ASHE 21-1027 DRAWINGS 40-71.pdf
PDF 8 MB Posted
- Solicitation number
- FA5682-F1F3A22322A001
About this file
This document provides details for a federal construction contract opportunity. The solicitation is for project ASHE 21-1027 to repair Facility 1362 at Aviano Air Base in Italy for overhead water storage and liquid munitions operations centers. Interested vendors must have a current Standard Occupational Classification certification in category OG01. The construction value is estimated between $500,000 to $1,000,000. The scope of work includes repairs at the specified facility as detailed in the technical specifications. A site visit will be scheduled for interested vendors to inspect the location. The solicitation is expected to be issued in January 2023. Responses must be submitted in accordance with the instructions in the forthcoming solicitation. The work will be performed in Italy under Defense Federal Acquisition Regulation Supplement clauses for contracts performed overseas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AVIANO MASTERSPECS 2020.pdf | ||
| ASHE 21-1027 PSC.pdf | ||
| ANNEX-01 - BLDG ACCEPTANCE CKLT.pdf | ||
| ASHE 21-1027 CCEB.xlsx | XLSX spreadsheet | |
| ASHE 21-1027 DRAWINGS 1-39.pdf | ||
| ASHE 21-1027 TECH-SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
M-702
NEW CONDITION - CONTROL SCHEME
STATO DI PROGETTO - SCHEMA DI REGOLAZIONE
GA
S
LEGEND / LEGENDA DEMOLITION WORK KEYNOTE/ NOTA CHIAVE DEMOLIZIONI
A
B
C
D
1 2 3 4 5
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu B
C
D
1 2 3 4 5
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
PD-101
EXISTING CONDITION - GROUND FLOOR PLAN
STATO DI FATTO - PIANTA PIANO TERRA
LEGEND / LEGENDA
NEW WORK KEYNOTE/ NOTA CHIAVE NUOVI LAVORI
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
NEW CONDITION - GROUND FLOOR PLAN
STATO DI PROGETTO - PIANTA PIANO TERRA
P-101
FIRE PROTECTION - GENERAL NOTES
MUST CONFORM
DEVONO ESSERE CONFORMI
IMPIANTO ANTINCENDIO - NOTE GENERALI
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-001
FIRE PROTECTION - GENERAL NOTES
IMPIANTO ANTINCENDIO - NOTE GENERALI
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-002
FIRE PROTECTION - GENERAL NOTES
IMPIANTO ANTINCENDIO - NOTE GENERALI
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-003
SYMBOLS / SIMBOLI
PIPE SUPPORTS / SUPPORTI PER TUBAZIONIFIRE PROTECTION SYSTEM / IMPIANTO ANTINCENDIO FLOW DIAGRAM / DIAGRAMMA DI FLUSSO
GENERAL IDENTIFICATION / IDENTIFICAZIONI GENERALI
A1
A1
A1
N
CLASSIFICATION OF HAZARD / CLASSIFICAZIONE DI RISCHIO
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-004
150x50h130
GAS REDUCER
GAS
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
FD-101
EXISTING CONDITION - GROUND FLOOR PLAN
STATO DI FATTO - PIANTA PIANO TERRA
KEY PLAN
PIANTA RIFERIMENTO
GRAPHIC SCALE
DEMOLITION WORK KEYNOTE
NOTA CHIAVE DEMOLIZIONI
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-101
GROUND FLOOR PLAN
PIANTA PIANO TERRA
ATTIC FLOOR PLAN
