This document is a Contractor's Request for Payment Transmittal form for a federal contract. The form includes details such as the contract number, project location, partial payment number, requisition number, period of performance, and a breakdown of the payment request including the original contract amount, change orders, value of work completed, value of material stored, retainage, and net amount due. The contractor must certify that the payment request is in accordance with the contract terms and that all subcontractor and supplier payments have been made.

The related federal contract opportunity is for the installation of terraces at a facility in Temple, TX. This is a commercial item solicitation issued as a Request for Quotation (RFQ) under Solicitation Number 12805B24Q0601. The NAICS code is 561730 with a $9.5M small business size standard. The government intends to award a firm fixed price purchase order to the responsible offeror whose quote meets the technical specifications and is the lowest price technically acceptable. Quotes are due by 5:00 PM CT on September 6, 2024, and two site visits are scheduled on September 4-5, 2024.

View the file

Other files

File Type Posted
12805B24Q0601 updated.pdf PDF
Wage Rates TX20240022.pdf PDF
South Terrace Location Map.pdf PDF
12805B24Q0601.pdf PDF
SouthTerrace Topo Map.pdf PDF
SouthTerrace Aerial Map.pdf PDF
ARS 371 Construction Progress and Payment Schedule.pdf PDF
Terrace Standard.pdf PDF
South Terrace Design Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL

CONTRACT NO.

PROJECT

LOCATION

PARTIAL PAYMENT NO.

REQUISITION NO.

FOR PERIOD BEGINNING ENDING

FINAL PAYMENT

ITEM AMOUNT

1. Amount of original contract

2. Change orders and/or amendments

3. Total adjusted contract prices

4. Value of work completed to end of period

5. Value of material stored at the site (Itemize below)

6. Total value of work completed and stored material (Line 4 plus Line 5).

8. Total due contractor thru end of this period

9. Less previous requests

10. Net amount due contractor this payment

7. Less

MATERIAL STORED AT THE SITE (See Item 5 above) Description Value

CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION

SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE

RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate)

CONCUR (Signature of EPM or COR as appropriate)

DATE SIGNED

DATE SIGNED

DATE SIGNED

Form ARS-372 (06/2011) USDA-ARS This form was electronically produced by USDA/ARS/OCIO/EASB.

% retainage

The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;(1)

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.(4)

I hereby certify, to the best of my knowledge and belief, that -

Previous edition is not usable.

c:\\docume~1\\admini~1.for\\mydocu~1\\accounts\\usda2\\origin~1\\set3~1\\ars372.wpf Administrator D:20050417122932- 04'00' D:20050426102902- 04'00'

CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL

CONTRACT NO.

PROJECT

LOCATION

PARTIAL PAYMENT NO.

REQUISITION NO.

FOR PERIOD BEGINNING

ENDING

FINAL PAYMENT

ITEM

AMOUNT

1. Amount of original contract

2. Change orders and/or amendments

3. Total adjusted contract prices

4. Value of work completed to end of period

5. Value of material stored at the site (Itemize below)

6. Total value of work completed and stored material (Line 4 plus Line 5).

8. Total due contractor thru end of this period

9. Less previous requests

10. Net amount due contractor this payment

7. Less MATERIAL STORED AT THE SITE (See Item 5 above) Description Value

CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION

SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE

RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate) CONCUR (Signature of EPM or COR as appropriate)

DATE SIGNED

DATE SIGNED

DATE SIGNED

Form ARS-372 (06/2011)

USDA-ARS

This form was electronically produced by USDA/ARS/OCIO/EASB.

% retainage The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(1) (2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.

(4) I hereby certify, to the best of my knowledge and belief, that - Previous edition is not usable.

Check if Final payment.: 0
Enter date for period beginning using format MM/DD/YYYY.:
Enter date for period ending using format MM/DD/YYYY.:
Item. 1. Amount of original contract.:
Item 2. Change orders and / or amendments.:
Item 3. Total adjusted contract prices.:
Item 4. Value of work completed to end of period.:
Item 5. Value of material stored at the site (Itemize below).:
Item 6. Total value of work completed and stored material (Line 4 plus Line 5). Value of material stored at the site (Itemize below).:
Item 7. Enter Percent retainage.:
Item 7. Less indicated percentage retainage.:
Item 8. Total due contractor thru end of this period.:
Item 9. Less previous requests.:
Item 10. Net amount due contractor this payment.:
Value. Line 1.:
Value. Line 2.:
Value. Line 3.:
Value. Line 4.:
Value. Line 5.:
Value. Line 6.:
Value. Line 7.:
Value. Line 8.:
Value. Line 9.:
Contractor's request for payment transmittal. Enter contract number.:
Partial payment number.:
Project.:
Requisition number.:
Location.:
Description. Line 1.:
Description. Line 2.:
Description. Line 3.:
Description. Line 4.:
Description. Line 5.:
Description. Line 6.:
Description. Line 7.:
Description. Line 8.:
Description. Line 9.:
Value. Line 10.:
Value. Line 11.:
Value. Line 12.:
Value. Line 13.:
Value. Line 14.:
Value. Line 15.:
Value. Line 16.:
Value. Line 17.:
Description. Line 10.:
Description. Line 11.:
Description. Line 12.:
Description. Line 13.:
Description. Line 14.:
Description. Line 15.:
Description. Line 16.:
Description. Line 17.:
Enter date in this format MM/DD/YYYY:
Enter date in this format MM/DD/YYYY:
Enter date in this format MM/DD/YYYY:

File details come from the government source that posted it. Updated .