This document is a pre-solicitation notice for project ASHE 21-1027 REPAIR FACILITY 1362 FOR OHWS & LMOC. The project scope involves repair work at Facility 1362 at Aviano Air Base in Italy to allow occupancy by two teams. The work includes HVAC, electrical, structural, water and fire suppression upgrades. The estimated value is between $500,000 and $1,000,000. A site visit will be scheduled and organized. The solicitation number is FA5682-F1F3A22322A001 and is anticipated to be issued in January 2023. Offerors must have a current System for Award Management registration and Standard Occupational Classification for the cited category OG01 at time of proposal and award. The work will be performed in Italy according to DFARS 252.225-7042 and 252.204-7007 Alternate A.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AVIANO MASTERSPECS 2020.pdf | ||
| ASHE 21-1027 PSC.pdf | ||
| ANNEX-01 - BLDG ACCEPTANCE CKLT.pdf | ||
| ASHE 21-1027 CCEB.xlsx | XLSX spreadsheet | |
| ASHE 21-1027 DRAWINGS 40-71.pdf | ||
| ASHE 21-1027 DRAWINGS 1-39.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Prepared and Submitted by:
Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)
Tel. +39 0434 1602158 Email: info@engtools.eu
PROJECT ASHE 21-1027
A/E CONTRACT No. FA5682-20-D-0005;
D.O. FA568221F0042
REPAIR FAC. 1362 FOR OHWS & LMOC, AREA F,
AVIANO AB, ITALY
TECHNICAL SPECIFICATIONS
SUBMITTAL: FINAL (100% design)
Date: August 23rd, 2022
PROJECT: ASHE 21-1027 REPAIR FAC.1362 FOR OHWS & LMOC
Page 2 of 94 TECHNICAL SPECIFICATIONS FINAL (100% design)
THIS PAGE LEFT INTENTIONALLY BLANK
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Prepared and Submitted by:
Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)
Tel. +39 0434 1602158 Email: info@engtools.eu
PROJECT ASHE 21-1027
A/E CONTRACT No. FA5682-20-D-0005; D.O. FA568221F0042
REPAIR FAC. 1362 FOR OHWS & LMOC, AREA F – AVIANO AB, ITALY
TECHNICAL SPECIFICATIONS
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT NO. ASHE 21-1027, PERTAINING TO THE
REPAIR WORKS ON FACILITY 1362 FOR OHWS & LMOC AT AVIANO AB,
I DECLARE THAT I HAVE ASCERTAINED THAT THE TECHNOLOGICAL SYSTEMS INCLUDED THERIN COMPLY
WITH THE APPLICABLE ITALIAN NORMS.
Date: 23/08/2022
Design Coordination and Review, Architectural
Arch. Massimo Pilot Ordine degli Architetti della Provincia di Catania No. 2542 Sez. A
Mechanical, Fire Suppression
Ing. Andrea Sava Ordine degli Ingegneri della Provincia di Udine No. 1891 Sez.A
Electrical
Ing. Giorgio Paron Ordine degli Architetti della Provincia di Udine No. 2209 Sez. A
Page 4 of 94 TECHNICAL SPECIFICATIONS FINAL (100% design)
REPAIR FAC.1362 FOR OHWS & LMOC PROJECT: ASHE 21-1027
FINAL (100% design) TECHNICAL SPECIFICATIONS Page 5 of 94
TABLE OF CONTENTS
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 6
SCHEDULE OF MATERIAL SUBMITTALS 23
REVISED TECHNICAL SPECIFICATIONS 29
SCHEDULE OF WORK ITEMS 61
Page 6 of 94 AC1 FINAL (100% design)
AC1 - 1. SCOPE OF PROJECT
The Project Scope is a general repair work of Building 1362 in order to allow two Teams (OHWS and LMOC) to occupy the facility.
Facility 1362 originally housed flight simulators. The flight simulators have been moved, and Facility 1362 is being repurposed. The facility will be split into two sides. One side will house the Live Mission Operations Capability [unit] (LMOC), and the other side will be an Optimization of the Human Weapons System (OHWS) location. Facility upgrades will include HVAC, electrical, structural, water, and fire suppression.
Architectural The architectural works include some renovations aimed at solving some problems related to the age and wear of the building. Other architectural works intend to satisfy the requests of the new users and adapt the building to the new intended use.
More specifically, architectural demolitions and works to be performed includes but is not limited to the following items:
• Demolition of existing floors of any material including screed;
• Removal of modular raised floor including support structure with maintenance in place of the existing ramp;
• Removal of false ceiling including support structure and insulating material;
• Complete dismantling of the restrooms, including the removal of the sanitary units;
• Removal of all internal and external doors and windows;
• Removal of thresholds and window sills and partial demolition of the underlying masonry to allow the subsequent application of insulating material;
• Removal of damaged internal plasters;
• Removal of the sheath on the roof including all the works connected to it;
• Removal of tinsmiths and downspouts.
