| 10_Anticarbonation Paint.pdf | ||
| 11_ETL_04_2.pdf | ||
| 03_Scheda_Corkpan.pdf | ||
| ASHE 18-1090 CCEB IDIQ PAINTING Nov19.xlsx | XLSX spreadsheet | |
| 09_Glass microsphere.pdf | ||
| 02_Celenit_Vital_cellulosa.pdf | ||
| 01_Rasatura armata.pdf | ||
| 07_Conpaviper manual.pdf | ||
| 04_Canapa_ST-CANATON-D100.pdf | ||
| 06 Road Marking.pdf | ||
| 08_Assovernici Manual.pdf | ||
| 05 Concrete repair.pdf | ||
| ASHE 18-1090 Add. #01.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 18-1090
I.D.I.Q.
PAINTING CONTRACT
AVIANO AIR BASE - ITALY
TECHNICAL SPECIFICATIONS
REV.2
FINAL SUBMITTAL (100%) REV.2
Revision 02: Jun 2020
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 1
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVI ANO AIR BASE, ITALY
SECTION A
TECHNICAL SPECIFICATIONS
FOR PAINTING
REV.2
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 2
TABLE OF CONTENTS
SECTION A-1 GENERAL
1.1 WORK SITE CONDITIONS
1.1.1 Work Site Availability
1.1.2 Work Site Access
1.1.3 Transportation of Personnel and Materials
1.1.4 Protection of Persons and Property
1.1.5 Availability of Utilities
1.1.6 Traffic Control and Protection
1.1.7 Airfield Safety and Restricted Areas Training
1.1.8 Hazmat Housekeeping
1.1.9 Project sign
1.1.10 Toilet Facilities
1.2 DEFINITIONS
1.2.1 Paint:
1.2.2 Pavement Markings
1.2.3 Resin Floor
1.2.4 Wall Cladding – Insulation and finish system
1.2.5 Plaster
1.2.6 Reinforced Concrete Restoration
1.3 CONTRACTOR QUALIFICATIONS
1.3.1 SOA Certifications
1.3.2 Safety and Health
1.3.2.1 Antenna systems and Safety
1.3.3 Workmanship
1.3.4 Quality Control
1.3.5 Warranty
1.4 WASTE MANAGEMENT
1.5 SCAFFOLDING:
1.6 CLEANING:
SECTION A-2 PAINTING
2.1 REFERENCES
2.2 SUBMITTALS
2.2.1 Manufacturer Catalog Data
2.2.2 Samples and colors
2.2.3 Approval of material
2.3 MEASUREMENTS
2.4 DELIVERY AND STORAGE
2.5 PRODUCTS
2.5.1 Siloxane Paint
2.5.2 Latex Paint
2.5.3 Methyl-silicon paints
2.5.4 Acrylic Based Plastic Coating
2.5.5 Transpiring Water-Based Paint for Indoor
2.5.6 Water-dilutable Enamel
2.5.7 Water-based Enamel – HACCP standard
2.5.8 Anti-carbonation Paint
2.5.9 Silicon Paint
2.5.10 Elastomeric Compound
2.5.11 Rust Inhibitive Paint
2.5.12 Synthetic Enamel
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 3
2.5.13 Heat Resistant Primer and Paint
2.6 EXECUTION
2.6.1 Description of work
2.6.2 Protection of Areas and Spaces
2.6.3 Defects in Existing Surfaces
2.6.4 Preparation of Surfaces – Removals
2.6.4.1 Wall paint removal
2.6.4.2 Quartz acrylic coating removal
2.6.4.3 Paper coating removal
2.6.4.4 Wood paint removal
2.6.4.5 Metal paint removal
2.6.4.6 Sealing removal
2.6.5 Preparation of Surfaces – Cleaning
2.6.5.1 Water blasting
2.6.5.2 Sand blasting
2.6.5.3 High-pressure water blasting
2.6.5.4 Concrete and Masonry
2.6.5.5 Wallboard and Plaster
2.6.5.6 Metal Surfaces except hot metal surfaces
2.6.5.7 Surfaces Subject to Temperatures of 50 To 80 Degrees Centigrade:
2.6.5.8 Wood and Plywood
2.6.6 Preparation of Surfaces – Primer coat
2.6.6.1 Plastered Surfaces
2.6.6.2 Gypsum Boards
2.6.6.3 Wood Surfaces:
2.6.6.4 Metal Surfaces
2.6.6.5 Heat Resistant:
2.6.7 Wiping of Surfaces:
2.6.8 Exterior and Interior Painting
2.6.9 Equipment
2.6.10 Applications
2.6.10.1 Interior Surfaces - Silossan Water Repellent Painting
2.6.10.2 Interior Surfaces - Latex Paint
2.6.10.3 Interior Surfaces - Methylsilicone Paint
2.6.10.4 Interior Surfaces - Transpiring water-based paint
2.6.10.5 Interior Surfaces - Water-dilutable enamel paint
2.6.10.6 Interior Surfaces - Anticarbonation Paint for Concrete Surfaces
2.6.10.7 Interior Surfaces - Silicon Paint
2.6.10.8 Interior surfaces - Synthetic Enamel
2.6.10.9 Exterior Surfaces - Silossan Water Repellent Painting
2.6.10.10 Exterior Surfaces - Latex Paint
2.6.10.11 Exterior Surfaces - Methylsilicone Paint
2.6.10.12 Exterior Surfaces - Water-dilutable enamel paint
2.6.10.13 Exterior Surfaces - Anticarbonation Paint for Concrete Surfaces
2.6.10.14 Exterior Surfaces - Silicon Paint
2.6.10.15 Acrylic Paint on Exterior Surfaces
2.6.10.16 Wood Surfaces - Synthetic Enamel
2.6.10.16.1 Matte finishing
2.6.10.16.2 Gloss finishing
2.6.10.17 Wood surfaces - Water based paint
2.6.10.18 Wood surfaces - Polyurethane varnish
2.6.10.19 Metal Surfaces - Rust inhibitive Paint
2.6.10.20 Metal Surfaces - Synthetic Enamel
2.6.10.20.1 Matte finishing
2.6.10.20.2 Gloss finishing
2.6.10.21 Metal Surfaces - Heat Resistant Paint for radiators
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 4
2.6.10.22 Water-based Enamel – HACCP standard
2.7 PAINT SCHEDULES
2.7.1 Metal surfaces:
2.7.2 Exterior plastered walls – Siloxane paint:
2.7.3 Exterior plastered walls - Acrylic Based Plastic Coating
2.7.4 Exterior Concrete and plaster – Latex Paint:
2.7.5 Interior Plaster and Wallboard Surfaces – Latex paint
2.7.6 Wood and plywood – Alkyd Enamel:
2.8 FIELD SAMPLE AND TEST:
2.8.1 Inspection
2.9 ENVIROMENTAL REQUIREMENTS:
2.9.1 Coatings features
2.9.2 Open Flame
2.9.3 Ventilation and lighting
2.9.4 Dust Control
2.9.5 Brushes Washing
2.9.6 Weather Conditions
SECTION A-3 PLASTER
3.1 REFERENCES
3.2 SUBMITTALS
3.3 DELIVERY, STORAGE AND HANDLING
3.4 PRODUCTS
3.4.1 Portland Cement
3.4.2 Hydrated Lime
3.4.3 Sand
3.4.4 Water Repellent
3.4.5 Water
3.5 EXECUTION
3.5.1 Plaster Removal
3.5.1.1 Interior Plaster Removal
3.5.1.2 Exterior Plaster Removal
3.5.2 Surfaces to be Replastered:
3.5.2.1 Water blasting
3.5.2.2 Sand blasting
3.5.3 Wall Surfaces Sanitizing
3.5.4 Traditional Interior/Exterior Plaster
3.5.4.1 Interior Plaster
3.5.4.2 Exterior Plaster
3.5.5 Dehumidifying Plaster
3.5.5.1 Dehumidifying Plaster – Standard type
3.5.5.2 Dehumidifying Plaster – Volteco type
3.5.6 Fiber Reinforced Waterproofing Plaster
3.5.7 Reinforced smoothing plaster (rasatura armata)
3.5.8 Top Finishing Plaster (Intonachino)
3.5.9 Thin Plaster (Rasatura)
3.5.10 Acceptance and Repairing
3.6 ENVIRONMENTAL CONDITIONS
3.7 REPAIRS:
3.7.1 Minor Plaster Work and Removal of Paint:
3.7.2 Removal of Existing Stucco:
3.7.3 Preparation of Surfaces:
3.7.4 Plaster Patching:
3.7.4.1 Interior Plaster Patching
3.7.4.2 Exterior Plaster Patching
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 5
3.7.5 Quartz Resin Stucco Repair:
3.7.6 Reputtying:
3.7.7 Recaulking
SECTION A-4 SPECIAL CLADDING FOR THERMAL PROTECTION
4.1 REFERENCES
4.2 SUBMITTALS
4.2.1 Shop drawings
4.2.2 Product Data
4.2.3 Samples
4.2.4 Qualifications of EIFS Manufacturer
4.3 DELIVERY AND STORAGE
4.4 PRODUCTS
4.4.1 EIFS Components
4.4.1.1 Adhesive
4.4.1.2 Mechanical Fasteners
4.4.1.3 Insulation Board
4.4.1.4 Base Coat
4.4.1.5 Reinforcing Fabric
4.4.1.6 Finish Coat
4.4.1.7 Drainage Mat
4.4.1.8 Flexible-Membrane Flashing
4.4.1.9 Water-Resistive Coatings
4.5 EXECUTION
4.5.1 Surface Preparation
4.5.2 External cladding
4.5.2.1 60mm EPS insulation board
4.5.2.2 60mm Rock Wool insulation board
4.5.2.3 60mm Wood Fiber insulation board
4.5.2.4 60mm Cork insulation board
4.5.2.5 Insulated windows sill
4.5.2.6 Flashings
4.5.2.7 Downspouts
4.5.2.8 LPS system down conductor
4.5.3 Internal cladding
4.6 ENVIRONMENTAL CONDITIONS
4.7 WARRANTY
4.7.1 Manufacturer's Warranty
4.8 ENERGY SAVING MATERIALS
4.8.1 General approach
4.8.2 Technology
4.8.3 Cork panel
4.8.4 Hemp Fiber Panels, type CANATON d100 or equal approved
4.8.5 Hemp bricks
4.8.6 Cellulose-Based Acoustical & Thermal insulation
4.8.7 Natural non-organic insulation materials
4.9 TYPICAL WALL TYPES SCHEDULE FOR REAL PROPERTY CAPITALIZATION USE
4.9.1 Shop drawings and Data Sheet record
SECTION A-5 REINFORCED CONCRETE RESTORATION
5.1 REFERENCES
5.2 SUBMITTALS
5.2.1 Manufacturer Catalog Data
5.3 DELIVERY STORAGE AND HANDLING
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 6
5.4 PRODUCTS
5.5 EXECUTION
5.5.1 2cm thick single layer
5.5.2 Cost increase for each additional cm
5.5.3 Field sample and test
5.6 ENVIROMENTAL REQUIREMENTS
SECTION A-6 RESIN FLOOR
6.1 REFERENCES
6.1.1 Manufacturer’s Publications/Manuals
6.2 SUBMITTALS
6.2.1 Product Data
6.2.2 Design Mixing Data
6.2.3 Certifications
6.3 DELIVERY AND STORAGE
6.4 PRODUCTS
6.5 APPLICATION
6.5.1 Surface preparation
6.5.1.1 New Concrete Floors
6.5.1.2 Existing Concrete Floors
6.5.1.3 Sandblasting
6.5.1.4 Waterblasting
6.5.1.5 Shotblasting
6.5.1.6 Vacuum of Dust
6.5.2 Application
6.5.2.1 High Thickness Multi-Layer Floor
6.5.2.2 Low Thickness Resin Floor
6.5.3 Joints
6.5.4 Field Quality Control
SECTION A-7 ROAD MARKINGS
7.1 REFERENCES
7.2 SUBMITTALS
7.2.1 Product Data
7.2.2 Samples and colors
7.2.3 Approval of material
7.3 MEASUREMENTS
7.4 DELIVER AND STORAGE
7.5 PRODUCTS
7.5.1 Premixed Reflective Traffic Paint
7.5.2 Post sprayed Reflective Traffic Paint
7.5.3 Non-Reflective Traffic Paint
7.5.4 Glass beads features
7.6 APPLICATION
7.6.1 Surface preparation and removals
7.6.1.1 Sandblasting
7.6.1.2 Waterblasting
7.6.1.3 Shotblasting
7.6.1.4 Continuous lines, width up to 30 cm
7.6.1.5 Broken lines, width up to 30 cm
7.6.1.6 Continuous lines, width 30 to 50 cm
7.6.1.7 Broken lines, width 30 to 50 cm
7.6.1.8 Area
7.6.1.9 Letters
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 7
7.6.1.10 Road arrows, full size
7.6.1.11 Road arrows, half size
7.6.1.12 Road arrows, 2x full size
7.6.2 General
7.6.3 Reflective Traffic Paint (Post Spray)
7.6.3.1 Road Lines - 15 cm wide continuous line
7.6.3.2 Road Lines - 15 cm wide broken line
7.6.3.3 Road Lines - 20 cm wide continuous line
7.6.3.4 Road Lines - 20 cm wide broken line
7.6.3.5 Road Lines - 30 cm wide continuous line
7.6.3.6 Road Lines - 30 cm wide broken line
7.6.3.7 Road Lines- 50 cm wide continuous line
7.6.3.8 Letter 160 cm high x 50 cm wide
7.6.3.9 Reflective painted cross walk bar, 250 cm x 50 cm
7.6.3.10 Reflective painted cross walk bar, 125 cm x 50 cm
7.6.3.11 Reflective painted road arrows, Full size
7.6.3.12 Reflective painted road arrows, Half size
7.6.3.13 Reflective painted road arrows, 2x Full size
7.6.3.14 Reflective area painting
7.6.4 Non-Reflective Traffic Paint
7.6.4.1 Road Parking Lines - 12 cm wide continuous line -parking
7.6.4.2 Road Parking Lines - 15 cm wide continuous line
7.6.4.3 Road Parking Lines - 15 cm wide broken line
7.6.4.4 Road Parking Lines - 20 cm wide continuous line
7.6.4.5 Road Parking Lines - 20 cm wide broken line
7.6.4.6 Road Parking Lines - 30 cm wide continuous line
7.6.4.7 Road Parking Lines - 30 cm wide broken line
7.6.4.8 Road Parking Lines - 50 cm wide continuous line
7.6.4.9 Letter 160 cm high x 50 cm wide
7.6.4.10 Non-reflective painted cross walk bar, 250 cm x 50 cm
7.6.4.11 Non-reflective painted cross walk bar, 125 cm x 50 cm
7.6.4.12 Non-reflective painted road arrows, Full size
7.6.4.13 Non-reflective painted road arrows, Half size
7.6.4.14 Non-reflective painted road arrows, 2x full size
7.6.4.15 Non-reflective - Area painting
7.6.5 Elastoplastic laminate markings
7.6.5.1 15 cm wide continuous line
7.6.5.2 15 cm wide broken line
7.6.5.3 20 cm wide continuous line
7.6.5.4 20 cm wide broken line
7.6.5.5 30 cm wide continuous line
7.6.5.6 30 cm wide broken line
7.6.5.7 50 cm wide continuous line
7.6.5.8 Cross walk bar, 250 cm x 50 cm
7.6.5.9 Cross walk bar, 125 cm x 50 cm
7.6.5.10 Letter 160 cm high x 50 cm wide
7.6.5.11 Road Arrow, full size
7.6.5.12 Road Arrow, half size
7.6.5.13 Road arrow, 2x full size
7.6.6 Symbols and special signs
7.6.6.1 Handicap Symbol
7.6.6.2 “GOV ONLY” sign
7.6.6.3 “ECP” sign
7.6.6.4 “Warning” sign
7.6.6.5 “Danger” sign
7.7 FIELD SAMPLE AND TEST
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 8
7.7.1 Inspection
7.7.2 Dimensional tolerances
7.8 ENVIRONMENTAL REQUIREMENTS
7.8.1 Weather Limitations for Application
7.8.2 Weather Limitations for Removal of Pavement Markings on Roads and Parking areas
SECTION A-8 AIRFIELD MARKINGS
8.1 REFERENCES
8.2 SUBMITTALS
8.2.1 Product Data
8.2.2 Samples and colors
8.2.3 Qualifications for airfield Marking Personnel
8.2.4 Approval of material
8.3 MEASUREMENTS
8.4 DELIVER AND STORAGE
8.5 PROJECT SITE CONDITIONS
8.5.1 Airfield Traffic Control
8.5.2 Airfield Radio Communication
8.5.3 Airfield Emergency Landing and Takeoff
8.6 PRODUCTS
8.6.1 Premixed Reflective Paint
8.6.2 Post sprayed Reflective Paint (Post spray)
8.6.3 Premixed Reflective Paint and Post Sprayed Microspheres
8.6.4 Non-Reflective Paint
8.6.5 Glass beads
8.7 APPLICATION
8.7.1 Surface preparation
8.7.1.1 Waterblasting
8.7.1.2 Continuous lines, width up to 30 cm
8.7.1.3 Broken lines, width up to 30 cm
8.7.1.4 Continuous lines, width 30 to 50 cm
8.7.1.5 Broken lines, width 30 to 50 cm
8.7.1.6 Area
8.7.1.7 Letters
8.7.1.8 Road arrows, full size
8.7.1.9 Road arrows, 2x full size
8.7.2 General
8.7.3 Retro Reflective Media
8.7.4 Reflective Paint and Post Sprayed Microspheres
8.7.4.1 Lines - 15 cm wide continuous line
8.7.4.2 Lines - 15 cm wide broken line
8.7.4.3 Lines- 50 cm wide continuous line
8.7.4.4 Lines – 910mm continuous line
8.7.4.5 Letter 190 cm high x 60 cm wide
8.7.4.6 Arrow, Full size
8.7.4.7 Reflective area painting
8.7.5 Semi-Refractive Paint
8.7.5.1 Lines – 150mm continuous line
8.7.5.2 Lines – 500mm continuous line
8.7.6 Non-Reflective Paint
8.7.6.1 Lines - 15 cm wide continuous line
8.7.6.2 Lines - 15 cm wide broken line
8.7.6.3 Area painting
8.7.7 Signs
8.8 FIELD SAMPLE AND TEST
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 9
8.8.1 Inspection
8.8.2 Dimensional tolerances
8.9 ENVIRONMENTAL REQUIREMENTS
8.9.1 Weather Limitations for Application
8.9.2 Weather Limitations for Removal of Pavement Markings on Roads and Parking areas
8.10 SPECIAL SIGNS
8.10.1 “GOV ONLY” signs:
8.10.2 “ECP” signs:
8.10.3 “Warning” signs:
8.10.4 “Danger” signs:
SECTION A-9 APPLICABLE MASTER SPECIFICATIONS
Section 01101 Project Sign Section 02761 Pavement and Airfield Markings Section 07214 Board Insulation Section 07231 Wall Insulation Section 07240 Exterior Insulation and Finish Systems Section 09212 Exterior Stucco Section 09220 Interior Plaster Section 09900 Paints and Coatings
SECTION A-10 MATERIAL/SYSTEMS DATA SHEET (ONLY ON ELECTRONIC FORMAT)
01_Rasatura armata 02_Celenit_Vital_cellulosa 03_Scheda_Corkpan 04_Canapa_ST-CANATON-D100 05 Concrete repair 06 Road Marking 07_Conpaviper manual 08_Assovernici Manual 09_Glass microsphere 10_Anticarbonation Paint
11_ETL_04_2
12_Resin flooring
ANNEX
Fire Safety Guide and Check List
SECTION A-1 GENERAL
1.1 WORK SITE CONDITIONS
1.1.1 Work Site Availability
Due to the particular uses of some areas, the contractor may be required to perform work during weekends, nights and weekend nights. Work during weekends, nights and weekend nights will be coordinated and authorized in advance by C.O. The work area is subject to restrictions and controls of a military nature. In case of exercises or other operational requirements, the contractor may be required to remove his personnel and equipment from the area without advance notice in accordance with contract clauses.
The government will not be held liable for unproductive time and other related costs due to delays for unannounced suspension of work due to military operations and/or exercises or safety reasons.
The government will only negotiate an equitable extension of the performance period based on documented delays and unannounced suspensions of work.
1.1.2 Work Site Access
Access to work sites cannot be totally blocked. Work shall be planned to guarantee at least limited access. Should it become necessary for the contractor to totally block access to an area in the performance of contract requirements, such blockage shall be coordinated with and approved by the contracting officer or his designated representative. The request for approval of the blockage must be submitted to the contracting officer a minimum of 12 calendar days prior to the desired closure date.
Prior to starting any work, the contractor shall submit a Work Plan for approval by the Contracting Officer and user, in order to avoid interferences with user activities.
1.1.3 Transportation of Personnel and Materials
It shall be the contractor's responsibility to provide for the transportation of his personnel to and from the job-site as well as load, transport, unload and/or place all supplies, materials, equipment, and refuse involved in this contract.
Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area; unless such operations will obstruct traffic flow.
1.1.4 Protection of Persons and Property
Adequate protection of persons and property shall always be provided. No material or debris shall be burned at the work site. All movable equipment and materials within the work area shall be moved or sufficiently protected by the contractor. The contractor upon completion of work in that area shall reposition materials or equipment moved during work. If required by the delivery order, the contractor shall erect a temporary construction fence, 2 meters tall, to restrict access to the work site.
1.1.5 Availability of Utilities
Water and electric utilities will be provided free of charge to the contractor. Characteristics of available electricity and point of connection for both electricity and water will be identified for each work site on each delivery order. The contractor shall provide and maintain, at their own expense, the necessary temporary service lines from existing outlets to his work site. In those instances where the work site is sufficiently distant from available utilities as to make connection impractical, the contractor shall be responsible for providing the required utilities at his own expense through portable means.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 10
The contractor shall furnish all labor, materials, equipment and tools and shall perform all operations to accomplish works under this contract at Aviano AB, Aviano, Italy and other Separated Sites (G.S.U.)
within Italy.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 11
Use of utilities, considering the conservation of energy and water, shall be limited to the minimum necessary.
1.1.6 Traffic Control and Protection
The contractor shall place warning signs directly at the work site and at least five (5) meters ahead of the work site (in the affected traffic line) to alert approaching traffic from both directions.
Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or laydown areas, where applicable. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
The Contractor shall not park outside the construction zone unless approved through BCE.
The Contractor shall clearly identify their vehicles using company logos or signs on their vehicles
1.1.7 Airfield Safety and Restricted Areas Training
To allow Contractors performing works inside the restricted areas, is mandatory for them personnel to attend the training at Bldg.1023 and receive the driving license for restricted areas and airfield.
1.1.8 Hazmat Housekeeping
Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
Safety Data Sheets: The Contractor shall furnish English language versions of the Safety Data Sheets (SDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEIE for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the SDS form to the Contractor.
Hazardous Waste Management Plan: The Contractor shall provide a hazardous waste management plan.
Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEIE office.
Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers. Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEIE through the Director of Works and Fire Department approval is required, see the attached Fire Department check list.
1.1.9 Project sign
The Contractor shall furnish two project signs on site, one in accordance with Section 01101 and one in accordance with Law 81/08.
The sign shown in section 01101 shall be made of a durable material and maintained in good condition.
Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 12
contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, except for company vehicles. Contractors shall submit sign proposal to CE for approval.
When applicable the contractor shall provide a portable sign, A3 format, showing all contract and job information included in section 01101.
1.1.10 Toilet Facilities
Contractor's personnel may use toilet facilities available in the vicinity of the work site. Contractor personnel shall ensure facility cleanliness is always preserved.
1.2 DEFINITIONS
1.2.1 Paint:
The term "paint" as used herein, includes emulsions, enamels, paints, stains, varnishes, sealers, cement-emulsion filler, and other coatings, whether used as prime, intermediate, or finish coats.
1.2.2 Pavement Markings
Pavement markings are composed of all the stripes and the inscriptions that can be found on the pavement surface with the function of prescription or indication in order to regulate the circulation of vehicles, airplane and people.
Paint will be suitable for concrete and asphalt surfaces, with properties of high adherence and high resistance to abrasion, wear, environmental agents, fuels and oils including chemical / superficial crumbling (sgretolamento) resistance to bituminous surfaces. Paints shall be characterized by very short drying times, good adhesion and elasticity, and high abrasion resistance.
1.2.3 Resin Floor
A resin floor is a hard-wearing plastic surface, created by mixing together a selection of ingredients to initiate a fast and controlled chemical reaction. The chemical reaction creates a highly durable finish, ideal for the heaviest use environments.
Three main types of resin are used to create majority of resin flooring systems: Epoxy; Methyl Methacrylate (MMA); Polyurethane (PU)
1.2.4 Wall Cladding – Insulation and finish system
The insulation and finish system are a job-fabricated exterior/interior wall covering consisting of insulation board, reinforcing fabric, base coat, finish coat, adhesive and mechanical fasteners as applicable, trim accessories, sealant, flexible-membrane flashings, water-resistant coatings, sealers and ancillary items a required for a complete system.
The system components shall be compatible with each other and with the substrate as recommended or approved by manufacturer. All materials shall be installed by an applicator approved by the system manufacturer.
1.2.5 Plaster
The plaster is a protective coating layer of the walls. In addition to its protective function, it sometimes has an aesthetic function. It is a mortar composed of a binding part (hardener) that incorporates sand with a selected granulometric size with a maximum diameter generally not greater than 2 millimeters.
Plasters are distinguished according to the binder used: lime-based plaster; lime-cement plaster; plaster
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 13
based on gypsum, where the binder is exclusively gypsum; plaster based on clay, where the only binder is clay
1.2.6 Reinforced Concrete Restoration
The reconstruction or renewal of concrete parts of an existing structure for its maintenance or to correct deterioration, damage, or faulty.
Reinforced concrete restoration consists of four basic steps: 1. Determine the cause(s) of damage; 2.
Select the repair method and material; 3. Prepare the existing concrete surfaces and steel bars, by removing deteriorated conglomerate and bars cleaning by brushing or sandblasting; 4. Cure the repair properly with a passivating treatment of reinforcing rods and installation of concrete mortar to restore concrete and final finishing.
1.3 CONTRACTOR QUALIFICATIONS
1.3.1 SOA Certifications
The contractor shall provide to the Contracting Office the following SOA (Società Organismi di Attestazione) certifications in accordance with contract requirements and clauses
1.3.2 Safety and Health
Contractor's activities shall be in compliance with the following: OSHA 29 CFR 1926 Construction Regulations, US Corps of Engineers Manual EM385-1-1 Nov. 2014, AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards, and Italian Legislative Decree 81/08 including subsequent amendments: in case of any differences, the more stringent applies.
An appointed professional shall develop a site-specific safety plan (PSC - Piano di Sicurezza e Coordinamento), in accordance with Legislative Decree 81/08). PSC is considered equivalent to the Accident prevention plan required by Manual USACE EM385-1-1.
Contractor shall consider in advance interference hazard through a preliminary assessment plan: the DUVRI - Documento Unico per la Valutazione Rischi da Interferenze shall be coordinated with 31 FW/CCPP Base employees safety representative (Phone 0434 30 5709), in accordance with Legislative Decree 81/08.
Contractor shall develop a site specific plan for operational safety (POS - Piano Operativo di Sicurezza) in accordance with Legislative Decree 81/08, prior to starting planned work activities. Employees training certificates shall be included in the POS documents.
Contractor's representatives shall receive a safety briefing during the pre-performance conference from Base 31 FW/SEG Occupational Safety Office. Electronic copy of POS will be provided to 31 FS/SEG (Phone 0434 30 4817).
Contractor’s activities within confined spaces are covered by OSHA 29 CFR 19.26.1200 and OSHA 29 CFR 1910.146, respectively for Construction and General Industry. Mentioned regulations shall be coordinated with Italian presidential decree DPR 177, dated 14 SEP 2011. Mandatory prescriptions on confined space shall be taken into consideration at the design stage for new contracts as well as for maintenance and repair contracts.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 14
1.3.2.1 Antenna systems and Safety
The Contractor shall contact 31° CES 72 hours prior to working in the vicinity of an antennas for radiation prevention and to avoid interferences with base operations. The contractor shall not remove or disconnect cables, antenna systems without prior coordination with 31° CES.
1.3.3 Workmanship
All works shall be performed in a neat and professional manner by skilled labor from the appropriate trades. The works shall be executed strictly in accordance with the delivery order(s) and with the best standard trade practices.
Application of paint by airless spray shall be accomplished by firms or persons possessing the experience requirements set forth herein. Prior to any application of coating by airless spray, submit data for approval to the Contracting Officer that indicates that the Contractor has successfully applied paint by airless spray or has a firm contractual agreement with a subcontractor having such required experience. The data shall include the names and locations of not less than two sites where the Contractor or Subcontractor referred to herein has applied paint by airless spray. Indicate the type and design of the equipment, including safety devices, and certify that the method of applying coating has been performed satisfactorily.
1.3.4 Quality Control
Contractor shall establish and maintain an effective quality control (QC) system.
QC consist of plans, test, procedures, and organization necessary to produce a product which complies with the Contract requirements. The QC system covers all design and construction operations, both onsite and offsite, and be keyed to the proposed design and construction sequence. The contractor shall appoint a project superintendent, fluent English speaking, who will be held responsible for the quality of the work execution, as per F.A.R. 52.246-12.
1.3.5 Warranty
Contractor shall provide a written guarantee with which he will guarantee all works and materials are of good quality and agrees, under reasonable conditions, that he will provide at his own expense all the necessary repairs required in case of the existence of discrepancy or defect.
1.4 WASTE MANAGEMENT
The contractor will be responsible for the disposal of debris from the work site. The material will be disposed of in an authorized dumping area outside the base upon completion of the work, it includes the payment of dump fees. Transportation, storage, use, and disposal of materials utilized by the contractor to perform the work shall be at the contractor's expense and the contractor shall not utilize government facilities for these purposes.
The contractor shall provide to Base Representatives one (1) copy of the “Formulario Identificazione dei Rifiuti" (so-called FIR), in compliance with D. Lgs. n. 22/1997 and D. Lgs. n.152/2006 Disposal of materials in violation of the applicable laws (i.e. Law D.lgs 152/2006 as subsequently amended and supplemented) will result in a material breach of the contract.
It shall be the responsibility of the Contractor to handle and dispose hazardous material in the appropriate manner, as prescribed by Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 15
Removal, handling and disposal of hazardous material materials shall be in compliance with all local and national applicable regulations.
It is not allowed to wash brushes into the available sinks or discharge paint contaminated water into the drainage system or on ground.
1.5 SCAFFOLDING:
The contractor shall provide enough and appropriate scaffolding in accordance with Italian safety codes, D. Lgs 81/2008, Titolo IV.
The contractor shall be held responsible for any damage to U.S. Government property resulting from improper use of scaffolding.
When applicable, the Contractor shall provide the “Assembly, use and disassembly scaffolding plan (PIMUS)” in compliance with D.L. 235/03.
1.6 CLEANING:
At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the surfaces involved in the work ,the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 16
SECTION A-2 PAINTING
2.1 REFERENCES
UNI8681 Products for painting systems, painting, RPAC, painting and surface impregnation. General classification criteria.
DL 161/2006 Implementation of Directive 2004/42 / EC, for the limitation of emissions of volatile organic compounds resulting from the use of solvents in certain paints and varnishes, as well as in bodywork products
UNI EN ISO 12944 Paints and varnishes - Protection against corrosion of steel structures by painting
UNI EN ISO 6270 Paints and varnishes - Determination of moisture resistance
UNI EN ISO 1514 Paints and varnishes - Standardized panel for checking tests
UNI 11021 Paints and varnishes - Coating material and coatings systems for rooms with the presence of foodstuff - Requirements and test methods
For what follow in this section of the document refer also to sections of the Master Technical Specifications for Construction Projects at Aviano AB, Italy, as updated and attached to this Technical Specification:
09900 Paints and Coatings
2.2 SUBMITTALS
2.2.1 Manufacturer Catalog Data
Manufacturer data sheet shall include as minimum:
- Product features
- UNI 8681 classification
- Voc (Volatile Organic Compounds) Classification, Directive 2004/42 / CE
- Safety Data sheet
- Manufacturer’ instructions
- Storage recomendations
2.2.2 Samples and colors
The contracting officer shall approve colors of finish coats. Colors of finish coats shall be indicated on individual delivery orders. Where colors are not indicated, the colors shall be as selected by the contracting officer. Manufacturer's names and color designations, if indicated, are used for the purpose of color designations only and are acceptable for use on this project only if they conform to all specified requirements. Products of other manufacturers are acceptable if the color matches the color indicated and the products conforms to all specified requirements.
All building exterior surfaces shall be painted to match the Base standard color range based on RAL and NCS (Natural Color System).
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 17
2.2.3 Approval of material
No paint or other coating shall be applied or used on any project unless approved by the contracting officer. All requests for substitutions must also be submitted to the contracting officer for approval.
Each such request shall include specific identification of the proposed substitute, justification for the necessity of the substitution, a tabulation of the specified material compared to the proposed substitute which clearly indicate any deviations from the specified requirements. All material shall meet the standards of the Ente Nazionale Italiano di Unificazione (UNI) 8681.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials
2.3 MEASUREMENTS
Quantities shown on work orders shall be computed as follows:
- Walls and Ceilings: Square meters shall be in the gross surface area of wall or ceiling to be painted with no deductions made for each door, window and any other opening under 4 sq.
meters. All openings exceeding 4 sq. meters shall be deducted from the full size surface and all related incidental jambs shall be added. Only project elements that exceed 15 cm. shall be added to the gross surface.
- Doors and Similar items: For each side to be painted, the area shall be calculated as the net area of the opening. This will include the trim, head and jamb. Glazed surfaces shall not be deducted.
- Windows: For each side to be painted, the area to be considered shall be the net area of the opening; the fixed frame and sill are included.
- Shutters: The area to be considered shall be calculated using three times the net area of the opening for payment purposes. The fixed frame is included in this quantity.
- Roll Up Shutters: The area to be considered shall be two and a half times the net arms of the opening, the drum casing is to be completed separately.
- Ordinary Metal: Simple metal works without any metal ornamentation, such as large windows and sky lights shall be calculated as three fourths of their full surface projected on a vertical plane.
- Ornamental Metal: The area of items such as railings, gates, and fences shall be calculated as their full surface projected on a vertical plane.
- Roll Up Doors with Metal Slats: The area to be considered shall be two times the net area of the opening measured between sill and head. This will compensate for the painting of the concealed curtain surfaces.
- Piping: The actual linear meter will be used, based upon pipe diameter, when piping is not flush with walls and ceilings.
- Plastering: Area will be computed by measuring the actual surface to be plastered. All openings will be deducted; all jambs and projecting out elements shall be added.
- Scaffolding: The measurement of scaffolding shall be based on square meters of vertical surface to be painted. When applicable, the Contractor shall provide the “Assembly, use and disassembly scaffolding plan” in compliance with D.L. 235/03.
2.4 DELIVERY AND STORAGE
The contractor shall store all materials and equipment only in areas approved by the contracting officer or designated representative. Space available for storage of equipment and materials by the contractor is very limited. Security of stored items remains the responsibility of the contractor.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 18
Contractor shall display a nameplate on the exterior of all storage units with the name of the Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached Deliver paint and coating materials in unbroken original packages bearing the manufacturer’s name and brand designation, specification number, batch number, color, date of manufacture, and manufacturer’s instructions for application. Storage of paints and paint materials and the mixing of paints shall be restricted to the directed locations.
2.5 PRODUCTS
The contractor shall furnish all required paint, thinners, enamels, synthetic emulsions, varnish, spackling compound, fillers, tapes, adhesives, sealers and other materials necessary for the proper preparation of surfaces to be painted and for the proper application of paint. All paints and colors shall be subject to the approval of the contracting officer, or his designated representative. The contractor shall, without charge, replace any material found by the United States Government that does not conform to the contract requirements.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
2.5.1 Siloxane Paint
Paint based on siloxane binders designed for the protection and decoration of new and old walls that require a high water vapour permeability combined with excellent water repellency and optimal protection to withstand aggressive environmental agents, in all weather conditions. Suitable for new and old plaster.
Main features:
− Exterior/Interor wall surfaces − Perspiring.
− Water repellent.
2.5.2 Latex Paint
Synthetic latex resin emulsion paint for use on interior/exterior-plastered surfaces; quick drying and washable. Interior latex paints shall have a matte or semi-gloss finish as specified in the individual delivery orders.
Main features:
− Exterior/Interor wall surfaces − Washable.
2.5.3 Methyl-silicon paints
Non-film, water-based, with nano quartz particles, high strength, durability, cleanliness and color brilliance, high diffusion power and water repellency.
Main features:
− Exterior wall surfaces.
− Washable.
− High strenght and dudrability
2.5.4 Acrylic Based Plastic Coating
Ready-to-use outdoor coating, based on special acrylic resins, aggregates with controlled granulometry, U.V. pigments and resistant alkalis and functional additives. The product suitable for the protection of external facades thanks to its characteristics of elasticity, durability and water repellency, suitable for application by brush.
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 19
Main features:
− Exterior wall surfaces.
− Protection of external facades
2.5.5 Transpiring Water-Based Paint for Indoor
Recommended for the painting of kitchens and bathrooms where there is condensation. Formulated with pigments free of heavy metals polluting and free of organic solvents. General features: high coverage;
high white point; easy applicability; perfect breathability.
Main features:
− Interor wall surfaces – Ideal for wet area as bathrooms.
− Higly Perspirant
2.5.6 Water-dilutable Enamel
High performance indoor/outdoor wall paint, with very low environmental impact, particularly suitable for walls in very crowded areas and exposed to deterioration or wear. Excellent resistance to washing, resistant to superficial stress and easily removable. Glossy, satin or matt finish.
Main features:
− Interor/exterior wall surfaces − Washable.
− Ideal for crowded areas
2.5.7 Water-based Enamel – HACCP standard
Multi-use odorless water-based enamel for iron, aluminum, wood, walls, polystyrene, PVC plastic, single-component glossy or satin acrylic suitable for use in rooms with presence of food according to the UNI11021: 2002 standard on the HACCP methodology and application on games for children according to EN 71: 3. Resists light and yellowing. It protects and decorates the furnishing accessories.
Main features:
− Interor surfaces − Suitable Wall, Metal and wood surfeces − Washable − Ideal for room with presence of food, in compliance with HACCP standard
2.5.8 Anti-carbonation Paint
Waterproof anti-carbonation paint to protect and decorate surfaces in concrete. Is it suitable to prevent the stage of carbon dioxide ensuring protection of substrates from degradation due to carbonation?
Main features:
− Interor/exterior concrete surfaces
2.5.9 Silicon Paint
Transparent silicon water-repellent coat to protect brick walls, clay tiles and similar finishes. Stucco or silicon sealing will be used for window glass, doors, and screens.
Main features:
− Interor/exterior brick walls surfaces
2.5.10 Elastomeric Compound
Sealing of horizontal/vertical joints with adequate elastomeric compound. Item includes preparation of surface and laying of neoprene cord of adequate diameter, sealant material should be weatherproof, good chemical protection and varnishable.
Main features:
− Interor/exterior horizontal/vertical joints
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 20
2.5.11 Rust Inhibitive Paint
As primer coating for galvanized surfaces and for all steel interior and exterior surfaces to be painted.
Shall consist of an emulsion of zinc chromate pigment and special synthetic resin base vehicle and suitable for application by spray or brush. The use of red lead paint is prohibited.
2.5.12 Synthetic Enamel
Shall consist of special synthetic resin base vehicle and pigment, suitable for use on interior plastered surfaces, interior and exterior woodwork and metal work, and suitable for application by brush, rollers or spray equipment, quick drying semi-gloss or gloss finish.
Main features:
− Interor wall surfaces − Metal surfaces − Wood surfaces
2.5.13 Heat Resistant Primer and Paint
Shall consist of aluminum powder pigment in a special synthetic resin base suitable for heat resistance up to 80 degrees Centigrade. Quick drying type and suitable for application by brush on radiators (termosifoni).
2.6 EXECUTION
2.6.1 Description of work
The description of work executed under this contract will be defined within the individual delivery orders.
2.6.2 Protection of Areas and Spaces
Remove, mask, or otherwise protect prior to surface preparation and painting operations such items as hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, and similar items in contact with coated surfaces. Following completion of painting, reinstall removed items utilizing workmen skilled in the trades involved for such removal and reinstallation. Protect from contamination of coating materials, all surfaces not to be coated. Restore surfaces that are contaminated by painting materials to original condition. All moveable equipment, materials and furnishings within the areas to be worked in shall be moved or sufficiently protected by the contractor.
Government personnel will remove electronic furniture items prior commencement of the work.
2.6.3 Defects in Existing Surfaces
Repair, smooth, sand, spackle, or otherwise threat to render practically imperceptible in the finished work defects such as scratches, nicks, cracks, gouges, spalls, and irregularities due to partial peeling of previous paint coatings. Where impractical to satisfactorily eliminate the defects by other means, remove existing coatings from the entire surface, repair the surface as necessary, prime and repaint.
Where peeling is general over an area including self-contained portions of a surface, remove all paint in such area and sand out the edges of such removal to provide imperceptible transition.
2.6.4 Preparation of Surfaces – Removals
2.6.4.1 Wall paint removal
Removal of old paint from walls and ceilings by means accurate scraping and brushing with metal brushes, including removal of nails, grouting of holes and cracking, loading and
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 21
transportation of resulting materials to authorized public dump area, the payment of the dump fees and all operations necessary for the workmanlike execution of the work.
2.6.4.2 Quartz acrylic coating removal
Removal of quartz acrylic coating by using suitable paint remover applied with a brush or roller. After the paint remover has been applied, proceed with the removal of quartz lining with a rigid spatula or a special scraper to be placed under the coating. All workers shall be equipped with protective equipment such as acid-resistant gloves and respiratory masks. It includes loading and transportation of resulting materials to authorized public dump area, the payment of the dump fees and all operations necessary for the workmanlike execution of the work.
2.6.4.3 Paper coating removal
Removal of paper coating applied on walls by using brush, including removal of profiles, accurate scraping of the bottom, consumables, protective cloths and final cleaning, it includes loading and transportation of resulting materials to authorized public dump area, the payment of the dump fees and all operations necessary for the workmanlike execution of the work.
2.6.4.4 Wood paint removal
Removal of old paint from wood surfaces by scraping with iron brushes or paint strippers, to give the surface suitable for receiving the new primer paint, including consumables, sandpapering, loading and transportation of resulting materials to authorized public dump area, the payment of the dump fees and all operations necessary for the workmanlike execution of the work.
2.6.4.5 Metal paint removal
Removal of old paint from metal surfaces by scraping with iron brushes or paint strippers, to give the surface suitable for receiving the new primer paint, including consumables, sandpapering, loading and transportation of resulting materials to authorized public dump area, the payment of the dump fees and all operations necessary for the workmanlike execution of the work.
2.6.4.6 Sealing removal
Removal of stucco or silicon sealing used for window glass, doors, and screens by using metal scraper or silicone chemical stripper.
2.6.5 Preparation of Surfaces – Cleaning
Remove all dirt, rust, scale, splinters, loose particles, disintegrated coatings, grease, oil, old paints and other objectionable substances from all surfaces which are to be coated or otherwise finished. Allow putty to thoroughly set before coating. Sandpaper entire surface of existing enamel and other glossy surfaces before application of any coatings, spot prime with a brush all exposed nails and other ferrous metal with zinc chromate primer. Prior to painting, the contractor shall ascertain the compatibility of the paints ordered for use on the existing surfaces. Major items of repair or discrepancies discovered during preparatory work shall be reported to the contracting officer prior to proceeding.
2.6.5.1 Water blasting
Water blasting shall consist of washing surfaces to receive paint with a pressure spray, to remove loose paint, dirt, and other foreign or deleterious materials. The working pressure shall be between 2.0 and 3.0 MPa at a nozzle operating rate of a minimum 75 liters per minute
SECTION A - TECHNICAL SPECIFICATIONS FOR PAINTING 22
2.6.5.2 Sand blasting
Sand blasting shall consist of washing surfaces to receive paint with a pressure spray of micronized spray, to remove loose paint, dirt, and other foreign or deleterious materials. The working pressure shall be between 2.0 and 3.0 MPa.
2.6.5.3 High-pressure water blasting
High pressure water blasting is the use of high-pressure water between 5,000 to 10,000 psi (34 to 70 MPa) to remove grime, loose paint, mud, mold, dust and other types of stubborn dirt on the surfaces of buildings, pipes and many more items it may be used to clean masonry, stone or tile surfaces
2.6.5.4 Concrete and Masonry
Remove dirt, fungus, grease and oil prior to application of coatings. Wash new and previously unpainted surfaces with a solution of from 60 to 230 ml of trisodium phosphate per liter of hot water and then rinse thoroughly with fresh water. Wash previously coated surfaces with a suitable detergent and rinse thoroughly. Remove glaze, all loose particles, and scale by wire brushing. Remove efflorescence by scraping, wire brushing, and washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid and then wash thoroughly with fresh water, removing all traces of the acid. Give all new surfaces to be painted with other than cement-water paint a neutralizing treatment consisting of 250 grams of zinc sulfate in one liter of warm water. Apply the neutralizer liberally and allow to dry, then rinse the surfaces thoroughly with clean water and allow to dry for not less than 48 hours before paint is applied.
2.6.5.5 Wallboard and Plaster
Prior to painting, all joints, cracks, holes, and other surface defects shall be repaired with patching plaster or spackling compound and sanded out smooth. New plaster to be coated shall have an instrument-measured moisture content of not more than 8 percent. In addition to moisture content requirements, plaster shall be allowed to age a minimum of 30 days before application of coatings.
2.6.5.6 Metal Surfaces except hot metal surfaces