ARRC NEW 3-PHASE LINE, Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- ITB 25-12-213029
- Issued by
- Anchorage Municipality, Alaska
About this file
This file contains electrical engineering drawings from MBA Consulting Engineers for the Alaska Railroad Corporation's new 3-phase service line project at 1115 E. Whitney Road in Anchorage, AK. The project involves installing new electrical service, including demolishing existing pole-mounted panels, transformers, and overhead lines, and installing new pad-mounted transformers, service disconnects, meters, and underground conductors. The work includes installing a 75KVA 208Y/120V 3-phase transformer, relocating an existing fuel panel, installing flood lighting, and providing temporary generator power during construction.
The drawings detail power one-line diagrams, panel schedules, and site plans showing the electrical infrastructure modifications required. The work must conform to Municipality of Anchorage Standard Specifications, Chugach Electric Association requirements, and the Project Management and Engineering Department Design Criteria Manual. All raceway must be galvanized rigid metal conduit and copper conductors are required. The drawings are stamped by Professional Engineer Edward W. Carlson (EE-9354) with an expiration date of 08/28/2024. Reference drawings from Chugach Electric Association are included showing existing electrical infrastructure in the project area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
© 2024 MBA Consulting Engineers, Inc.
M B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
FACP
TTB/C
PC
OCCUPANCY SENSOR - CEILING MOUNT
LIGHTING FIXTURES - VARIOUS TYPES AS NOTED
BATTERY-POWERED EMERGENCY LIGHT
CALL-IN SWITCH
EXIT SIGN
PHOTOCELL PC
TELEPHONE TERMINAL BOARD/CABINET
FIRE ALARM CONTROL PANEL
PUSHBUTTON SWITCH
FIRE ALARM MANUAL STATION
FIRE ALARM HORN/STROBE
FIRE ALARM STROBE
FACP
F
H
FLEX
ABBR.
XFMR
SW
AC
C
E
WP
CKT
ETR
NTS
COMBINATION STARTER/DISCONNECT
MOTOR - SIZE AS INDICATED
SWITCH - TWO POLE
SWITCH - THREE WAY
SWITCH - OCCUPANCY SENSOR
SWITCH - FOUR WAY
SWITCH - THERMAL OVERLOAD
SWITCH - DIMMING TYPE
SWITCH - WITH TIMER
SWITCH - THREE WAY DIMMER
MOTOR DISCONNECT
MOTOR CONTROLLER
SWITCH - SINGLE POLE
TRANSFORMER, PAD-MOUNTED
T
T
HOMERUN TO PANEL/CIRCUITS AS NOTED
NEUTRAL, HOT, GROUND # 12 UON/SPECIFIED
DUPLEX RECEPTACLE - NEMA 5-20R
DUPLEX RECEPTACLE IN FLOOR BOX
QUADRUPLEX RECEPTACLE - NEMA 5-20R
RECEPTACLE - NEMA CONFIGURATION AS NOTED
JUNCTION BOX
PANELBOARD - SEE SCHEDULES
REFER TO INDICATED NOTE
TELECOM OUTLET X=NUMBER OF PORTS
J
VT
CONDUIT, CONCEALED. SIZE AS NOTED (TYP.)
EMERGENCY LIGHT, CIRCUIT, PANEL
CONDUIT, UNDERGROUND OR UNDERFLOOR
MULTI-OUTLET ASSEMBLY-RECEPTACLES AS INDICATED
ABOVE COUNTER
CONDUIT, FLEXIBLE
CONDUIT, EXPOSED
WEATHERPROOF
CIRCUIT - NUMBER AS NOTED (TYP.)
