ASHE 21-1023_Tech SpecsR1.pdf
PDF 3 MB Posted
- Solicitation number
- FA568223R0006
About this file
This pre-solicitation notice provides details for an upcoming construction solicitation for repair work at Aviano Air Base in Italy. The project scope involves repairing the HVAC system in Building 1403, Area F, with work estimated to be valued between $500,000 and $1,000,000. Interested vendors must hold a current System for Award Management registration and Standard Occupational Classification code certification for the cited category, OG11, at time of proposal submission and award. A site visit will be scheduled prior to issuance of the solicitation anticipated for March 2023. Proposals are due in accordance with the standard form specified in the forthcoming solicitation. The work will be conducted in Italy according to Defense Federal Acquisition Regulation Supplement provisions and performed in compliance with relevant Italian health and safety standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE 21-1023 PSC.pdf | ||
| ASHE 21-1023_Drawings.pdf | ||
| ASHE 21-1023 CCEB REV1.xlsx | XLSX spreadsheet | |
| AVIANO MASTERSPECS 2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it Architecture, Engineering and Consulting Services
PROJECT ASHE 21-1023
RPR HVAC FAC 1403
AREA F, AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATIONS
REVISION 1
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Date: Feb 2023 mailto:design@soinci.it
Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it Architecture, Engineering and Consulting Services
PROJECT ASHE 21-1023
RPR HVAC FAC 1403
AREA F, AVIANO AIR BASE, ITALY
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT, I DECLARE THAT I HAVE ASCERTAINED THAT THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABLE
ITALIAN NORMS.
Date: Feb 2023
Architectural
Arch. M. Cantagallo Ordine degli Architetti della Provincia di Frosinone No.338
Mechanical Systems:
Ing. F. Paglia Ordine degli Ingegneri della Provincia di Roma No.21505, sez. A
Electrical Systems:
Ing. M. Ferrigno Ordine degli Ingegneri della Provincia di Roma No.36957, sez. A
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
INDEX
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-12
AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 13-16
REVISED MASTER SPECIFICATIONS 17-21
SCHEDULE OF WORK ITEMS 22-42
ATTACHMENTS:
− EXISTING CONDITION PICTURES 43-50
1ASHE 21-1023 Rpr HVAC Fac. 1403 R1
SECTION AC1
SCOPE OF PROJECT AND APPLICABLE CONDITIONS
AC1-01 SCOPE OF PROJECT: The Scope of this project number ASHE 21-1023 is “REPAIR HVAC FACILITY 1403” in AREA F, of Aviano Air Base, Italy, it also includes executionof minor renovation and adjustment of building finishing, as ceiling and paintings.
Facility general description
a. Civil/Architectural Building No. 1403 is a two level facility located in Area "F" of the Aviano Air Base, it houses at ground floor administrative offices and at first floor the Aviano Air Base courthouse and relative offices.
The facility is composed by a main “T” shape, major dimensions approximately
62.00 meters x 48.00 meters, the total usable floor space is approx. 2650 square meters, for a gross area of 3150 Sq.m.
The facility has a reinforced concrete structure with pitched roof finished with Portuguese type tiles, the internal effective average height is approx.
2.80m.
Interior materials and finishes are as follows:
- Flooring of various materials: ceramic tiles, carpet floor and industrial concrete floor in technical spaces.
- Partitions are painted gypsum board.
- The suspended ceiling consists of 60x60cm mineral fiber panels, installed at 2.80m from finished floor and gypsum board suspended ceiling installed in toilet areas and as decorative fascia in several large rooms.
- Doors are wood and plastic laminate in office spaces and prefinished galvanized steel in secure areas.
The exterior face of perimeter walls is plastered, and quartz resin painted finished. The windows and doors have metal or aluminum frames, some windows have darkening screen. The external doors are provided of panic bar. Storm water is collected by downspouts and disposed to base stormwater system.
No renovation work of exterior layout/surfaces are included in this project.
b. Mechanical
Subsystems #1,2,3 The HVAC system serving the building is of the “all-air, variable flow” type, with the exception of a few rooms, such as the server/comm rooms, a conference room in area B, the court room, the jury’s room, which are equipped with dedicated systems.
The main HVAC system consists of 3 sub-systems, one for each area, each consisting of:
- An AHU that produces air conditioning at a fixed temperature and variable flow;
- Circular high-speed delivery ducts between the AHU and the VAV boxes.
- VAV boxes with fan and a post-heating coil.
- Low speed ducts, with diffusers and grilles, downstream of the VAV boxes.
- An exhaust air fan.
- An outdoor air fan.
The main equipment of HVAC systems are VAV boxes and AHUs.
Subsystem #4 The Court room (zone #4) is served by a dedicated HVAC system consisting of a constant volume AHU (AHU-4).
2ASHE 21-1023 Rpr HVAC Fac. 1403 R1
Subsystem #5 The Jury’s room and the Judge room is served by a dedicated DX ducted air-conditioner.
