURFACE | ||||||||||||
| Pitturazione di superfici metalliche esterne | IT. No. Art. n. | 3 | SQM/MQ | 27.00 | |||||||||
| 12 | NEW MOUSE SCREEN, INCL, FRAME | ||||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 4 | LS/AC | 1.00 | |||||||||
| 13 | PANIC HARDWARE BAR INSTALLATION | ||||||||||||
| Installazione barra antipanico | IT. No. Art. n. | 5a | Ea/No | 1.00 | |||||||||
| 14 | PANIC HARDWARE BAR INSTALLATION | ||||||||||||
| Installazione barra antipanico | IT. No. Art. n. | 5b | Ea/No | 1.00 | |||||||||
| Total Architectural and Structural Work - Totale Lavori Architettonici e Strutturali | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| 15 | N2.2 DUCTED AXIAL EXHAUST FAN | ||||||||||||
| No.2 estrattori assiali | IT. No. Art. n. | 1 | Ls/Ac | 1.00 | |||||||||
| Total Mechanical Work - Totale Lavori Meccanici | |||||||||||||
| TOTAL PART III / Totale Parte III | |||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||
| IVa Power System - Impianto Forza Motrice | |||||||||||||
| 16 | INSTALLATION OF THE ELECTRICAL EQUIPMENT PREVIOUSLY REMOVED | ||||||||||||
| Installazione delle apparecchiature elettriche precedentemente rimosse | IT. No. Art. n. | 1 | Ls/Ac | 1.00 | |||||||||
| 17 | TEMPORARY SUBSTATION | ||||||||||||
| Cabina Temporanea | IT. No. Art. n. | 2 | Ls/Ac | 1.00 | |||||||||
| 18 | HIGH VOLTAGE SWITCHGEAR | ||||||||||||
| Quadro MT | IT. No. Art. n. | 3 | Ea/No | 1.00 | |||||||||
| 19 | TRANSFORMER 1250 kVA | ||||||||||||
| Trasformatore 1250 KVA | IT. No. Art. n. | 4 | Ea/No | 2.00 | |||||||||
| 20 | TRANSFORMER 1250 kVA, METAL ENCLOSURES | ||||||||||||
| Box mettallico per Trasformatore 1250 KVA | IT. No. Art. n. | 5 | Ea/No | 2.00 | |||||||||
| 21 | LOW VOLTAGE SWITCH GEAR | ||||||||||||
| Quadro BT | IT. No. Art. n. | 6 | Ea/No | 1.00 | |||||||||
| 22 | 2500 A BUSWAYS | ||||||||||||
| Blindosbarre 2500 A | IT. No. Art. n. | 7 | Lm/Ml | 10.00 | |||||||||
| 23 | SUBSTATION SERVICE PANEL | ||||||||||||
| Quadro servizi cabina | IT. No. Art. n. | 8 | Ea/No | 1.00 | |||||||||
| 24 | EXHAUST FAN CONTROL PANEL | ||||||||||||
| Quadro Sistema Ventilazione | IT. No. Art. n. | 9 | Ea/No | 1.00 | |||||||||
| 25 | BATTERY CHARGER | ||||||||||||
| Caricabatteria | IT. No. Art. n. | 10 | Ea/No | 1.00 | |||||||||
| 26 | AUTOMATIC POWER FACTOR CORRECTION UNIT | ||||||||||||
| Unità di rifasamento automatico | IT. No. Art. n. 1a | 11 | Ea/No | 1.00 | |||||||||
| 27 | 16A INTERLOCKED OUTLET | ||||||||||||
| Presa interbloccata 16 A | IT. No. Art. n. | 12 | Ea/No | 4.00 | |||||||||
| 28 | CLASS 1/2 SPD | ||||||||||||
| Scaricatore in Classe 1/2 | IT. No. Art. n. | 13 | Ea/No | 1.00 | |||||||||
| 29 | WALL MOUNTED BOX DOCUMENTATIONS | ||||||||||||
| Scatola a parete contenente documentazione Cabina | IT. No. Art. n. | 14 | Ea/No | 1.00 | |||||||||
| 30 | METAL CABLE TRAY | ||||||||||||
| Canalina metallica | IT. No. Art. n. | 15 | Lm/Ml | 20.00 | |||||||||