• Formation of a new screed with a thickness of up to 8cm and installation of new stoneware flooring of different sizes. The finished elevation of the project floor will be the same as the actual one.
• Supply and installation of raised floor inside room 109, including support structure and connection of the flooring to the existing ramp;
• Construction of industrial-type smooth concrete flooring inside the thermal power plant;
• Reconfiguration of the restrooms according to the new layout through the formation of new plasterboard partitions and prefabricated partitions in laminated panels;
• Completion of restrooms by supplying and laying floors, coverings, bathroom fixtures and accessories;
• Construction of a new false ceiling in mineral fiber panels including insulating mat and support structure. The false ceiling includes natural anti-seismic slopes;
• Internal leveling of the perimeter walls to make the surface uniform;
• Installation of new internal doors and windows;
• Painting of all internal surfaces. Evaluate the colors with the customer, and in particular inside the room # 109 if necessary, have a dark color as existing;
• Safety entry training in the hallway of the LMOC area;
• Supply and installation of new external doors and windows, including thresholds and sills and insulation of the shoulders, lintels and under-threshold / sill to reduce thermal bridges;
• Formation of thermal insulation coating in EPS with a thickness of 140mm;
FINAL (100% design) AC1 Page 7 of 94
• Formation of a new roof covering with a white sheath such as “Derbigum Derbibrite NT”, including supply and installation of new plumbing and downspouts;
• Creation of an anti-fall system on the roof consisting of self-supporting parapets and external access staircase with central track;
• Installation of the previously removed carpentry structure, including any adjustments to it deriving from different thickness of the masonry, the need for new holes, anchors or minor repairs if rust is present;
• Construction of new reinforced concrete sprinkler system valve room. Internal net dimensions:
300x300xh300cm, fire resistance REI60.
Mechanical Mechanical works included in the project are specific of the two different areas.
For the OHWC AREA anticipated mechanical works to be performed includes but is not limited to the following items:
• Installation of heating radiators inside the restrooms area.
• A new intake line will be taken from the heating line to feed up two radiators in the restrooms area.
• A proper cleaning and sanitation shall be performed for the entire ducting system.
• Flexible ducts shall be changed where needed.
• Restroom area shall be refurbished with new drainage system, new water supply system with installation of all new fixtures.
• In the corridor nearby the bathrooms area will be added a new drinking fountain.
• The existing exhaust system will be removed and replaced by new exhaust system, with circular duct, exhaust valves and new fan.
• Vent pipe will be installed.
• Installation of new wet sprinkler system (whole building)
For the LMOC AREA anticipated mechanical works are the following:
• DX systems will be temporary removed and re installed in order to allow the running of civil works on the external wall.
• Argon fire suppression system will be removed completely
• Demolition and removal of CRAC and the dry condensers
• Removal of the full Argon system with the nozzles, piping and cylinders
• Installation of new ventilation ducted type system.
• Installation of a new AHU serving the full area.
• Installation of Heat pump located outside the building.
• Installation of new wet sprinkler system (whole building)
Electrical Project Scope is to modify and update the electrical in order to support the new building usage and to meet HVAC upgrade.
Electrical works to be performed includes but is not limited to the following items.
• Furnishing and installation of new circuit breakers
• Furnishing and installation of power receptacles
• Furnishing and installation of new pushbutton, 230V a.c., 10A, for command lighting fixtures
Page 8 of 94 AC1 FINAL (100% design)
• Furnishing and installation of new ordinary lighting system including DALI control unit and DALI wiring
• Furnishing and installation of new emergency lighting fixtures
• Furnishing and installation of telecommunication system outlets
• Furnishing and installation of new fire alarm system
• All needed pipes, conduits and cabling
FINAL (100% design) AC1 Page 9 of 94
AC1 - 3. LEED CERTIFICATION
Not Required.
AC1 - 4. SUBMITTAL OF MATERIALS
In accordance with Paragraph 2.5 of the technical specification No. 01100, entitled “GENERAL CONDITIONS” of the Master Specifications (new edition, 2020), the materials listed in "MATERIAL SUBMITTAL SCHEDULE" shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative. The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials. Number of copies will be as required on "MATERIAL
SUBMITTAL SCHEDULE".
AC1 - 5. CONSTRUCTION AREA SCREENING
All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s (C.O.) Technical Representative. Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by Contracting Officer (C.O.). Contractor shall submit photos or samples of the screening material for approval by C.O. The Contractor shall replace or repair in a timely manner, as determined by C.O., all fences and screening sections that have damage or develop unsightly rips or holes. It is strictly forbidden to install advertisement signs and/or logos including contractor’s along the construction site fence. At the end of the work or when exterior work requires it, temporary fencing shall be removed. Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1 - 6. PROJECT SIGN
The Contractor shall furnish a project sign on site in accordance with Section 01101. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility.
Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to C.O. for approval.
AC1 - 7. JOB SITE MOBILIZATION
The Contractor shall submit a proposal to C.O. diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution cannot begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE. Temporary overhead utility runs are prohibited.
Contractor shall include a plan for supplying required utilities to their site in their proposal.
Page 10 of 94 AC1 FINAL (100% design)
AC1 - 8. SAFETY
Contractor's activities shall be in compliance with the following: OSHA 29 CFR 1926 Construction Regulations, US Corps of Engineers Manual EM385-1-1 Nov. 2014, AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards, and Italian Legislative Decree 81/08 including subsequent amendments: in case of any differences, the more stringent applies.
An appointed professional shall develop a site-specific safety plan (PSC - Piano di Sicurezza e Coordinamento), in accordance with Legislative Decree 81/08). PSC is considered equivalent to the Accident prevention plan required by Manual USACE EM385-1-1.
Contractor shall consider in advance interference hazard through a preliminary assessment plan: the DUVRI - Documento Unico per la Valutazione Rischi da Interferenze shall be coordinated with 31 FW/CCPP Base employees safety representative (Phone 0434 30 5709), in accordance with Legislative Decree 81/08.
Contractor shall develop a site specific plan for operational safety (POS - Piano Operativo di Sicurezza) in accordance with Legislative Decree 81/08, prior to starting planned work activities. Employees training certificates shall be included in the POS documents.
Contractor’s design submittals may also include, as necessary, an Elaborato Tecnico della Copertura (Roof Fall Protection Operational Manual - ROM) in accordance with Friuli Venezia Giulia Regional Law 24, 16 OCT 2015, on mandatory directions for permanent fall protection measure on roofing systems. Mentioned submittal package is subjects to 31 CES/CEOER approval in coordination with 31 FW/SEG.
Contractor’s activities connected with maintenance of Base facilities and infrastructures shall be in compliance with OSHA 29 CFR 1910 General Industry regulations. For maintenance, surveys, repairs and plants installation requiring access to roof structures, activities shall be executed in accordance with OSHA 1910.28(b)(9)(i)(D) on fall arrest systems for fixed ladders, and Friuli Venezia Giulia Regional Law 24/2015 for mandatory directions on permanent fall protection measure on roofing systems.
Contractor’s activities connected with construction, installation, maintenance and repairs of systems, equipment, tools and machinery (including parts, accessories and appurtenances) covered by European Machinery Directive 2006/42/EC shall be performed so as to maintain current compliance with mentioned directive. Machinery control logs shall be duly signed after each repair or maintenance operation by a certified Contractor’s representative. Recertification processes, revamping or retrofitting of systems, equipment, tools and machinery (including parts, accessories and appurtenances) shall be performed in accordance with European Machinery Directive 2006/42/EC. Related compliance certificates shall be duly signed by a Contractor representative.
Contractor’s activities within confined spaces are covered by OSHA 29 CFR 19.26.1200 and OSHA 29 CFR 1910.146, respectively for Construction and General Industry. Mentioned regulations shall be coordinated with Italian presidential decree DPR 177, dated 14 SEP 2011. Mandatory prescriptions on confined space shall be taken into consideration at the design stage for new contracts as well as for maintenance and repair contracts.
Contractor's representatives shall receive a safety briefing during the pre-performance conference from Base 31 FW/SEG Occupational Safety Office. Electronic copy of POS will be provided to 31 FS/SEG (Phone 0434 30 4817).
AC1 - 9. CUSTODY OF HAZARDOUS WASTE AND HAZARDOUS MATERIALS
Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
• Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
• Safety Data Sheets: The Contractor shall furnish English language versions of the Safety
FINAL (100% design) AC1 Page 11 of 94
Data Sheets (SDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEIE for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the SDS form to the Contractor.
• Hazardous Waste Management Plan: The Contractor shall provide a hazardous waste management plan.
• Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEIE office.
• Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers. Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEIE through the Director of Works.
• Asbestos Containing Materials: Asbestos containing materials could be encountered during demolition work. It shall be the responsibility of the Contractor to handle and dispose asbestos containing materials in the appropriate manner, as prescribed by Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of asbestos containing materials shall be in compliance with Local Regulations.
AC1 - 10. PRESERVATION OF EXISTING CONDITIONS
The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by C.O. to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1 - 11. WORK SITE CONDITIONS
The work areas shall be made available to the Contractor as follows:
a. Building interior area: Government personnel will remove movable furniture items prior commencement of the work.
b. Building Location: facility 1362 is located in a no-restricted area. Contractor shall strictly comply with the Contracting Officer’s instructions. Delays may happen when the Contractor will enter the areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the USA Government.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by C.O., unless it is hidden by the opaque fencing material. Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition and painted a color which coordinates with the base architectural plan and is approved by C.O., if it is not
Page 12 of 94 AC1 FINAL (100% design) hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by C.O.
e. Loading and Unloading of Construction Materials and Equipment: Unloading of materials will be allowed within the fenced work area. Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings. Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area; unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work. Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
AC1 - 12. AIRFIELD SAFETY TRAINING
Work site area is outside Airfield Area.
AC1 - 13. PARKING
Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or lay-down areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public. The Contractor shall not park outside the construction zone unless approved through C.O. The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1 - 14. ACCESS ROUTES
The Contractor shall provide a haul route plan for approval by C.O.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four (4) weeks prior to his scheduled starting of work.
AC1 - 15. TRUCKING AND ROADS
Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered. Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these
FINAL (100% design) AC1 Page 13 of 94 areas continuously as long as material deliveries are being made.
AC1 - 16. NOISE CONTROL
The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1 - 17. EXCAVATIONS
Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible.
Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the Contractor and shall be implemented as directed by BCE.
All road cuts must be approved by BCE prior to execution.
With regards to soil backfilling compacting, the Contractor shall:
- Compact the lower layer made of natural soil or subgrade up to 90% of maximum density;
- Compact the subbase course up to 85% of maximum density
- Compact the base course up to 75% of maximum density.
The Contractor is anyway required to repair all soil/paved surfaces impacted by the excavations, lowering of backfilled trenching for a period of six months after contract closure.
AC1 - 18. LAWN MAINTENANCE
Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE. Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowings after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the Contractor.
AC1 - 19. LAWN ESTABLISHMENT
Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE. Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by C.O.
AC1 - 20. CONSTRUCTION SITE RESTORATION
All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five (5) days of Government acceptance of the project site.
AC1 - 21. PROCEDURES AND WORK PHASES
Page 14 of 94 AC1 FINAL (100% design)
Prior to starting any work, the Contractor shall submit a Work Plan for approval by the Contracting Officer.
AC1 - 22. SALVAGEABLE MATERIALS
In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative. It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
FINAL (100% design) AC1 Page 15 of 94
AC1 - 23. CONSTRUCTION DRAWINGS
The following Construction Drawings complement this Technical Specification and are an integral part of the project documents.
Page 16 of 94 AC1 FINAL (100% design)
FINAL (100% design) AC1 Page 17 of 94
Page 18 of 94 AC1 FINAL (100% design)
FINAL (100% design) AC1 Page 19 of 94
Page 20 of 94 AC1 FINAL (100% design)
AC1 - 24. TECHNICAL SPECIFICATION
Specifications for construction projects of the Air Base in Aviano (PN), Italy, revision 2020, and applicable modification, shall be applicable to the present project, together with the List of Work Items to be performed:
- 01100 GENERAL CONDITIONS
- 01101 PROJECT SIGN
- 02220 SITE DEMOLITION
- 07840 FIRE STOPPING
- 08810 STEEL DOORS AND STEEL FRAMES
- 09220 INTERIOR PLASTER
- 09510 ACOUSTICAL CEILING
- 09900 PAINTS AND COATINGS
- 15050 BASIC MECHANICAL MATERIALS AND METHODS
- 15080 INSULATION FOR MECHANICAL SYSTEMS
- 15181 CHILLED WATER AND HOT WATER PIPING
- 15400 PLUMBING
- 15514 LOW PRESSURE WATER HEATING BOILERS (UNDER 235 KW)
- 15810 DUCTWORK AND DUCTWORK ACCESSORIES
- 15950 HVAC TESTING ADJUSTING BALANCING
- 15960 DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
- 16050 BASIC ELECTRICAL MATERIALS AND METHODS
- 16402 INTERIOR DISTRIBUTION SYSTEM
- 16510 INTERIOR LIGHTING
- 16670 LIGHTNING PROTECTION SYSTEM
See Paragraphs AC1-24 and AC1-25 and AC1-26 for the other applicable specifications.
AC1 - 25. ADDITIONAL SPECIFICATIONS
In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-24 of these Technical Specifications, the following Additional Specifications shall apply to this project:
- 23 01 30.51/A HVAC AIR DISTRIBUTION SYSTEM CLEANING
- 21 13 13/A FIRE PROTECTION SYSTEM, “SPRINKLER AND HOSE SYSTEM“
- 25 05 11/A CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
AC1 - 26. REVISED MASTER SPECIFICATIONS
In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-24 of these Technical Specifications, the following Revised Master Specifications shall apply to this project:
- 01101/R PROJECT SIGN
- 15400/R PLUMBING
- 15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
AC1 - 27. ADDITIONAL NORMS AND STANDARDS
FINAL (100% design) AC1 Page 21 of 94
Furthermore, the works included in this project shall be in accordance, when applicable norms like Aviano Design Guide 2011 Revision, NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.
All electronic devices included in the works shall be in accordance with:
- UFC 4-010-06 - CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS;
- Department of the Air Force Guidance Memorandum (DAFGM) 2021-32-01 - Civil Engineer Control
Systems Cybersecurity.
AC1 - 28. FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS
1. Once issued NTP, Contractor is required to contact CEAOR (0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (blank DD1354 and category codes list CATCODE_LIST_2010 are available at 31CES/CENM office during duty hours). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
2. All installed mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to D.Lgs- 17/2010, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed.
Furthermore, the electric equipment shall be in compliance with the Legislative Decree No.
81/2008 and subsequent modifications which apply the Directive 2014/35/EU (D.lgs. n.86 19/05/2016) and 2014/30/EU. Electrical tests and installation shall comply with Low 37/08 and CEI 64/8 Norm.
3. Contractor is required to perform F/A systems testing in accordance with CEF close out check list. Please find the checklist (FACILITY SYSTEMS FUNCTIONAL TEST CHECKLIST) attached to this document;
4. At the end of the work, the Contractor shall provide the Government with three copies of the following documents:
- Certificate of Compliance with Law No. No. 37 dated 22 January 2008, for the installation of the electrical and mechanical systems in a workmanlike manner, signed by the Contractor.
- Final Acceptance Test Certifications for electrical and mechanical systems signed by a Registered Engineer to be selected among three candidates proposed by the Contractor to the Contracting Officer in accordance with Law No. 37 dated 22 January 2008.
- For Warranty Management and Preventive Maintenance purpose, the closeout documentation shall be delivered IAW the Master Spec 01100 latest rev.;
- 3 set of AS BUILT drawings signed and stamped by qualified engineer and CD with Autocad and pdf electronic version of same drawings (AUTOCAD Release 2007 for drawings. Drawings shall be geospatially referenced using real world coordinates WGS- 1984 UTM 33N. 31CEP/CEPT section (0434-305488) will provide an AutoCAD drawing that is geospatially referenced for the contractor to use as a background);
- 3 copies of O&M manuals and CD with pdf electronic version of same documentation.
- All requested documents related to the fall arrest system, as for Regional Law Friuli
Venezia Giulia 24/2015 - Sicurezza nei lavori in quota.
Page 22 of 94 AC1 FINAL (100% design)
REPAIR FAC.1362 FOR OHWS & LMOC ASHE 21-1027
FINAL (100% design) MATERIAL SUBMITTAL SCHEDULE Page 23 of 94
SCHEDULE OF MATERIAL SUBMITTALS
LEGEND
E = Electronic Copy
(number) = number of paper copies, stamped and signed if required
E+# = Electronic Copy + number of paper copy, stamped and signed when required
FINAL (100% design) MATERIAL SUBMITTAL SCHEDULE Page 24 of 94
Schedule of Material Submittals
Work
Items Item n.
Appro-ved
Disap-proved
1 Demolition Plan E
2 New pipes 1 1 E E E E E E
3 Lean concrete C12/15 2a E
4 Reinforced concrete for slab/foundations 2b 3 E E E 3 E
5 Electrowelded net 10/20x20 2c 3 E E E 3
6 Concrete sidewalk 3 1 E E E E
7 Valve room storm drainage system 4a÷4f 1 E E E E E E
8 Tiles and baseboards 2a÷5 2 E E E E E
9 Internal partitions in gypsum board 6a÷6c 3 2 E
10 Mineral fiber suspended ceiling 7a÷7c 2 E E E E E E
11 Anty humidity wall treat 8a E E E E E
12 Internal wall painting 8b 3 3 E E E E E E
13 External doors and windows 9a÷11f 3 E 2 E E E E E E
14 Internal doors 9a÷11f E 2 E E E E E E
15 HPL partitions 14 2 E E E E E
16 Vapor barrier 16a E E
17 Double walkable white membrane 16b 3 E E E E E
18 Metal flashing 17a÷17c E 2 E E E E E F ie ld
R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn
S u s p e n s e
D a te
C o lo r
S e le c ti o n
C a ta lo g D a ta
S c h e d u le s L is ti n g s R e p o rt s P la n s
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
Number of Copies Required
D a te R e c e iv e d i n
C o n tr a c ti n g
Project Number:
ASHE 21-1027
Project Title:
REPAIR FAC.1362 FOR OHWS & LMOC
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
C e rt if ic a te o f
C o m p lia n c e
A. REPAIR WORKS
S h o p
D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t
(M S
D S
T e c h n ic a l D a ta
T e s t
R e p o rt s Date
Contractor
Notified
Part IIb Architectural
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
PART I - Demolitions, Excavations and Removals
PART II - Arch., Struct., Civil
Part IIa Civil
Item or Description of Item, Contract Reference, Type of Submittal
Items Item n.