NOT TO SCALE
EXISTING TO REMAIN
EXPLANATION
M
SYMBOL
DUPLEX RECEPTACLE - NEMA 5-20R GFCI TYPE
FANNFANN FIRE ALARM REMOTE ANNUNCIATOR
TTB
PNL
D O T
S
RECPT
J-BOX
CKT-XX
#X
HARDWIRE CONNECTION
EMERGENCY SHUT OFF
OC
VFD CONTROLLER
QUAD RECEPTACLE IN FLOOR BOX
3D
BC BELOW COUNTER
DUAL PORT TELECOM OUTLET IN FLOOR BOX
CATV OUTLET
LEGEND
FIRE ALARM HORN/STROBE - CEILING MOUNTED H
UDUPLEX RECEPTACLE - WITH USB POWER
GROUNDING ELECTRODE
WIRELESS ACCESS POINT WAP
X
DCDOOR CONTACT
AFCI ARC FAULT CIRCUIT INTERRUPTER
FIRE ALARM DOOR HOLDER DH
X
E001 1" = 40'-0"
ELECTRICAL SITE PLAN
REMOVE EXISTING
POLE-MOUNTED PANEL
DEMOLISH POLE MOUNTED XFMR
DEMOLISH POLE MOUNTED XFMRS
MDP(ETR)
1101 E. WHITNEY
SERVICE METER
1115 E. WHITNEY ROAD
(DEMOLISHED)
1101 E. WHITNEY ROAD
1201 E. WHITNEY ROAD
ARRC SERVICE
DISCONNECT /
METER BASE
NEW PAD-MOUNTED
UTILITY XFMR.
150 KVA, 3-PH
480Y/277V
PANEL H
SHEET NOTES
RELOCATE EXISTING SERVICE DISCONNECT AND METER TO SOUTHEAST EXTERIOR OF BUILDING. CEA TO INSTALL CONDUCTORS AND CONDUITS FROM TRANSFORMER TO METER
AND DISCONNECT AT NEW LOCATION. COORDINATE WITH CEA.
PROVIDE NEW 200A SERVICE METER FOR NEW HEADBOLT HEATER OUTLETS AND EXISTING SCALE SHACK, FLOOD LIGHT, AND FUEL PANEL. MOUNT TO EAST WALL OF 1101 E.
WHITNEY RD.
PROVIDE 30 KVA TRANSFORMER TO STEP DOWN SERVICE VOLTAGE FROM 480Y/277V TO 208Y/120V. RELOCATE EXISTING FUEL PANEL TO RACK ADJACENT TO 1101 E. WHITNEY BUILDING EXTERIOR WALL. REFEED EXISTING FUEL PANEL, SCALE SHACK AND FLOOD LIGHT CIRCUITS FROM NEW PANEL L. PROVIDE IN GRADE JUNCTION BOX TO FEED EXISTING
SCALE SHACK AND FLOOD LIGHT CIRCUIT.
PROVIDE HEADBOLT HEATER OUTLETS AND FEED UNDERGROUND FROM PANEL L WITH 2-#10 AWG, #10 GND CONDUCTORS IN 3/4" RSC. MOUNT TO 4" X 4" PRESSURE TREATED, 8 FT WOOD POST BURIED TO A DEPTH OF 4 FT. SPACE POSTS 10 FT APART ON CENTER AND 10 FT FROM EAST WALL OF 1101. E WHITNEY RD. PROVIDE 6" BEDDING BELOW POST.
MOUNT METER BASE, ARRC SERVICE DISCONNECT, PANEL H, PANEL L AND 30 KVA TRANSFORMER TO SOUTHEAST EXTERIOR OF 1101 E. WHITNEY BUILDING.
PROVIDE 480 VAC, 4 POLE, 5 WIRE, TWIST LOCK RECEPTACLE, TOTAL OF 2. PROVIDE MATCHING PLUG TO ARRC. FEED UNDERGROUND FROM PANEL H. MOUNT TO 4" X 6" PRESSURE TREATED, 8 FT WOOD POST BURIED TO A DEPTH OF 4 FT. SPACE POSTS 15 FT APART ON CENTER AND 10 FT FROM EAST WALL OF 1101. E WHITNEY RD. SPACE 15 FT
APART ON CENTER FROM LAST HEADBOLT HEATER POST. PROVIDE 6" BEDDING BELOW POST.
PROVIDE TEMPORARY 30KVA 208Y/120V, THREE PHASE GENERATOR. SEE SHEET E100 FOR DETAILS.
DEMOLITION NOTES
1. COORDINATE ELECTRICAL UTILITY SERVICE DEMOLITION WORK WITH UTILITIES. SEE CEA REFERENCE DRAWINGS.
PROVIDE TEMPORARY 100KVA 480Y/277V, THREE PHASE GENERATOR. DISCONNECT SERVICE FEEDERS FROM MDP AND
CONNECT GENERATOR TO PROVIDE TEMPORARY POWER.
3. DEMOLISH OVERHEAD ELECTRICAL SERVICE LINES AND UTILITY POLES.
4. DEMOLISH POLE-MOUNTED TRANSFORMERS AND RETURN TO UTILITY.
REMOVE SERVICE DISCONNECT AND METER FOR RELOCATION AND REINSTALLATION IN NEW LOCATION. SEE SHEET
NOTE 1.
DEMOLISH SERVICE METER AND RETURN TO UTILITY. REMOVE FUEL PANEL FOR RELOCATION AND REINSTALLATION.
THIS IS A STANDARD LEGEND. ALL SYMBOLS SHOWN ON LEGEND ARE NOT
NECESSARILY ON THE DRAWING(S).
TRANSFORMER, POLE-MOUNTED T
GENERATOR G
UTILITY POLE
SERVICE DISCONNECT/
CT ENCLOSURE
SCALE SHACK3
FLOOD LIGHT (ETR) 3
REMOVE CT ENCLOSURE /
SERVICE DISCONNECT
AND METER BASE5
G
PROVIDE TEMPORARY
100KVA GENERATOR
T
DEMOLISH METER 6
DEMOLISH POLE-MOUNTED LIGHT
RELOCATED
FUEL PANEL3
DEMOLISH OVERHEAD LINES
,TYP4
REFEED EXISTING
PAD-MOUNTED XFMR
75KVA, 208Y/120V, 3-PH
30 KVA XFMR
PANEL L3 5
GENERAL SPECIFICATIONS
1. ALL WORK SHALL CONFORM TO THE MOST RECENTLY ADOPTED EDITION OF THE MUNICIPALITY OF
ANCHORAGE STANDARD SPECIFICATIONS (M.A.S.S.) TITLE 21, CHUGACH (CEA) ELECTRICAL
SERVICE REQUIREMENTS AND THE PROJECT MANAGEMENT AND ENGINEERING DEPARTMENT
DESIGN CRITERIA MANUAL (DCM) UNLESS OTHERWISE NOTED.
2. ALL RACEWAY SHALL BE GALVANIZED RIGID METAL CONDUIT (RSC) PER SECTION 80.07, UNLESS
OTHERWISE NOTED.
3. PROVIDE COPPER CONDUCTORS.
G
PROVIDE TEMPORARY
30KVA GENERATOR
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E001
AutoCAD SHX Text
LEGENDS, SCHEDULES
AutoCAD SHX Text
AND SITE PLAN
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
© 2024 MBA Consulting Engineers, Inc.
M B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
TO UTIILITY
UTILITY XFMR
150KVA, 3-PH
12,470Y/7,200V
TO 480Y/277V
SERVICE DISCONNECT
AND METER BASE
(NEW)
225/3 225/3
50/3 125/3
TO UTIILITY
UTILITY XFMR T-7090:
75KVA, 3-PH
12,470Y/7,200V
TO 208Y/120V (ETR)
TO 1201 E. WHITNEY
BLDG INTERIOR
SERVICE DISCONNECT
AND METER BASE
(ETR)
1101 E. WHITNEY ROAD
SERVICE METER
(RELOCATED)
1101 E. WHITNEY ROAD
SERVICE DISCONNECT/
CT CAN (RELOCATED)
UTILITY TO
REFEED XFMR
NEW 3-PHASE FEEDS
BY UTILITY
MDP 600A (ETR)
A (ETR) C (ETR) B-1 (ETR)
200/3 200/3
200/3
B-2 (ETR)
125/3
SPARE
B-3 (ETR) B-4 (ETR)
125/3 60/3
BOWL MIXER
DISHWASHER
150KVA, 3-PH (ETR)
480Δ : 208Y/120V
D (ETR)
125/3
600/3
L'AROMA CENTRAL BAKERYNEW SAGAYA WHOLESALE
4-#3/0, #6 GND, 2" C.
2 SETS: 4-#350KCMIL, #1 GND, 3" C.
E100 NTS
1101 E. WHITNEY ROAD - POWER ONE-LINE DIAGRAM
E100 NTS
1201 E. WHITNEY ROAD - POWER ONE-LINE DIAGRAM
30KVA, 3-PH (ETR)
480Δ : 208Y/120V
200/3
PROVIDE TEMPORARY
100 KVA 480V, 3-PHASE
GENERATOR FOR
TEMPORARY POWER
125/3
50/3 50/3 50/3
TWIST LOCK RECEPTACLE
TWIST LOCK RECEPTACLE
30KVA, 3-PH
480Δ : 208Y/120V
NEMA 3R ENCLOSURE
PANEL L
20/1 20/1
40/2
100/3
20/1
PANEL 2TOFC-FUEL
SCALE SHACK AND FLOOD LIGHT
3-#6, #10 GND, 1" C.
4-#2, #8 GND, 1-1/2" C.
PANEL H
600/3
SERVICE DISCONNECT
4-#3/0, #6 GND, 2" C.
VEHICLE HEADBOLT
HEATER OUTLETS
3-#1/0, #6 GND, 1-1/2" C.
2-#8, #10 GND, 3/4" C.
2-#10, #10 GND, 3/4" C.
2-#8, #10 GND, 3/4" C.
2 SETS: 4-#350KCMIL, #1 GND,
PROVIDE 3 @ 4" CONDUITS PER
CEA REQUIREMENTS
PROVIDE TEMPORARY
30 KVA 208V, 3-PHASE
GENERATOR FOR
TEMPORARY POWER
90/3
TOTAL OF 8 (SEE E101)
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E100
AutoCAD SHX Text
ONE-LINES
AND DETAILS
B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E101
AutoCAD SHX Text
SCHEDULES AND
LOAD CALCULATIONS
B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
REFERENCE
DRAWING
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E201
AutoCAD SHX Text
CEA REFERENCE
DRAWINGS
B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
REFERENCE
DRAWING
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E202
AutoCAD SHX Text
CEA REFERENCE
B
A Co ns ult ing E ng ine er s, In c.
(9
) 2
-2
F A
X (9
) 2
-0
N
EW
-P
H
AS
E
SE
R
VI
C E
LI
N
E
AL
AS
KA
R
AI
LR
O
AD
E . W
H
IT
N
EY
R O
AD
AN
C H
O R
AG
E, A K
C O
R
PO
R
AT
IO
N
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
EST. 1914
A L
A
SK
A R
A
I LROAD CORPO
RA
T
IO
N
R EG IS T ER ED P R O F E S S IO NA L ENGINEER
EDWARD W. CARLSON
EE-9354
08/28/2024
REFERENCE
DRAWING
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
MBA JOB NO.
AutoCAD SHX Text
SUB CON. JOB NO.
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
PHASE:
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
23030EWR
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text 8/28/2024
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text S
AutoCAD SHX Text
JAB/AHD
AutoCAD SHX Text
EWC
AutoCAD SHX Text E203
AutoCAD SHX Text
CEA REFERENCE
| Sheets and Views |
| 23030_E001-LEGENDS AND SITE PLAN-E001 |
| 23030_E100-SCHEDULES AND DETAILS-E100 |
| 23030_E101-SCHEDULES AND CALCS-E101 |
| 23030_E100-SCHEDULES AND DETAILS-E201 |
| 23030_E100-SCHEDULES AND DETAILS-E202 |
| 23030_E100-SCHEDULES AND DETAILS-E203 |
File details come from the government source that posted it. Updated .