PIANTA SOTTOTETTO
KEY PLAN
PIANTA RIFERIMENTO
GRAPHIC SCALE
1"
1 "
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-102
NEW CONDITIONS - GROUND FLOOR PLAN
PROGETTO - PIANTA PIANO TERRA
NEW CONDITIONS - ATTIC FLOOR PLAN
PROGETTO - PIANTA SOTTOTETTO
KEY PLAN
PIANTA RIFERIMENTO
GRAPHIC SCALE
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
SPRINKLER COVERAGE AREA
AREA DI COPERTURA UGELLI
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-103
NEW CONDITIONS - GROUND FLOOR PLAN
PROGETTO - PIANTA PIANO TERRA
NEW CONDITIONS - ATTIC FLOOR PLAN
PROGETTO - PIANTA SOTTOTETTO
KEY PLAN
PIANTA RIFERIMENTO
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-104
NEW CONDITIONS - ATTIC FLOOR PLAN
PROGETTO - PIANTA SOTTOTETTO
KEY PLAN
PIANTA RIFERIMENTO
GRAPHIC SCALE
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
±0.00
+36.5
+325
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-301
NEW CONDITIONS - SECTION A-A
PROGETTO - SEZIONE A-A
NEW CONDITIONS - SECTION B-B
PROGETTO - SEZIONE B-B
GRAPHIC SCALE
NEW WORK KEYNOTE
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-401
NEW CONDITIONS - VALVE ROOM PLAN
PROGETTO - PIANTA LOCALE VALVOLE
GRAPHIC SCALE
NEW CONDITIONS - VALVE ROOM SECTION A-A
PROGETTO - SEZIONE A-A LOCALE VALVOLE
NEW CONDITIONS - VALVE ROOM SECTION B-B
PROGETTO - SEZIONE B-B LOCALE VALVOLE
THRUST BLOCKS
BLOCCHI REGGISPINTA
SLEEVES
ATTRAVERSAMENTI
STANDARD PENDENT SPRINKLER
SPRINKLER PENDENT STANDARD
DRAIN TEST DETAIL
TERMINALE DI PROVA
POST INDICATOR VALVE
VALVOLA DI SEZIONAMENTO CON INDICATORE DI POSIZIONE
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-501
W
AL
L
PA
RE
TE
6"
DN150
AV
TYPICAL WET PIPE ALARM VALVE
GRUPPO VALVOLA DI ALLARME TIPICO TIPO AD UMIDO
WATER MOTOR GONG
CAMPANA IDRAULICA DI ALLARME
TYPICAL RISER ENTRANCE TO FIRE PROTECTION SYSTEM
DETTAGLIO TIPICO ENTRATA MONTANTE ANTINCENDIO
FLUSHING POINT
LAVAGGIO TUBAZIONE
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-502
1 2 3
WATERFLOW SWITCH
FLUSSOSTATO
COUPLING INSTALLATION INSTRUCTIONS
ISTRUZIONI PER INSTALLAZIONE DEI GIUNTI
FLEXIBLE COUPLINGS
GIUNTI FLESSIBILI
RISER 4-WAY BRACING DETAIL
PARTICOLARE CONTROVENTO 4-VIE MONTANTI
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-503
114 112 212
114 112 212
LATERAL EARTHQUAKE BRACE
SUPPORTO ANTISISMICO LATERALE
LONGITUDINAL EARTHQUAKE BRACE
SUPPORTO ANTISISMICO LONGITUDINALE
ANTISEISMIC HANGERS FOR TERMIANL BRANCHES RESTRAINT
SUPPORTO ANTISISMICO PER TERMINALI DIRAMAZIONI
CONCRETE STATIC SUPPORTS
SUPPORTI STATICI SU CALCESTRUZZO
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-504
SEISMIC SEPARATION ASSEMBLY
GIUNTO ANTISISMICO
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
F-505
6"
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
F-601
SPRINKLER SYSTEM FLOW DIAGRAM
SCHEMA DI FLUSSO IMPIANTO SPRINKLER
NEW WORK KEYNOTE
NOTE: INSTALLATION HEIGHT OF THE RECEPTACLES
NOTA: ALTEZZA D'INSTALLAZIONE DELLE PRESE
RULES ABOUT CONDUITS
REGOLE SULLE TUBAZIONI
EXISTING CABLES