Appro-ved
Disap-proved
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn
S u s p e n s e
D a te
C o lo r
S e le c ti o n
C a ta lo g D a ta
S c h e d u le s L is ti n g s R e p o rt s P la n s
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
Number of Copies Required
D a te R e c e iv e d i n
C o n tr a c ti n g
Project Number:
ASHE 21-1027
Project Title:
REPAIR FAC.1362 FOR OHWS & LMOC
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
C e rt if ic a te o f
C o m p lia n c e
A. REPAIR WORKS
S h o p
D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t
(M S
D S
T e c h n ic a l D a ta
T e s t
R e p o rt s Date
Contractor
Notified
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
Item or Description of Item, Contract Reference, Type of Submittal
19 Safety lifeline 18a÷18b 1 E E E E E
20 EIFS System 20a;24a 3 3 E E E E E E
21 Structural concrete 21b 3 E E E
22 Structural concrete steel 21c 3 E E E
23 Air Handling Unit 1 E E E E E E E E E
24 Heat pump 2 E E E E E E E E E
25 Supply Diffusers 6 E E E E E E E E E
26 Insulation 4; 7;9 E E E E E E
27 Ducts 5; 6; 8 E E E E
28 Pipes 3; 9 E E E E E
29 Valves 3; 9 E E E E E
30 Exhaust Fan 8 E E E E E E E E E
31 Radiators 9 E E E E E E
32 DALT & TAB 5; 6; 8 E E E
33 DDC 1; 2; 10 E E E E E E E E E
34 Pipes 3; 9 E E E E E
35 Pipes 1; 2; 7;
E E E E E E
36 Backflow preventer 5 E E E E E E E E E
37 Sprinkler Heads 8; 9; 10 E E E E E E E E E
PART IIIc - Fire Suppression System
PART IIIa - Mechanical, HVAC System
PART IIIb - Mechanical, Plumbing
Items Item n.
Appro-ved
Disap-proved
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn
S u s p e n s e
D a te
C o lo r
S e le c ti o n
C a ta lo g D a ta
S c h e d u le s L is ti n g s R e p o rt s P la n s
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
Number of Copies Required
D a te R e c e iv e d i n
C o n tr a c ti n g
Project Number:
ASHE 21-1027
Project Title:
REPAIR FAC.1362 FOR OHWS & LMOC
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
C e rt if ic a te o f
C o m p lia n c e
A. REPAIR WORKS
S h o p
D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t
(M S
D S
T e c h n ic a l D a ta
T e s t
R e p o rt s Date
Contractor
Notified
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
Item or Description of Item, Contract Reference, Type of Submittal
38 Inspector test connection 11 E E E E E E E E E
39 Post indicator valve 13 E E E E E
40 Seismic hangers 12 E E E E E E E E E
41 Electric heater 16 E E E E E E
42 Valves 3; 4; 5 E E E E E E E E E
43 Electrical Panel and circuit breakers 2 E E E E E E
44 Electrical Cables 8 E E E
45 Comm Cables 9 E E
46 Fire Alarm loop cable 7 E E
47 Galvanized steel pipes 11 E E
48 PVC conduits 10 E E
49 Power receptacles, disconnectors, power connections 3 E E E E
50 Lighting switches and sensors 4 E E
51 Ordinary and emergency Lighting fixtures 5 E E E E E E E E
52 Comm outlets 6 E E E E
53 Fire alarm system 7 E E E E E E E
54 Declaration of Conformity "DI.CO." issued as request by D.M. 37/2008.
Declarations shall be divided ias below:
- DI.CO. for the electrical sys
- DI.CO. for the fire alarm sys
- DI.CO for the telecomm sys
- DI.CO. for the mechanical sys
- DI.CO. for the sprinkler sys
3+E 3+E
FINAL DOCUMENTATION (FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS)
PART IV - Electrical
Items Item n.
