This document is Addendum #1 for the Arnold and Moki Park Playground Replacement project issued by the City of Rifle, Colorado on March 22, 2024. The addendum provides clarifications and responses to bidder questions regarding the playground replacement request for proposal (RFP). Key project details include a total project budget of $350,000, excavation of playground pits to a 15-inch depth, and a planned completion date in the fall of 2024. The City will handle demolition and disposal of existing equipment and surfacing, and existing containment border timbers will be retained.
The addendum addresses multiple technical and procedural questions from potential bidders, including confirmation of pit sizes, surfacing materials (compacted aggregate subbase recommended), and site-specific conditions. No drainage issues are known at either park, and the sidewalk at Moki Park will remain unchanged. The City is seeking a proposed agreement that outlines the scope of work, contract terms, and duration. No union or labor requirements are specified, and the mobilization date is pending confirmation with the successful bidder. The procurement is structured as a best value solicitation, with emphasis on qualifications, experience, project performance, staff capabilities, and availability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Arnold - Existing Condtions.jpg | JPG image | |
| Moki - Existing Conditions.jpg | JPG image | |
| Arnold - Existing Condtions 2.jpg | JPG image | |
| RFP Arnold and Moki Playground Replacement.pdf | ||
| Moki - Existing Conditions 2.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Arnold and Moki Park Playground Replacement
March 22, 2024
The following Addenda items shall be applied to the Arnold and Moki Park Playground Replacement RFP.
Questions Received:
1. The City will demo/dispose of existing equipment and surfacing. Please confirm the depth at which the pits will be excavated.
• Pits will be excavated 15”.
2. Does demo/dispose include existing containment border timbers?
• Existing containment border will be kept.
a. If so, please confirm what type of containment you would like
i. Concrete
ii. Rotomolded plastic containment border timbers
3. Can you please confirm the project budget, either in total or by park.
• Total Project Budget is $350,000
4. Does the pit size/shape change at either park?
• No, the pit size/shape will remain the same.
5. Should we choose Poured in Place surfacing, please confirm the desired subbase material.
a. Concrete
b. Compacted aggregate
• Compacted aggregate
6. At Moki Park, does the sidewalk remain as-is?
• Yes, the sidewalk will remain as is.
7. Are there known drainage issues at either site?
• There are no know drainage issues.
8. Does the above project have an estimated value, mobilization date, and completion date? Also does there happen to be any union or labor requirements?
• Current estimated value
• $350,000
• Mobilization Date
• Pending confirmed schedule with successful bidder.
• Completion Date
• Fall of 2024
• No there are not union or labor requirements.
9. Can you expand on point #7. A proposed agreement is required as an attachment. Specifically, what are you looking for as a proposed agreement?
• We are looking for an agreement that outlines the scope of work, contract terms, and contract duration.
10. Do you have any type of existing layout or boundary plans for Moki or Arnold
Parks?
• No, we do not have any type of existing layout or boundary plans for Moki or Arnold Park.