CAVI ESISTENTI
NOTES / NOTE
AS BUILT DRAWINGS AND FINAL DOCUMENTS
DISEGNI E DOCUMENTI FINALI
LEGENDA SIMBOLISYMBOL LEGEND /
FIRE ALARM SYSTEM LEGEND
LEGENDA IMPIANTO DI RIVELAZIONE INCENDI
O
LIGHTING SYSTEM LEGEND
LEGENDA IMPIANTO DI ILLUMINAZIONE
POWER RECEPTACLES LEGEND
LEGENDA PRESE ENERGIA
10/16A
UNEL
EDP
IR
16A
EDP
TELECOMUNICATION SYMBOL LEGEND
LEGENDA SIMBOLI TELECOMUNICAZIONI
1/EL
2/EL
MAIN DISTRIBUTION LEGEND
LEGENDA DISTRIBUZIONE PRICIPALE
NN
UNEL
T
QS1
C
POWER PANELS / SWICHES LEGEND
LEGENDA QUADRI ELETTRICI / INTERRUTTORI
0V
UPS+BATTERY FACP
FATOFOF
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
E-001
GAS
1 2 3
1 2 3
4 4 4
4 4 4
4 4 4
EXISTING PANEL
10/16A
UNEL
0V
0V
0V
0V
120V120V120V
10/16A UNEL10/16A UNEL 10/16A UNEL
UNEL10/16A
UNEL10/16A
10/16AUNEL
UN
EL
/16
A
UN
EL
/16 A
EX
IS
TIN
G
PA
NE
L
GAS
UN
EL
/16
A
MDP
PANEL C
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
ED-101
GENERAL NOTES
NOTE GENERALI
GRAPHIC SCALE
SCALA GRAFICA
GROUND FLOOR PLAN - LIGHTING SYSTEM
PIANTA PIANO TERRA - IMPIANTO ILLUMINAZIONE
GROUND FLOOR PLAN - POWER SYSTEM
PIANTA PIANO TERRA - IMPIANTO ELETTRICO
DEMOLITION WORK KEYNOTE
LEGEND/LEGENDA
10/16A UNEL
UNEL
10/16A
EF-1
UN
EL
/16
A
10/16A UNEL 10/16A UNEL
10/16A UNEL
1+2
NIPR
1+2
SIPR
MDP
UNELUNEL
UN
EL
UN
EL
MEP #113
4 4 4 4 4 4
3 3 3 3 3 3
2 2 2 2 2 2
1 1 1 1 1 1
2/EL
1/EL
1/EL
1 2 3
1 2 3
5 5
1/EL
1/EL1/EL
2/
EL
ROOM SCHEDULE/TABELLA STANZE
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
E-101
NEW WORK KEYNOTES
NOTA CHIAVE NUOVI LAVORI
GRAPHIC SCALE
SCALA GRAFICA
GROUND FLOOR PLAN - DISTRIBUTION SYSTEM
PIANTA PIANO TERRA - IMPIANTO FM
GROUND FLOOR PLAN - LIGHTING SYSTEM
PIANTA PIANO TERRA - IMPIANTO ILLUMINAZIONE
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
EP-101
600 mm
SISTEMA G 30M
iSW iIL iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC60 Vigi iC60 iC40 Vigi iC40 iC40 Vigi iC40 iC40 Vigi iC40
MEP #113
Icc 10kA (595x1730x205mm LxHxP)
NOTESNOTES
For the correct interpretation of the drawings a joint reading of all the project documents is required.
The technical characteristcs defined in the drawings shall be the minimun required.
The voltage drops are always calculated from the start of the LV network.
The line current of the UPS takes into account the battery charger function.
The current project has being dimensioned and documented according the following reference standards:
- CEI 64-8
- CEI 0-21
Features of Micrologic control units:
- Micrologic 2.x: LI protection
- Micrologic 5.x: LSI protection
- Micrologic 6.x: LSIG protection
- Micrologic 7.x: LSIV protection
- Micrologic E: measurement of I, V, P, E, PF
- Micrologic H measurement of I, V, P, E, f, PF, Harmonics, THD
UPSTREAM PLANT
VOLTAGE [V] FREQ. [Hz]
SWITCHBOARD PERSPECTIVE CURRENT [kA]
SWITCHBOARD RATED CURRENT [A]
NEUTRAL SYSTEM
BUSBAR SIZE
In [A] Icc [kA]
STRUCTURE
INSULATION CLASS IP
ORDER
PURCHASER
SWITCHBOARD
SWITCHBOARD CHARACTERISICS
REFERENCE STANDARD
MOULDED CASE CIRCUIT BREAKERS
MINIATURE CIRCUIT BREAKERS
STRUCTURE
CEI EN 60947-2
CEI EN 60947-2
CEI EN 60898
CEI EN 60439-1
CEI 23-48
CEI 23-49
CEI 23-51
BLDG #1362
ELECTRICAL
ELECTRICAL
Mechanical EP #113
[MDP]
400 50
9,8
TNS
100 10 metallic
I 40
X
X
N
Id I >
M x U < U >
HzVA kWh
SYMBOLS
MANUAL
CONTROL
TOROIDFUSEOVERLOAD CUT
OUT
RESIDUAL
CURRENT
PROTECTION
MAGNETIC
PROTECTION
THERMAL
PROTECTION
SWITCHDISCONNECTORCIRUIT BREAKER
SHUNT UNDERVOLTAGE
RELEASE
AUXILIARY
CONTAC
KEYLOCK ON
POSITION
KEYLOCK OFF
POSITION
REMOVABLE
EQUIPMENT
INTERLOCKROTARY HANDLETRIP FREEAUTOMATIC
CONTROL
CLOCKIMPULSE RELAYNC CONTACTS
CONTACTOR
MANUAL
CONTROL
CONTACTOR
NO CONTACTS
CONTACTOR
METERFREQUENCY
METER
VOLTMETERAMMETERCHANGE OVER
SWTCH (FOR
MEASUREMENT)
SURGE
PROTECTIVE
DEVICE
TRANSFORMERSTAR DELTA
STARTER
VARIABLE SPEED
DRIVE
SOFT STARTERINTERLOCKED
SOCKET WITH
FUSES
SOCKETUNINTERRUPTED
POWER SYSTEM
(UPS)
ASTRONOMIC
CLOCK
TWILIGHT SWITCH
DISCONNECTOR
L1L2L3NPE
generale switch disconnector
-QS1.1
1 L1L2L3N generale switch disconnector iSW
EPR 11
1x25 1x16 1x16
88,5 101,3 400 51,18 2,2 9,8 23 0,8
FG16R16-0,6/1 kV Cca-s3,d1,a3
2 L1L2L3NPE
Three-phase voltage indicator light
STI 3P+N Fus NFC (10,3x38) qn 1 iIL Spia singola Rossa Lampada spia 110-230V
EPR
400 0
Id
-QF1.1.2
3 L1NPE
lighting
(existing cables) iC60 a
2P 10
C
Vigi AC 0,03 Istantaneo
-WC1.1.2
EPR 13
1x1,5 1x1,5 1x1,5
4,8 27 1,5 3,3 1 0,8
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.3
4 L2NPE
outlet 220V prese 220V
(existing cables) iC60 a
2P 16
C
Vigi AC 0,03 Istantaneo
-WC1.1.3
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.4
5 L3NPE
burner bruciatore
(existing cables) iC60 N
2P 16
D
Vigi AC 0,3 Istantaneo
-WC1.1.4
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.5
6 L3NPE
spare riserva
(existing cables) iC60 N
2P 16
D
Vigi AC 0,3 Istantaneo
-WC1.1.5
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.6
7 L2NPE
spare
(existing cables) iC60 a
2P 20
C
Vigi AC 0,3 Istantaneo
-WC1.1.6
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.7
8 L1NPE
PMP 1
(existing cables) iC60 a
2P 16
C
Vigi AC 0,3 Istantaneo
-WC1.1.7
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
A
A
Id
-QF1.1.8
9 L2NPE
PMP 2
(existing cables) iC60 a
2P 16
C
Vigi AC 0,3 Istantaneo
-WC1.1.8
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.9
10 L1L2L3NPE
CHIL
(existing cables) iC60 N
4P 40
C
Vigi AC 0,3 Istantaneo
-WC1.1.9
EPR 13
1x4 1x4 1x4
33,7 45 1,9 8,4 1 0,8
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.10
11 L1L2L3NPE
AIR
(existing cables) iC60 N
4P 20
C
Vigi AC 0,3 Istantaneo
-WC1.1.10
EPR 13
1x1,5 1x1,5 1x1,5
17,6 24 1,5 6,8 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
12 L1L2L3NPE
SIEMENS (existing) landis&staefa RWC32
(existing cables) STI 1P+N Fus NFC (10,3x38)
Id
-QF1.1.12
13 L1L2L3NPE
outlet 400V prese 400V
(existing cables) iC60 N
4P 32
C
Vigi AC 0,03 Istantaneo
-WC1.1.12
EPR 13
1x2,5 1x2,5 1x2,5
11,2 33 1,7 7,8 1 0,8
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.13
14 L1NPE
G.A.P.