Appro-ved
Disap-proved
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn
S u s p e n s e
D a te
C o lo r
S e le c ti o n
C a ta lo g D a ta
S c h e d u le s L is ti n g s R e p o rt s P la n s
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
Number of Copies Required
D a te R e c e iv e d i n
C o n tr a c ti n g
Project Number:
ASHE 21-1027
Project Title:
REPAIR FAC.1362 FOR OHWS & LMOC
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
C e rt if ic a te o f
C o m p lia n c e
A. REPAIR WORKS
S h o p
D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t
(M S
D S
T e c h n ic a l D a ta
T e s t
R e p o rt s Date
Contractor
Notified
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
Item or Description of Item, Contract Reference, Type of Submittal
55 Declaration of correct installation in accordance with DM 151/2011 fire reaction 3+E E 3+E
56 Lifline omolagtion documents as per art.6, co.1 lett. c) d) e) f) g) LR 24/2015 3+E 3 3+E
FINAL (100% design) REVISED & ADD. SPECIFICATIONS Page 29 of 94
REVISED AND ADDITIONAL SPECIFICATIONS
Page 30 of 94 REVISED & ADD. SPECIFICATIONS FINAL (100% design)
REVISED AND ADDITIONAL SPECIFICATIONS INDEX
SECTION 01101/R PROJECT SIGN
SECTION 15400/R PLUMBING
SECTION 15720/R AIR HANDLING AND DISTRIBUTION EQUIPMENT
SECTION 23 01 30.51/A HVAC AIR DISTRIBUTION SYSTEM CLEANING
SECTION 211313/A FIRE PROTECTION SYSTEM, “SPRINKLER AND HOSE SYSTEM“ . 45
SECTION 25 05 11/A CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS 57
FINAL (100% design) REVISED & ADD. SPECIFICATIONS Page 31 of 94
SECTION 01101/R
PROJECT SIGN
Delete sketch at the end of the Section and add:
EMERGENCY NUMBERS: 112 - 911
Page 32 of 94 REVISED & ADD. SPECIFICATIONS FINAL (100% design)
SECTION 15400/R
PLUMBING
Paragraph 2.4:
Delete: all
Delete: all
Add: 2.4 Domestic hot water storage
Provide vertical water heater for domestic hot water production with removable exchangers water heater. Vertical version with carbon steel body with inside ceramic coating. Externally treated with anti-rust paint. The water heater is insulated with 50mm PLF (polyester fiber reaction class B-s2, d0) and is covered with flexible PVC cladding with zipper. Tube bundle coil is made in stainless steel AISI 304. Anode electronic type for protection against galvanic currents, inspection flange, thermometer and safety valve. Anchors bolt and seismic retains included seismic calculations.
Paragraph 2.4.1:
Add:
Domestic hot water circulating pumps shall be electrically driven, single-stage, centrifugal, with mechanical seals, suitable for the intended service. Pump and motor shall be supported by the piping on which it is installed. The pump is of the canned rotor type, i.e. pump and motor form an integral unit without shaft seal and with only two gaskets for sealing. The bearings are lubricated by the pumped liquid. The pump has 3-step speed selector. The pump is characterized by:
Ceramic shaft and radial bearings.
Carbon axial bearing.
Stainless steel rotor can and bearing plate.
Corrosion-resistant impeller, Composite, PES/PP.
Stainless steel pump housing.
Motor shall be totally enclosed, and shall have sufficient wattage for the service required
FINAL (100% design) REVISED & ADD. SPECIFICATIONS Page 33 of 94
SECTION 15720/R
AIR HANDLING AND DISTRIBUTION EQUIPMENT
Paragraph 2.6.1 Factory-Fabricated Air Handling Units:
The unit shall be Eurovent Energy Efficiency Class A+ 2016. The unit will be provided equipped with paneloard (power and control). All controls shall be installed by manufacturer encased on the unit. Only the air dampers and valves shall be installed externally.
Paragraph 2.6.1.1 Casings:
Delete:
a. Casing sections 30 mm
a. Casing sections 50 mm.
Tightness class: L1 according to EN 1886: 2007.
Thermal break class T3
TBF Thermal Bridging Factor TB2
Deformation resistance class D1 (M)
Complies with the provisions of the standards EN 61000-6-2 and EN 61000-6-3
d. or rockwool insulation 50mm
Paragraph 2.6.1.4 Fans:
a. plug fan EFF1 class high-performance Plug fans with EC brushless motors
After paragraph 2.6.1.5
2.6.1.6 Energy recovery wheel
Rotary heat exchanger with thermal efficiency up to 85%. The heating requirement is met by automatically and variably regulating the rotor speed.
The rotary heat exchanger also recovers cooling energy.Purge sector, mounting plates and pressure measuring taps as standard; make sure that the extract air is not led into the supply air.
Performance EUROVENT certified
After paragraph 2.6.1.5
2.6.1.7 DDC connection
Page 34 of 94 REVISED & ADD. SPECIFICATIONS FINAL (100% design)
Unit delivered ready to be connected via TCP / IP, EIA-232, EIA-485, Bacnet / IP and Modbus
RTU interface or other protocol request by the design
Integrated WEB server for the direct management of the functions
Paragraph 2.7:
Paragraph 2.7.2:
2.7.2 Room ducted fan coil unit
Provide four pipe ducted type fan-coil units that include galvanized supporting structure s in galvanized sheet metal, 1 mm thick, consisting of two side shoulders and a rear wall insulated with a 3 mm thick mattress, in closed cell polyethylene class M1.
Regenerable honeycomb polypropylene filter. The frame, in galvanized sheet metal, is inserted in guides fixed on the internal structure that allow easy extraction for periodic cleaning.
Fan unit: made up of particularly silent double intake centrifugal fans, with statically and dynamically balanced aluminum or plastic impellers, directly keyed onto the motor shaft
Electric motor: single-phase five-speed type, mounted on anti-vibration elastic supports and with permanently inserted capacitor, internal thermal protection with automatic reset, protection degree IP 20 and class B
Heat exchange coil: it is built with copper pipes and aluminum fins fixed to the pipes with mechanical expansion procedure. The main battery and any additional battery are equipped with two Ø 1/2 "female gas connections. The collectors are equipped with air vents and water drains
Ø 1/8 "gas.