Boiler room The HVAC system is served by a 234 kW pressurized, steel boiler (year of construction 2002) and an air-cooled refrigeration unit (chiller) with a nominal cooling capacity of 302kW (year of construction 2014).
The plant is equipped with No.2 chilled water pumps and No.2 hot water pumps.
HVAC system state of conservation The HVAC system has problems of thermo-hygrometric discomfort and poor air quality in the rooms, which are due to the following causes:
-Poor state of conservation / maintenance of the equipment and components of the HVAC system.
-Control and supervision system extensively tampered with;
-Inappropriate choices relating to system management such as keeping the boiler off in summer, the chiller in winter, and both off in mid-seasons;
c. Electrical The building is fed by means a secondary substation MV/LV, equipped with a 800 kVA transformer 20/0,38 kV. Underground cables of section of 150 mm2, EPR insulated, laid in a 4” PVC cable duct, start from secondary substation, and supply the Main Switchboard (MSB) inside the building #1403. The MSB fed the following Distribution Panels: C1A, CIB, CIC, C1D, C1E, C1F, C1G, C1H, R1A, RIB, R1C, R1D, R1E, R1F, L1A, L1B, L1C and ME.
The HVAC equipment are fed by R1A, R1D, R1E, R1F and ME distribution panels.
Works to be performed:
Work to be performed includes but are not limited to the following architectural,mechanical and electrical items:
a. Civil/Architectural Work
- Removal, store, and reinstallation of 60x60cm existing mineral fiber suspended ceiling panels to allow HVAC system repair. It includes the removal and store for subsequent reinstallation of electrical, mechanical and fire protection system fixtures not included in works and removal, store and reinstallation of rock wool insulation batt bagged up in plastic enclosure.
The estimated quantity of existing mineral fiber suspended ceiling is approx. 2,000.00 Sq.m, the 50% of ceiling surface will be involved in HVAC repair works therefore it is estimated the removal/store and reinstallation of approx. 800 Sq.m and the replacement of 200 Sq.m of mineral fiber suspended ceiling.
- Removal and subsequent furnishing and installation of gypsum board suspended ceiling and enclosures to allow HVAC system removal/installation. It includes the removal, store, and reinstallation of mechanical, electrical and fire protection fixtures not involved in works, where necessary, and painting of new ceilings and enclosures.
The estimated quantity of existing gypsum board suspended ceiling is approx. 370 Sq.m, it is estimated the replacement of approx. 50 Sq.m of gypsum board suspended ceiling.
3ASHE 21-1023 Rpr HVAC Fac. 1403 R1
- Furnishing and installation of new access door to mezzanine #1 from room 133, including the enlargement of existing passageway.
b. Mechanical Works – HVAC system
- Refurbishment of AHU-1/2/3/4, consisting of: internal cleaning, replacement of the fans, replacement of heat exchange coils, refurbishment of coils supply pipes, replacement of filters, condensate collection trays and droplet separators.
- Replacement of existing external air intake fans (OAF-1/2/3), with new variable flow fans with EC type motors.
- Replacement of n.3 CAV air flow regulators with flow meter boxes
- Replacement of existing outdoor air intake grilles with others easy removable type equipped with bird net (only for AHU-1, G-3 filter on outside air grille).
- Replacement of existing exhaust fans (EF-1/2/3/6), with new variable flow fans with EC motors.
- Complete replacement of HVAC system regulation system (field elements, regulators and wiring).
- Cleaning of low speed air ducts (rectangular ducts).
- Cleaning of the supply and return air diffusers.
- Replacement of flexible ducts to connect the VAV boxes and the supply and return diffusers to rigid, galvanized steel ducts.
- Refurbishment of the VAV boxes consisting of the internal cleaning of the box, the replacement of fan and its motor and chemical cleaning of the post-heating coil.
- Replacement of the regulation of the VAV boxes consisting of the replacement of the regulators on board the boxes, the heating coil regulation valves and the wall-mounted control panels.
- Complete replacement of the regulation system of the boiler room consisting of field elements, regulators and wiring.
- Complete replacement of the safety devices of the thermo-refrigeration system in Boiler Room in accordance with “Raccolta R Ed. 2009” (safety valves, expansion tanks, fuel shut-off valve, pressure switches, thermostats, flow switches, thermometers, pressure gauges, etc.)
- Replacement of CRAHU-9 hydronic unit in comm room n. G-24. with DX mono-split air conditioner, cooling capacity 3,5kW.
- Installation of a new DX dual split air conditioner, complete with no.2 indoor cassette units, total cooling capacity 3,5kW.
- Replacement of a ducted DX mono-split air conditioner (AHU-5) with a new air conditioner of the same features.
- Balancing of hydronic and aeraulic networks.
- Complete replacement of the supervision system.
c. Electrical Works
- Supply and installation of new electric feeding line to supply new HVAC equipment, including the supply and installation of new circuit breakers to existing electrical panel.
At the end of the electrical works, the upgraded systems shall be tested in accordance with the CEI 64/8 and the “Dichiarazione di Conformità” in accordance with the Decree No. 37/08 shall be provided.
AC1-02 TECHNICAL SPECIFICATION: The following Sections of the Master Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated March 2020 and applicable modifications, shall be applicable to
4 ASHE 21-1023 Rpr HVAC Fac. 1403 R1 the present project, together with the List of Work Items to be performed:
01100 GENERAL CONDITIONS
09250 GYPSUM AND CEMENT BOARD
09510 ACOUSTICAL CEILING
15050 BASIC MECHANICAL MATERIALS AND METHODS
15070 MECHANICAL SOUND, VIBRATION AND SEISMIC CONTROL
15080 INSULATIONS FOR MECHANICAL EQUIPMENT
15181 CHILLED WATER AND HOT WATER PIPING
15601 CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
15720 AIR HANDLING AND DISTRIBUTION EQUIPMENT
15810 DUCTWORK AND DUCTWORK ACCESSORIES
15950 HVAC TESTING/ADJUSTING/BALANCING
15960 DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
See Paragraphs AC1-23 and AC1-24 for the applicable specifications.
AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
The number of copies will be as required on AF Form 66.
AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.
Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO ENTRY" shall be placed at the work area entry and along each side of the fencing.
Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by BCE. Contractor shall submit photos or samples of the screening material for approval by BCE. The Contractor shall replace or repair in a timely manner, as determined by BCE, all fences and screening sections that have damage or develop unsightly rips or holes. At the end of the work or when exterior work requires it, temporary fencing shall be removed.
Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101/R and Law 81/08. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site.
5 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
Contractors shall submit sign proposal to CE for approval.
AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution cannot begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE. Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1-07 SAFETY: Reference regulations for construction works to applied are the following: “OSHA 29 CFR 1926 Construction Regulations”; “US Corps of Engineers Manual EM385-1-1 Nov. 2014”; “AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards” and “Italian Legislative Decree 81/08”.
The contractor is responsible for ensuring overall compliance, in case of any difference, the more stringent applies.
At all times the Contractor will assure all personnel are wearing the correct safety equipment when performing their work, such as hard hats, steel toe boots, gloves, reflective gear and any other equipment deemed necessary to perform their work in the safest way. In this design service has been included by an appointed professional, R.A. Massimo Cantagallo, a site- specific Safety Plan (PSC - Piano di Sicurezza e Coordinamento), in accordance with Legislative Decree 81/08), PSC is considered equivalent to the Accident prevention plan required by Manual USACE EM385-1-1.
Contractor shall consider in advance interference hazard through a preliminary assessment plan. The “DUVRI -Documento Unico per la Valutazione Rischi da Interferenze” shall be coordinated with 31°FW/CCPP Base employees safety representative (Phone 0434 30 5709), in accordance with Legislative Decree 81/08.
Contractor shall develop the site-specific plan for operational safety (POS
- Piano Operativo di Sicurezza) in accordance with Legislative Decree 81/08, prior to starting planned work activities. Employees training certificates shall be attached to the POS.
Contractor's representatives shall receive a safety briefing during the pre-performance conference from Base 31FW/SEG Occupational Safety Office.
Electronic copy of POS will be provided to 31°FS/SEG (Phone 0434 30 8526).
In this contract the contractor to gain access inside the Substations will be escorted by the personnel of electric shop.
The Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.
AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
6 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
b. Safety Data Sheets: The Contractor shall furnish English language versions of the Safety Data Sheets (SDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEIE for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.
c. Hazardous Waste Management Plan: The Contractor shall provide a hazardous waste management plan.
d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEIE office.
e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEIE through the Director of Works.
f. Asbestos Containing Materials: There is no evidence of Asbestos containing materials.
Contractor shall notify immediately the Contracting Officer if during demolition/excavation works asbestos containing materials will be encountered to coordinate its removal and disposal in the appropriate manner in compliance with all applicable Italian norms.
AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and, where applicable, vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1-10 WORK SITE CONDITIONS: The work areas shall be made available to the Contractor as follows:
a. Building interior area: Contractor is responsible for the moving and eventual demounting of all the furniture out of the rooms involved in works. All the computers, documents and personal items will be previously removed by the government. A dedicated space inside the building will be available for the temporary furniture stacking as directed by the contracting officer.
b. Building Location: building 1403 is located in area F and does not require special access procedures, any way the Contractor shall strictly comply with the Contracting Officer’s instructions.
The government will not be held liable for unproductive time and other related costs due to delays for unannounced suspension of work due to military operations and/or exercises or safety reasons. The government will only negotiate an equitable extension of the
7 ASHE 21-1023 Rpr HVAC Fac. 1403 R1 performance period based on documented delays and unannounced suspensions of work.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by BCE, unless it is hidden by the opaque fencing material. Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.
e. Loading and Unloading of Construction Materials and Equipment:
Unloading of materials will be allowed within the fenced work area.
Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area; unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the
Contractor shall be responsible for cleaning the area inside and surrounding the building involved in the work.
Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.
Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all lightweight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield.
AC1-11 AIRFIELD SAFETY TRAINING: Not Applicable
AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or laydown areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
8ASHE 21-1023 Rpr HVAC Fac. 1403 R1
The Contractor shall not park outside the construction zone unless approved through BCE.
The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for approval by BCE.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.
AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered. Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1-16 EXCAVATIONS: Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time.
Dust control measures are the responsibility of the Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.
AC1-17 LAWN MAINTENANCE: Not Applicable
AC1-18 LAWN ESTABLISHMENT: Not Applicable
AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five (5) days of Government acceptance of the project site.
AC1-20 PROCEDURES AND WORK PHASES:
The Facility 1403 houses several administrative functions. Personnel working into the facility WILL NOT MOVE OUT during project works. Depending on work activity Personnel may be required to move desks to allow Contractor to work on ceiling units. Contractor shall implement a phasing plan which will limit as much as possible the service interruptions and inconveniences . Works will comply with the sub-systems described in paragraph AC1-01b and shown in sheets M-2 and M-3.
It is therefore planned to close from time to time the occupied areas served by a subsystem, while the other areas will continue to operate, as follow:
9ASHE 21-1023 Rpr HVAC Fac. 1403 R1
Phase 1 Phase 2 Phase 3 Phase 4
Ground Floor, Zone 1 (AHU1) Ground Floor, Zone 2 (AHU2) First Floor, Zone 3 (AHU3) First Floor, Zone 4 (AHU4) and Zone 5
In order to limit service interruptions, the contractor shall verify on-site the feasibility of performing the partial work as described below:
For zones 1/2/3, once the AHU and its external air intake and exhaust fans have been renovated and the main channels have been cleaned, the system could be put back into operation by isolating one VAV cassette at a time and intervening on that equipment and on the equipment connected to it (post-heating coil, channels in low speeds and adjustment of that cassette). Once contractor has completed works on that cassette it may move on to the other VAV cassettes.
WORK PHASES
The HVAC system consists of 5 main sub-plants, of which 3 main and 2 secondaries. The first 3 sub-systems are very similar to each other by type (variable flow systems with recirculating VAV cassettes and post-heating coil), each belonging to a primary air AHU with variable flow rate.
The other 2 plants are different from the first in type and size. In particular, subservice no. 4 consists of an AHU with partial air recirculation, at constant flow rate, while subservice no. 5 consists of a direct expansion air conditioner of the ducted type. These sub-plants are restructured without changing their philosophy, but only by intervening by carrying out extraordinary maintenance of the equipment itself, cleaning of the channels and the reconstruction of the regulation and supervision systems. Another sub-plant, new, consists of a direct expansion and system ("dual split" type) serving a new conference room.
Phasing plan The "phases" of the intervention that aims to keep the facility operational at least partially during all the duration of the interventions, will inevitably have to respect these sub-systems. It is therefore planned to close the occupied areas served by a subsystem from time to time, while the other areas will continue to function (for the visualization of the areas, see the key-plans shown on sheet M-3. ).
Zone 1 During the operation on the AHU of Zone 1 (UTA-1) the HVAC system will not operate in any area served by the same sub-system. During the renovation of the UTA-1 it will be possible to simultaneously intervene on the OAF-1 external air intake and EF-1 ejection fans and on the sanitization of the supply and return channels, on the VAV cassettes and on the regulation system of each equipment and of the sub-system in general.
Zone 2/3/4/5/6 The same must be done for zones 2, 3, 4 and 5 and for the installation of the new HVAC system of the new conference room (dual split system).
Regulation and supervision systems As mentioned, the control systems will be installed during or immediately after the renovation of the equipment itself.
The supervision systems can be eventually realized at a later time.
Note: In purely theoretical terms, for zones 1/2/3, once the AHU and its external air intake and exhaust fans have been renovated and the main channels have been cleaned, the system could be put back into operation by isolating one VAV cassette at a time and intervening on that equipment and on the equipment connected to it (post-heating coil, channels in low speeds and adjustment of that cassette). Once you have intervened on that cassette you could move on to the other VAV cassettes. However, in this case, the intervention would be problematic (not being the balanced system) and would expand times and costs of the total intervention.
10ASHE 21-1023 Rpr HVAC Fac. 1403 R1
Prior to starting any work the Contractor shall submit a detailed Work Plan to be coordinated and discussed with facility users and to be finally approved by the Contracting Officer. In order to minimize funtions inconveniences, Contractor may be required to work during week end.
AC1-21 SALVAGEABLE MATERIALS: If applicable.
It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative.
It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material.
Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory. Use of Base dumpsters is strictly prohibited for any type of waste.
The use of Aviano Air Base dumpsters is strictly prohibited for any type of waste.
11 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
DRAWING # SHEET # DESCRIPTION
GENERAL
1 of 29 T-1 PROJECT TITLE SHEET AND MAPS 2 of 29 T-2 LIST OF DRAWINGS & LEGEND
ARCHITECTURAL
3 of 29 A-1 GROUND AND FIRST FLOOR PLANS 4 of 29 A-2 BUILDING SECTIONS 5 of 29 A-3 BUILDING ELEVATIONS AND DETAILS 6 of 29 A-4 SUSPENDED CEILING PLAN, 1 OF 2 7 of 29 A-5 SUSPENDED CEILING PLAN, 2 OF 2
MECHANICAL
8 of 29 M-1 MECHANICAL SYSTEM LEGEND 9 of 29 M-2 EXISTING CONDITION - HVAC DIAGRAM AND ZONING PLAN 10 of 29 M-3 NEW CONDITION – HVAC DIAGRAM AND ZONING PLAN- 1 OF 2 11 of 29 M-4 NEW CONDITION – HVAC DIAGRAM AND ZONING PLAN- 2 OF 2 12 of 29 M-5 HVAC DUCTWORK – GROUND FLOOR AREA A 13 of 29 M-6 HVAC DUCTWORK – GROUND FLOOR AREA B, FIRST FLOOR AREA A
14 of 29 M-7 HVAC PIPING AND EQUIPMENT PLAN– GROUND FLOOR AREA A 15 of 29 M-8 HVAC PIPING AND EQUIPMENT PLAN - GROUND FLOOR AREA B, FIRST FLOOR AREA A
16 of 29 M-9 HVAC EQUIPMENT AND DUCTS – MEZZANINE FLOORS 17 of 29 M-10 HVAC P&I DIAGRAM 18 of 29 M-11 HVAC CONTROL SYSTEM – CONTROL SEQUENCES 1 OF 2 19 of 29 M-12 HVAC CONTROL SYSTEM – CONTROL SEQUENCES 2 OF 2 20 of 29 M-13 EQUIPMENT SCHEDULE – SHEET 1 OF 3 21 of 29 M-14 EQUIPMENT SCHEDULE – SHEET 2 OF 3 22 of 29 M-15 EQUIPMENT SCHEDULE – SHEET 3 OF 3 23 of 29 M-16 CONSTRUCTION DETAILS - NEW INTAKE/EXHAUST AIR GRILLES
ELECTRICAL
24 of 29 E-1 EXISTING AND NEW CONDITION - GROUND FLOOR PLAN 25 of 29 E-2 EXISTING AND NEW CONDITION - FIRST FLOOR AND
MEZZANINE PLANS
26 of 29 E-3 EXISTING CONDITION - DISTRIBUTION PANELS - ONE LINE
DIAGRAMS
27 of 29 E-4 EXISTING CONDITION - DISTRIBUTION PANELS - ONE LINE
DIAGRAMS
28 of 29 E-5 NEW CONDITION - DISTRIBUTION PANELS - ONE LINE
DIAGRAMS
29 of 29 E-6 NEW CONDITION - DISTRIBUTION PANELS - ONE LINE
DIAGRAMS
AC1-23 ADDITIONAL SPECIFICATIONS: In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-02 of these Technical Specifications, the following Additional
12 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
Specifications shall apply to this project:
NOT APPLICABLE
AC1-24 REVISED MASTER SPECIFICATIONS: In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-02 of these Technical Specifications, the following Revised Master Specifications shall apply to this project
01101/R PROJECT SIGN
09900/R PAINTS AND COATINGS
16050/R BASIC ELECTRICAL MATERIALS AND METHODS
AC1-25 ADDITIONAL NORMS AND STANDARDS: All work shall be done in accordance with appropriate Italian and United States laws, regulations, or codes, whichever is more restrictive at contract award date.
– “DL No. 81/2008 “Testo unico sulla salute e sicurezza sul lavoro”
(Regulation on Health and Safety in construction sites).
– DM del 17/01/2018 New technical norms on Constructions
– Law 10/91 Norms for the accomplishment of state Energy plant in matter of rational use of the energy, of Energy saving and development of renewable energy source
– DPR 412/93 Regulation for design installation, use and maintenance of thermal plants to the aim of restraint energy consumption, in accomplishment of Low 10/91
– DPR 551/99 Modification of DPR 412/93
– D.Leg.vo 192/2005 Carring out rule of European Directive 2002/91 CE
– D.Leg.vo 311/2006 Corrective and supplementary provisions to the
D.Leg.vo 192/2005
– D.Leg.vo 115/2008 Implementations of European Directive 2006/32/EC on
Energy saving Directive 93/76/EEC
– D.Leg.vo 59/2009 Carring out rule of Art. 4 Item 1-a) b) D.Leg.vo
192/2005
– D.Leg.vo 28/2011 Implementations of European Directive 2009/28/EC on
Renewable Energy
– D.M 26/06/2015 Minimum requirements for energy conservation in building.
– D.M. 1.12.75 Safety rules for equipments containing hot liquids under pressure
– D.M. 22.1.2008 n° 37 Norms for the safety of the systems
– D.M. 19.5.2010 Modification of annex D.M. 22.1.2008 n° 37
– D.M. 1/12/1975 Safety norms for equipments that contain hot liquid under pressure.
– D.Lgs. 25/2/2000 n.93 Implementation of the 97/23/CE European Directive relevant equipment under pressure.
13 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
– D.Lgs. 152 3/4/2006 Environmental Norms
– D.Lgs. 284 8/11/2006 Corrections and upgrading of D.Leg.vo 152/ 3 April
2006 relevant environmental norms.
– Low 549 28/12/1993 Norms to safeguard the stratospheric ozone and the environment
– UNI 10339/2009 Air conditioning Systems for thermal comfort in buildings. General, classification, and requirements
– UNI EN 13779/2007 Ventilation for non residential buildings
– UNI EN 13465 Residential Buildings Ventilation flow rate.
– UNI 10349 Heating and cooling of buildings - Climatic data.
– UNI/TS 11300-1/2/3/4 Energy performance of buildings
– UNI 10412-1:2006 Hot water heating systems – Safety requirements -
Part 1: Specific requirements for heating systems provided with heat generators either electrical or burning solid, liquid or gaseous fuels
– UNI EN 12831:2006 Heating systems in buildings – Method for calculation of the design heat load
– UNI EN 378:2008 Refrigerating systems and heat pumps. Safety and environmental requirements
– UNI 8065 Water treatment in thermal heating systems for civil use
– CEI 64/8 Electrical systems with nominal voltage not exceeding 1000 V ac and 1 500 V dc;
– Decree No 37/2008 Norms for installation, expansion and maintenance of technological system in the buildings
AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS:
a. Once issued NTP, Contractor is required to schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization, quantity, and cost. The facility numbers and applicable Air Force Category codes will be filled by PM with CEIAP assistance. Contractor is required to provide the information to fill Form DD1354 to the PM no later than the pre-final inspection date.
b. All installed new electrical equipment shall be provided with "C.E."
mark;
c. At the end of the work, the Contractor shall provide the Government with three paper and digital copies of the following documents:
1. Certificate of Compliance with Law No. 37/08, for the installation of the Mechanical and electrical systems in a workmanlike manner, signed by the Contractor.
2. As-Built drawings.
3. Final Acceptance Test Certifications for mechanical and electrical systems signed by a Registered Engineer to be selected from three candidates proposed by the Contractor to the Contracting Officer, if applicable.
4. Warranty Management and Preventive Maintenance.
For Warranty Management and Preventive Maintenance purpose, the closeout documentation shall be delivered IAW the Master Spec for construction Projects of the Air Base in Aviano (Pn), 14 ASHE 21-1023 Rpr HVAC Fac. 1403 R1 section 01100 “General Condition” at the latest applicable revision.
5. Operation, Maintenance & Warranty Checklist. a detailed list of all parts installed shall be provided, as minimum the following information shall be included:
− Brief description of the part/piece of equipment.
− Manufacturer and model.
− Serial number or ID.
− Building-Floor-Room where the item is installed.
− Point of Contact for Warranty call (Name, phone, mail);
Alternatively, the Warranty Management Plan as per UFGS 01 78 00 “Closeout Submittals”.
See attachments to section 01100 of Master Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated March 2020.
15 ASHE 21-1023 Rpr HVAC Fac. 1403 R1
SCHEDULE OF MATERIAL SUBMITTALS
LEGEND
Electronic Copy
(number) Number of Paper Copies, stamped and signed if required
E + # Electronic Copy + number of paper copy, stamped and signed when required
PROJECT NUMBER
ASHE 21-1023
PROJECT TITLE
RPR HVAC FAC 1403
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
MB
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
R
EC
EI
VE
D
IN
CO
NT
RA
CT
G
TO
C
IV
IL
EN
GI
NE
ER
TU
RN
S
US
PE
NS
E
SU
BM
ITT
AL
N
UM
BE
RS
DATE CONTRACTOR
NOTIFIED
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L A
PP
RO
VA
L
REMARKS
CE
RT
IF
IC
AT
IO
N
OF
MP
LIA
NC
E
SH
OP
D
RA
W
IN
G
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
S
CO
MM
EN
DA
TIO
NS
MA
NU
FA
CT
UR
CA
TA
LO
G
OP
AT
IN
G
IN
ST
RU
CT
IO
ST
RU
CT
UR
AL
C
AL
CU
LA
TIO
N
APPROVED DIS-
APPROVED
GENERAL
JOB SITE MOBILIZATION
Job Site Mobilization / Demobilization, Phasing and construction schedule plan Paragraph AC1-06, AC1-20
E 15
PART II a
ARCHITECTURAL WORK
Material Safety Data Sheets (MSDS)
1 Suspended Ceilings Part IIa Item 1, 2, 3
E E E 20
2 New access door to mezzanine 1 Part IIa Item 4
E E E E 20
PART IIIa – MECHANICAL WORKS
HVAC
Material Safety Data Sheets (MSDS)
3 New components AHUs Part IIIa Item 1
+E
E E E 30
4 New ventilation units Part IIIa Item 2
+E
E E E 30
AFForm 66, OCT 89 14
ASHE 21-1023
PROJECT TITLE
RPR HVAC FAC 1403
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
IR
ED
S
UB
MI
SS
IO
N
R
EC
EI
VE
RA
CT
TO
C
IV
IL
EN
GI
NE
ER
RN
S
US
PE
NS
E
ITT
AL
N
UM
RA
CT
OR
R
ES
UB
MI
L A
PP
RO
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
G
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
CO
MM
EN
DA
FA
CT
UR
LO
G
AT
IN
G
IN
ST
RU
CT
CT
UR
AL
C
AL
CU
LA
TIO
N
APPROVED DIS-
APPROVED
5 New air intake louvers Part IIIa Item 3
+E
E E E 30
6 New Air flow meter boxes Part IIIa Item 4
+E
E E E 30
7 New DDC control Part IIIa Item 5
+E
E E E E E 30
8 New supervision system Part IIIa Item 6
+E
E E E E E 30
9 Cleaning of VAV and AHU Part IIIa Item 7, 10
E 30
10 New flexible duct Part IIIa Item 8
+E
E E E E E 30
11 New fans on VAV Part IIIa Item 9
+E
E E E E E 30
12 External insulation of vav boxes Part IIIa Item 11
+E
E E E E 30
13 New split. Room G24, Conf room, Mez#3 Part IIIa Item 12, 13, 14
+E
E E E E E 30
14 Safety components Part IIIa Item 15
+E
E E E E E 30
15 Balancing Part IIIa Item 16
E 30
AFForm 66, OCT 89 15
ASHE 21-1023
PROJECT TITLE
RPR HVAC FAC 1403
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LIN
E
NU
IR
ED
S
UB
MI
SS
IO
N
R
EC
EI
VE
RA
CT
TO
C
IV
IL
EN
GI
NE
ER
RN
S
US
PE
NS
E
ITT
AL
N
UM
RA
CT
OR
R
ES
UB
MI
L A
PP
RO
RT
IF
IC
AT
IO
LIA
NC
E
SH
OP
D
RA
W
IN
G
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
CO
MM
EN
DA
FA
CT
UR
LO
G
AT
IN
G
IN
ST
RU
CT
CT
UR
AL
C
AL
CU
LA
TIO
N
APPROVED DIS-
APPROVED
PART IV – ELECTRICAL WORKS
Material Safety Data Sheets (MSDS)
16 Electrical lines Part IVa Item 1
+E
E E E E 30
17 New circuit breakers Part IVa, Item 2
+E
E E E E 30
18 Test and certifications Part IVa, Item 3
+E
E E E E 30
AFForm 66, OCT 89 16
17 ASHE 21-1023
REVISED MASTER SPECIFICATIONS
SECTION 01101/R PROJECT SIGN
SECTION 09900/R PAINTS AND COATINGS
SECTION 16050/R BASIC ELECTRICAL MATERIALS AND METHODS
18 ASHE 21-1023 Section 01101/R
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Provide labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. Emergency Numbers: 112 - 911
Lettering of the sign will be as shown on the following sketch and may be painted or stencilled directly on sign. The sign will remain the property of the Contractor and shall be promptly removed upon completion of the project.
The contractor shall also provide project and safety signs in accordance with Law 81/08 and subsequent amendments (Ministerial Decree 22 Jan 2019).
19 ASHE 21-1023 Section 01101/R
- End of Section –-
20 ASHE 21-1023 Section 01101/R
SECTION 09900/R
PAINTS AND COATINGS
Paragraph 1.1 Applicable publications:
Delete:
UNI ISO 6504-1 (2006) Paints and Varnishes - Determination of Hiding Power - Part 1:
Kubelka-Munk Method for White and Light- Colored Paints.
UNI EN ISO 3251 (2008) Paints, Varnishes and Plastic -
Determination of Non-Volatile Matter Content.
Add:
UNI EN ISO 6504-1 (2019) Paints and Varnishes - Determination of Hiding Power - Kubelka- Munk Method for White and Light-Colored Paints.
UNI EN ISO 3251 (2019) Paints, Varnishes and Plastic -
Determination of Non-Volatile Matter Content.
-- End of Section --
21 ASHE 21-1023 Section 16050/R
SECTION 16050/R
BASIC ELECTRICAL MATERIALS AND METHODS
Paragraph 1.1:
Delete:
CEI 64-8 (2012) Electrical Systems with Rated Voltage not exceeding 1000 V a.c. and 1500 V d.c.
Add to “ITALIAN ELECTROTECHNICAL COMMITTEE (CEI)” paragraph the following:
CEI 64-8;V5 (2019) Electrical Systems with Rated Voltage not exceeding 1000 V a.c. and 1500 V d.c.
CEI 16-2 (2019) Basic and Safety Principles for Human
Machine Interface, Marking and Identification - Identification of device terminals, wire ends and conductors
CEI EN 60706-2 (2006) Equipment Maintenance.
-- End of Section --
22 ASHE 21-1023 Rpr HVAC Fac. 1403
SCHEDULE OF WORK ITEMS
1. EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF FURNISHING AND
INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING,
TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR REMOVED
MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S
INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH ITEM
COMPLETE IN A WORKMANLIKE MANNER.
2. ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED,
ARE ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD
RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE
CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM BASIS.
IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO
CALCULATE, FORESEE AND PERFORM ALL QUANTITIES AND WORK
NECESSARY EVEN IF NOT MENTIONED IN THE SPECIFICATIONS BUT
INCLUDED IN THE DRAWINGS OR MANIFESTLY NECESSARY TO DELIVER A
COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
23 ASHE 21-1023 Rpr HVAC Fac. 1403
TABLE OF CONTENTS
PART I – DEMOLITIONS, REMOVALS AND EXCAVATIONS 24
Ia – Architectural Demolitions 24 Ib - Mechanical Demolitions 25 Ic - Electrical Demolitions – Not Applicable 28
PART II – ARCHITECTURAL, STRUCTURAL AND CIVIL WORK 29
IIa - Architectural Work 29
PART VI – MECHANICAL WORK 31
IIIa – HVAC System 31
PART IV – ELECTRICAL WORK 40
IVa – Power, grounding, equipotential and LPS 40 IVb – Lighting system – Not Applicable 43 IVc – Communication system – Not Applicable 43 IVd – Fire Alarm System – Not Applicable 43
24 ASHE 21-1023 Rpr HVAC Fac. 1403
SCHEDULE OF WORK ITEMS
PART I – DEMOLITIONS, REMOVALS AND EXCAVATIONS
Ia – Architectural Demolitions
1. Removal and store for subsequent reinstallation of 60x60cm existing mineral fiber suspended ceiling panels to allow HVAC system repair.
It is estimated the removal of approx. 800.00 Sq.m of 60x60cm mineral fiber suspended ceiling panels, and the demolition and removal of approx. 200. Sq.m of mineral fiber suspended ceiling, including metal structure.
Item includes:
- Scaffoldings.
- Removal and store for subsequent reinstallation of electrical, mechanical and fire protection/alarm system fixtures not included in works.
- Removal and store of rock wool insulation batt bagged up in plastic enclosure.
- Loading and transportation of resulting materials to authorized public dump area.
- The payment of the dump fees.
- All operations necessary for the workmanlike execution of the work.
a. Removal of existing panels:
800.00 Sqm.
b. Demolition and removal of mineral fiber suspended ceiling:
200.00 Sqm.
2. Demolition and removal of gypsum board suspended ceiling to allow
HVAC system repair.
- Removal, store for subsequent reinstallation of mechanical and electrical fixtures not involved in works, as necessary.
- Removal and store of rock wool insulation batt bagged up in plastic enclosure.
- Loading and transportation of resulting materials to authorized public dump area.
- The payment of the dump fees.
50.00 Sq.m
25 ASHE 21-1023 Rpr HVAC Fac. 1403
Ib - Mechanical Demolitions
3. Removal of components inside/on board of No.4 existing Air Handling Unit (AHU-1/2/3/4) on Mezzanines #1/2/3.
- Electrical and mechanical disconnection of equipment;
- For each AHU:
- Removal of No.1 supply auger fan and relative electric motor and belt transmission system;
- Removal of No.2 heat exchange coils;
- Removal of droplet separator;
- Removal of the condensate drain pan;
- Removal of flat filter.
- Removal of hot and chilled water supply pipes to the heat exchange coils complete with thermal insulation, valves, probes, instruments and any other device installed on them.
- Removal of regulating systems and equipment as probes, thermostats, valves, controller, panel and wires.
- Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.
- Removal and disposal of rock wool insulation, if present. Rock wool insulation shall be disposed as hazardous waste, CER code 17.06.03*. Contractor before disposal shall proceed with the sampling of the insulation, in compliance with rules of “CE Regulation no.1272/2008” as well as upgraded by “CE Regulation 790/2009”.
Lump Sum
4. Removal of No. 7 box fans (OAF-1/2/3 and EF-6, installed in Mezzanines
1/2/3, EF-1/2 installed in Rooms 120/121, Area A, first floor, and EF- 3 installed in room G-57, Area B, ground floor).
- Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.
- Removal and disposal of rock wool insulation, if present. Rock wool insulation shall be disposed as hazardous waste, CER code 17.06.03*. Contractor before disposal shall proceed with the sampling of the insulation, in compliance with rules of “CE Regulation no.1272/2008” as well as upgraded by “CE Regulation 790/2009”.
Lump sum
26 ASHE 21-1023 Rpr HVAC Fac. 1403
5. Removal of No.5 external air intake/exhaust air grilles serving AHU- 1/2/3/4/5 equipment (see sheet A-3 for their identification).
materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.
6. Removal of the Regulation systems of HVAC system, including controllers installed inside electric/regulation panels, field…
This is the start of the file's text. The full file is on GovTribe.