(existing cables) iC60 a
2P 16
C
Vigi AC 0,3 Istantaneo
-WC1.1.13
EPR 13
1x1,5 1x1,5 1x1,5
9,7 27 1,5 3,3 1 0,9
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.14
15 L2NPE
AUX
(existing cables) iC60 a
2P 10
C
Vigi AC 0,03 Istantaneo
-WC1.1.14
EPR 13
1x1,5 1x1,5 1x1,5
1 27 1,5 3,3 1 0,8
FG16R16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.15
16 L2NPE
AUX 24V (existing transformer)
(existing cables) iC60 a
2P 10
C
Vigi AC 0,03 Istantaneo
V out 24V-100VA
17 L1L2L3NPE
SIEMENS (existing) landis&staefa RWC32
(existing cables) STI 1P+N Fus NFC (10,3x38)
A A
Id
-QF1.1.17
18 L1L2L3NPE
HP-1 HEAT PUMP
POMPA DI CALORE
(NEW CABLES)
iC60 N
4P 50
C
Vigi AC 0,3 Istantaneo
-WC1.1.17
EPR 12
1x10 1x10 1x10
44,4 53,3 0,5 2,2 50 2,6
FG16OR16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.18
19 L1L2L3NPE
AHU-1
(NEW CABLES)
iC40 N
3P+N 20
C
Vigi AC 0,3 Istantaneo
-WC1.1.18
EPR 12
1x4 1x4 1x4
8,1 30 0,2 1 50 1,6
FG16OR16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.19
20 L1L2L3NPE
POST-HEATING
batteria post-risc.
(NEW CABLES)
iC40 N
3P+N 25 C
Vigi AC 0,3 Istantaneo
-WC1.1.19
EPR 12
1x6 1x6 1x6
15,8 39 0,3 1,4 50 1,9
FG16OR16-0,6/1 kV Cca-s3,d1,a3
Id
-QF1.1.20
21 L3NPE
EF-1
estrattore bagno
(NEW CABLES)
iC60 a
2P 10 C
Vigi AC 0,3 Istantaneo
-WC1.1.20
EPR 03A
1x1,5 1x1,5 1x1,5
0,8 22 0,1 0,2 50 1,2
FG16OR16-0,6/1 kV Cca-s3,d1,a3
51,18 1 2 2 2 2 2
2 21 11 7 2 0,2 25,2 4,5 9 0,16
NUMERAZIONE MORSETTI
DISTRIBUZIONE
MODELLO
NOTE
dV TOTALE [%]LUNGHEZZA [m]
FONDO LINEA Icc max [kA]Icc min [kA] P [kW]Un [V] Iz [A]Ib [A]
POSA
SEZIONE FASE-N-PE/PEN [mmq]
TIPO ISOLAMENTOCONDUTTURA
TIPOALTRE APP.
In [A]N. POLIFUSIBILE Irth [A]TIPOTERMICO
In [A]N. POLIBOBINA [V]
CLASSETIPO
TELERUTTORE
CONTATTORE
tdn [ms]Idn [A]
CLASSETIPODIFFERENZIALE
Ig [A] tg [s] Ii [A] tsd [s]Isd [A] tr [s]Ir [A]
CURVA/SGANCIATORE
In [A]N. POLI
INTERRUTTORE Icu [kA] / Icn [A]
TIPO APPARECCHIO
DESCRIZIONE CIRCUITO
NUMERAZIONE CIRCUITO
* Selettività ** Filiazione (valore in kA)
Icu - CEI EN 60947-2
Icn - CEI EN 60898-1
NUMERAZIONE MORSETTI
DISTRIBUZIONE
MODELLO
NOTE
dV TOTALE [%]LUNGHEZZA [m]
FONDO LINEA Icc max [kA]Icc min [kA] P [kW]Un [V] Iz [A]Ib [A]
POSA
SEZIONE FASE-N-PE/PEN [mmq]
TIPO ISOLAMENTOCONDUTTURA
TIPOALTRE APP.
In [A]N. POLIFUSIBILE Irth [A]TIPOTERMICO
In [A]N. POLIBOBINA [V]
CLASSETIPO
TELERUTTORE
CONTATTORE
tdn [ms]Idn [A]
CLASSETIPODIFFERENZIALE
Ig [A] tg [s] Ii [A] tsd [s]Isd [A] tr [s]Ir [A]
CURVA/SGANCIATORE
In [A]N. POLI
INTERRUTTORE Icu [kA] / Icn [A]
TIPO APPARECCHIO
DESCRIZIONE CIRCUITO
NUMERAZIONE CIRCUITO
* Selettività ** Filiazione (valore in kA)
Icu - CEI EN 60947-2
Icn - CEI EN 60898-1
NUMERAZIONE MORSETTI
DISTRIBUZIONE
MODELLO
NOTE
dV TOTALE [%]LUNGHEZZA [m]
FONDO LINEA Icc max [kA]Icc min [kA] P [kW]Un [V] Iz [A]Ib [A]
POSA
SEZIONE FASE-N-PE/PEN [mmq]
TIPO ISOLAMENTOCONDUTTURA
TIPOALTRE APP.
In [A]N. POLIFUSIBILE Irth [A]TIPOTERMICO
In [A]N. POLIBOBINA [V]
CLASSETIPO
TELERUTTORE
CONTATTORE
tdn [ms]Idn [A]
CLASSETIPODIFFERENZIALE
Ig [A] tg [s] Ii [A] tsd [s]Isd [A] tr [s]Ir [A]
CURVA/SGANCIATORE
In [A]N. POLI
INTERRUTTORE Icu [kA] / Icn [A]
TIPO APPARECCHIO
DESCRIZIONE CIRCUITO
NUMERAZIONE CIRCUITO
* Selettività ** Filiazione (valore in kA)
Icu - CEI EN 60947-2
Icn - CEI EN 60898-1
UNEL UNEL 10/16A UNEL
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
E-601
1/EL
2/EL 2/EL Zumtobel Set 42185945 CROSSIGN 110 P MSC E3D ERI WH + 22168607 CROSSIGN 110 SP2E002D [STD] ( 152 lm, 6.8 W; 1H)
ILLUMINAZIONE ORDINARIA/ ORDINARY LIGHTING FIXTURES
ILLUMINAZIONE EMERGENZA + SEGNALAZIONE/EMERGENCY AND EXIT SIGN LIGHTING
FIXTURES
DETAIL POWER SOCKETS
PARTICOLARE PRESE ELETTRICHE
LIGHTING FIXTURES SCHEDULE
TABELLA CORPI ILLUMINANTI
1/EL Zumtobel 42185686 RESCLITE PRO MRCR ANT HP E3D WH [STD] (370 lm, 8.2 W; 1H)
Thorn 96634488 BETA 3 4100-840 HF LRO Q600 (33.6W; 4100lm; UGR<19; 4000K; 595x595x34mm; classe II; IP44; IK03)
Thorn 96629367 KAT RD 2000-840 HF (1950 lm; 16.3 W)
NOTE/NOTA
GAS
PP
OPP
U
PS
U
PS
U
PS
U
PS
U
PS
UP
S
BA
TT
ER
Y
EDPEDPEDPEDPEDPEDPEDPEDP
EDP
EDPEDPEDP
EDP
EDP
EDP
EDP
EDP
EDP
EDP
EDP
ED
P
ED
P
ED
P
ED
P
ED
P
ED
P
ED
P
ED
P
EDPEDPEDP
EDPEDP
OF
OF
EDPEDPEDPEDP EDPEDPEDPEDP
EDPEDP
EDPEDP
EDPEDP
EDPEDP
EDP EDP EDP EDP
ED
P
ED
P
ED
P
ED
P
EDPEDP
EDPEDP
EDPEDP
ED
P
ED
P
ED
P
ED
P
EDPEDPEDPEDP
EDPEDPEDPEDP
EDP EDP EDP EDP
OF
EDP
EDP
EDP
A
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
GRAPHIC SCALE
SCALA GRAFICA
TD-101
GROUND FLOOR PLAN - TELECOMMUNICATION SYSTEM
PIANTA PIANO TERRA - IMPIANTO DATI
GENERAL NOTES
NOTE GENERALI
PP
A
EDP
4x
PP
EDP
A
OF
A
EDP
PP
OPP
EXISTING COMMUNICATION SYSTEM WIRING DETAILS
DETTAGLIO DI COLLEGAMENTO DELL'IMPIANTO DATI ESISTENTE
PPOPP
A A
TPP
EXISTING COMMUNICATION ROOM
COMM ROOM ESISTENTE
EXISTING EQUIPMENT COMMUNICATION ROOM PICTURES
FOTOGRAFIE APPARECCHIATURE COMM ROOM ESISTENTE
DEMOLITION WORK KEYNOTE
EDP
4x
NIPR
ED
P
4x NI
PR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4xNIPR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4xNIPR
EDP
4xNIPR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4x
NIPR
EDP
4x
SIPR
EDP
4xNIPR
EDP
4xNIPR
EDP
NIPR
OF
NIPR
ED
P
4x NI
PR
ED
P
4x NI
PR
SIPR
EDP
4x
NIPR
1+2
NIPR
1+2
SIPR
NIPR
NIPR EDP
4x
SIPR
ED
P
4x SI
PR
EDP
4x
SIPR
EDP
4x
NIPR
ED
P
4x SI
PR EDP
4xSIPR
EDP
4x
NIPR
OF
NIPR
OF
NIPR
EDP
NIPR
MDP
TMGB
ROOM SCHEDULE/TABELLA STANZE
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
GRAPHIC SCALE / SCALA GRAFICA
T-101
GROUND FLOOR PLAN - DATA SYSTEM
PIANTA PIANO TERRA - IMPIANTO DATI
ROOF FLOOR PLAN - DATA SYSTEM
PIANTA COPERTURA - IMPIANTO DATI
T-501
GENERAL NOTES
NOTE GENERALI
T-501
9.7
32.1
A SECTION
A
SEZIONE
B
9.7
32.1
B
SECTION
SEZIONE
(CAT.6 UTP/FTP)
EDP
4x
+36.5
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
T-501
DETAILS OF FLOOR BOX
DETTAGLIO TORRETTA INCASSATA A PAVIMENTO
DETAILS OF 12 MODULES BOX
DETTAGLIO SCATOLA PORTAFRUTTI VERTICALE 12 MODULI
DETAILS OF DATA SOCKETS
DETTAGLIO PRESE DATI
FLOOR BOXES IN #109 ROOM
INGRANDIMENTO DELLE TORRETTE A PAVIMENTO NELLA STANZA 109
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
NIPREDP
4x
SIPR OF
NIPR
SIPR
NEW COMMUNICATION SYSTEM WIRING DETAILS
NUOVO DETTAGLIO DI COLLEGAMENTO DELL'IMPIANTO DATI
1+2
NIPR
1+2
NIPR EDP
4x
SIPR EDP
4x
NIPR
0.8
IMPIANTO DATI - NOTE
DATA SYSTEM - NOTES
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
T-502
GENERAL NOTES
NOTE GENERALI
DETAIL OF SIPR RACK
DETTAGLIO DEL RACK SIPR
DETAIL OF NIPR RACK
DETTAGLIO DEL RACK NIPR
DETAIL OF NIPR SPARE RACK
DETTAGLIO DEL RACK NIPR DI RISERVA
MAIN TELECOMMUNICATION GROUND BAR (TMGB) -
MAIN COMMUNICATION ROOM
BARRA DI TERRA PRINCIPALE IMPIANTO TELECOMUNICAZIONI:
STANZA COMUNICAZIONI PRINCIPALE
DETAILS TO CONNECT THE GROUNDING SYSTEM
DETTAGLIO DI COLLEGAMENTO DELL'IMPIANTO DI
TERRA
DETAILS TO CONNECT THE GROUNDING SYSTEM
DETTAGLIO DI COLLEGAMENTO DELL'IMPIANTO DI TERRA
GAS REDUCER
GAS
T T
T T
O
O
T T
T
O
FACP
FAT
O
O
O
O
O
O
O
O
O O
T
T T
TT
T T
T
T
T
T T
T
O
T
T
T
T
T
T
T
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
FAD-101
GENERAL NOTES
NOTE GENERALI
GRAPHIC SCALE
SCALA GRAFICA
GROUND FLOOR PLAN - FIRE ALARM SYSTEM
PIANTA PIANO TERRA - IMPIANTO RIVELAZIONE INCENDI
DEMOLITION WORK KEYNOTE
O O
FACP
FAT
O
O
O
O
O
O
O
O
O O
T
T T
TT
T T
T
T
T
T T
T
O
T
T
T
T
T
O
O
O
O
O
O
O O
O
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
FA-101
GENERAL NOTES
NOTE GENERALI
GRAPHIC SCALE
SCALA GRAFICA
GROUND FLOOR PLAN - FIRE ALARM SYSTEM
PIANTA PIANO TERRA - IMPIANTO RIVELAZIONE INCENDI
NEW WORK KEYNOTES
System Inputs
Control Unit Annunciation Notification Fire Safety Control
Required
System Outputs
Supplementary
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
FA-701
0x h1
GA
S
RE
DU
CE
R
GA
S
ROOM SCHEDULE/TABELLA STANZE
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 1602158
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
NEW CONDITION - GROUND FLOOR PLAN
STATO DI PROGETTO - PIANTA PIANO TERRA
LS101
GENERAL NOTE
NOTE GENERALI LEGEND / LEGENDA
File details come from the government source that posted it. Updated .