The coils are reversible type: the side of the connections can therefore be reversed during assembly on site.
Condensate collection tray: in plastic material (ABS UL94 HB) made in an L-shape and fixed to the internal structure; the basin is insulated with a 3 mm thick mattress in closed cell polyethylene class M1
The condensate drain pipe is external Ø 15mm.
Obtain sound power level data or values for these units according to test procedures based on
UNI EN 16583. Values obtained for the standard cabinet models are acceptable for concealed models without separate test provided there is no variation between models as to the coil configuration, blowers, motor speeds, or relative arrangement of parts. Provide automatic valves and controls. Fasten each unit securely to the building structure. Provide units with capacity indicated. Provide room fan-coil units that are certified as complying with Eurovent 6/3, UNI
EN 1397.
Fan coil complies with the European regulation (EU) N.327 / 2011 which requires particularly low power consumption in relation to the aeraulic performance provided.
2.7.2 Room ducted fan coil unit
Provide four pipe ducted type fan-coil units that include galvanized supporting structure s in galvanized sheet metal, 1 mm thick, consisting of two side shoulders and a rear wall insulated with a 3 mm thick mattress, in closed cell polyethylene class M1.
Regenerable honeycomb polypropylene filter. The frame, in galvanized sheet metal, is inserted in guides fixed on the internal structure that allow easy extraction for periodic cleaning.
FINAL (100% design) REVISED & ADD. SPECIFICATIONS Page 35 of 94
Fan unit: made up of particularly silent double intake centrifugal fans, with statically and dynamically balanced aluminum or plastic impellers, directly keyed onto the motor shaft
Electric motor: Brushless sensorless synchronous direct current electronic motor with permanent magnets of the three-phase BLAC type, controlled with current reconstructed according to a sine wave from a single-phase inverter electronic board 220-240 V, 50-60 Hz.
Heat exchange coil: it is built with copper pipes and aluminum fins fixed to the pipes with mechanical expansion procedure. The main battery and any additional battery are equipped with two Ø 1/2 "female gas connections. The collectors are equipped with air vents and water drains
Ø 1/8 "gas.
The coils are reversible type: the side of the connections can therefore be reversed during assembly on site.
Condensate collection tray: in plastic material (ABS UL94 HB) made in an L-shape and fixed to the internal structure; the basin is insulated with a 3 mm thick mattress in closed cell polyethylene class M1
The condensate drain pipe is external Ø 15mm.
Obtain sound power level data or values for these units according to test procedures based on
UNI EN 16583. Values obtained for the standard cabinet models are acceptable for concealed models without separate test provided there is no variation between models as to the coil configuration, blowers, motor speeds, or relative arrangement of parts. Provide automatic valves and controls. Fasten each unit securely to the building structure. Provide units with capacity indicated. Provide room fan-coil units that are certified as complying with Eurovent 6/3, UNI
EN 1397.
Fan coil complies with the European regulation (EU) N.327 / 2011 which requires particularly low power consumption in relation to the aeraulic performance provided.
PROJECT: ASHE 21-1027 REPAIR FAC.1362 FOR OWHS AND LMOC
Page 36 of 94 REVISED & ADD. SPECIFICATIONS FINAL (100% design)
ADDITIONAL SPECIFICATIONS
FINAL (100% design) REVISED & ADD. SPECIFICATIONS Page 37 of 94
SECTION 23 01 30.51/A
HVAC AIR DISTRIBUTION SYSTEM CLEANING
PART 1 GENERAL
1.1 SUMMARY
The contractor will perform a perfect cleaning and disinfection for all HVAC air distribution system in the buildings #1426-1427. In the air distribution system is included all air HVAC equipment (fan coil, unit heater, air handling unit, ….) ducts (exhaust, outside air, return and exhaust), outlets, and al ductwork devices (fire ademper, dampers,….).
1.2 REFERENCES
Following current standards and publications of issues currently in effect form part of this specification to extent specified:
AMERICAN NATIONAL STANDARDS INSTITUTE/INSTITUTE OF INSPECTION
CLEANING AND RESTORATION CERTIFICATION (ANSI/IICRC).
ANSI/IICRC S520 Standard for Professional Mold Remediation.
NATIONAL AIR DUCT CLEANERS ASSOCIATION (NADCA):
ACR, The NADCA Standard for Assessment, Cleaning & Restoration of HVAC Systems (2021).
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
NFPA 90A Standard for the Installation of Air-Conditioning and
Ventilating Systems.
NFPA 90B Standard for the Installation of Warm Air Heating and
Air-Conditioning Systems.
NORTH AMERICAN INSULATION…