| 31 | GROUNDING SYSTEM TESTS | ||||||||||||
| Prove sull'impianto di terra | IT. No. Art. n. | 16 | Ls/Ac | 1.00 | |||||||||
| 32 | SUBSTATION CERTIFICATIONS | ||||||||||||
| Certificazioni della sottostazione | IT. No. Art. n. | 17 | Ls/Ac | 1.00 | |||||||||
| Total Power System - Totale Impianto Forza Motrice | |||||||||||||
| IVb Lighting System System - Impianto Illuminazione | |||||||||||||
| 33 | 36 W LED LIGHTING FIXTURE | ||||||||||||
| Lampada a LED 36 W | IT. No. Art. n. | 18 | Ea/No | 8.00 | |||||||||
| 34 | 54 W LED FLOODLIGHT | ||||||||||||
| Lprtoiettore da 54 W a LED | IT. No. Art. n. | 19 | Ea/No | 2.00 | |||||||||
| 35 | 8 W LED EMERGENCY LIGHTING FIXTURE | ||||||||||||
| Lampada di emergenza LED 8 W | IT. No. Art. n. | 20 | Ea/No | 6.00 | |||||||||
| Total Ligting System System - Totale Impianto Illuminazione | |||||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||
| BUILDING 1304 SUMMARY / Riepilogo FABBRICATO 1304 | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL WORK | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| TOTAL PRICE / Costo Totale | |||||||||||||
| OR US DOLLARS (RATE 1$ = 0,8390€) |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &CFOR OFFICIAL USE ONLY&RSheet &P of &N
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| UPGRADE COMM FACILITIES AND INFRASTRUCTURE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 21-2001 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| A | BLDG 1442 - ICC BUILDING | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| PART V - FIRE PREVENTION | ||||||||||
| SUBTOTAL A | ||||||||||
| B | BLDG 11341 - ALTERNATE COMM FACILITY | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| PART V - FIRE PREVENTION | ||||||||||
| SUBTOTAL B | ||||||||||
| C | BLDG 1304 - SUBSTATION F04 | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| SUBTOTAL C | ||||||||||
| TOTAL PRICE / Costo Totale | ||||||||||
| or US DOLLARS (RATE 1$ = 0,8390€) | ||||||||||
| DISCIPLINE COST SUMMARY | ||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||
| PART III - MECHANICAL | ||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||
| PART V - FIRE PREVENTION | ||||||||||
| TOTAL PRICE / Costo Totale | ||||||||||
| or US DOLLARS (RATE 1$ = 0,8390€) |
Grand Total
| UPGRADE COMM FACILITIES AND INFRASTRUCTURE | |||||||||
| INSTRUCTIONS FOR COMPLETING THE FORM | |||||||||
| A. BLDG 1442 | B. BLDG 11341 | C. BLDG 1304 | TOTAL (€) | TOTAL ($) | |||||
| TOTAL MATERIAL COSTS | € | € | € | € | $ | ||||
| TOTAL LABOR COSTS | € | € | € | € | $ | ||||
| TOTAL OTHER DIRECT COSTS | € | € | € | € | $ | ||||
| TOTAL DIRECT COSTS | € | € | € | € | $ | ||||
| OVERHEAD | % | € | € | € | € | $ | |||
| SUBTOTAL | € | € | € | € | $ | ||||
| PROFIT | % | € | € | € | € | $ | |||
| TOTAL PRICE | € | € | € | € | $ | ||||
| DATE | FIRM NAME | ||||||||
| TITLE | BY | ||||||||
| INSTRUCTIONS TO OFFERORS |
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .