As the Pontiac tower is today 7-5-17.pdf

PDF 108 KB Posted

Attached to
MPSCS Oakland County, Pontiac Tower #1203 Tower Modification
Solicitation number
RFP-171-180000002872-1
Issued by
Oakland County, Michigan

About this file

This document appears to be a technical specification and layout diagram showing antenna and radio equipment configurations for what appears to be a communications tower in Pontiac. The document includes three pages - a detailed equipment list, a hexagonal tower diagram showing equipment placement, and a grid layout showing equipment locations.

The specifications detail various antenna and radio equipment installations, including multiple stainless steel cabinets, omni antennas ranging from 5' to 15' in length, and coaxial cable runs of different sizes (7/8" to 1-1/4"). The equipment is mounted at various heights ranging from 188' to 286' on the tower structure. The document indicates specific orientation requirements (north, south, east, west faces) for different pieces of equipment. Several entries note "No Radio" designations with specific mounting details or frame specifications. The tower appears to be part of a communications infrastructure project, though the specific jurisdiction or agency is not explicitly stated in the provided documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .