ARFQ DEP26-45-OSR Powdermill Processing - Reclamation Plans_Powdermill_S-5027-08_U-5017-08_Pages 7-14 (1).pdf
PDF 16 MB Posted
- Solicitation number
- ARFQ-0313-DEP2600000045-3
- Issued by
- Upshur County, West Virginia
About this file
This is a Reclamation Plan document prepared by the West Virginia Department of Environmental Protection (DEP), Office of Special Reclamation, for the Powdermill Processing operation located in Wayne County, West Virginia. The plan details comprehensive site reclamation and land restoration activities associated with mining Permit S-5027-08 and Permit U-5017-08. The project encompasses multiple areas (A through E) and involves construction of access roads, ditches, sediment control measures, and highwall backfilling operations. Key elements include the creation of Ditch 5 (material from which will be used to backfill highwalls in Areas B and E), installation of dual 48-inch HDPE pipes for stormwater management, limestone lining of existing sumps, road maintenance and cleaning operations, and regrading of designated areas. The plan was dated September 2025 and prepared by WGS (drawn and designed) with CBF as the DEP requisitioner. The project involves detailed cross-sections and contour maps showing existing and proposed ground conditions at various stations, with slope ratios specified for ditch construction (ranging from 1.7:1 to 2.7:1).
The document consists of 22 sheets of technical drawings and specifications for the reclamation work, with detailed plan sheets for Areas B through E showing project boundaries, property lines, stream locations, and contour intervals at both 2-foot and 10-foot increments. Ditch details are referenced on a separate Detail Sheet 1 (page 19), and additional specifications appear on Detail Sheet 2 for drive-through elements. Material excavated from the valley fill is designated for highwall backfilling in Areas E and F, indicating an integrated approach to site restoration using on-site materials. The plan identifies several sediment ditches to be removed and establishes a coordinated drainage system designed to manage stormwater flow across the reclaimed site. Contact information for the Office of Special Reclamation is provided as 1-304-926-0499 (office) and 1-304-926-0458 (fax), with the office located at 601 57th Street SE, Charleston, West Virginia 25304.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0+00 0+50
1+00 1+502+002+50
3+00 3+50
4+00 4+50
5+00
15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 22+80
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 50" DATE: SEPTEMBER 2025
PLAN SHEET AREA B
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
LOUISA QUADRANGLES
0 50 100
POND 2
POND 2a
DITCH 5
SEDIMENT DITCH 8
TO BE REMOVED
BEGIN ACCESS ROAD 1
STATION 0+00
BEGIN ROADSIDE
DITCH 1
EXISTING SUMP
AND CULVERT
TO REMAIN
POND 2a
OUTLET
POND 2
OUTLET
ROCK UNDER DRAIN
ROCK UNDER DRAIN
OUTLET DRAIN TO FLOW
INTO ROAD SIDE DITCH
ROCK UNDER DRAIN
DITCH 4
DITCH 3
DITCH 2
EXISTING SUMP
AND CULVERT
TO REMAIN
EXISTING SUMP
AND CULVERT
TO REMAIN
EXISTING SUMP AND CULVERT
TO REMAIN IN PLACE THE SUMP
WILL BE LINED WITH LIMESTONE
THIS WILL BE PAID FOR UNDER
DITCH 3 QUANTITY.
EXISTING ROADSIDE DITCH & SUMPS TO BE
CLEANED THIS WORK WILL BE PAID FOR
UNDER ROAD MAINTENANCE
LEGEND
PROJECT BOUNDARY
PROPERTY LINE
STREAM
EXISTING 2 FT CONTOUR
EXISTING 10 FT CONTOUR
EXISTING ROAD
PROPOSED ROAD
PROPOSED 2 FT CONTOUR
PROPOSED 10 FT CONTOUR
PROPOSED DITCH
SEDIMENT DITCH TO
BE REMOVED
AREA TO BE
REGRADED
NOTE: DITCH DETAILS CAN BE
FOUND ON DETAIL SHEET 1 PAGE 19
TOP SURFACE
BACKFILL HIGHWALL USING
MATERIAL EXCAVATED TO
CONSTRUCT DITCH 5
NOTE: MATERIAL EXCAVATED TO CREATE DITCH 5
WILL BE USED TO BACKFILL HIGHWALL IN AREA B
3 3 4 4 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70
ROCK UNDER DRAIN
PROPSED
GROUND
1.8:1
DITCH 2
EXISTING
GROUND
PROPSED
GROUND
EXISTING
GROUND
EXISTING
ACCESS
ROAD
ROCK UNDER DRAIN
1.8:1
DITCH 4
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 20" DATE: SEPTEMBER 2025
CROSS SECTIONS 3 & 4
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
LOUISA QUADRANGLES
0 20 40
850850
810810810
770770
890930
0+00 0+50
1+00 1+502+002+50
3+00 3+50
4+00 4+50
5+00 5+50
6+00 6+50
7+00 7+50
8+
8+50 9+00 9+50 10+00 10+50 11+00
11+50
0+
0+
1+
7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 22+80
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1" = 50' DATE: SEPTEMBER 2025
PLAN SHEET AREA C
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
LOUISA QUADRANGLES
0 50 100
BEGIN ACCESS ROAD 1
STATION 0+00
BEGIN ROADSIDE
DITCH 1
ROCK UNDER DRAIN
DITCH 4
DITCH 5
EXISTING CULVERT
TO REMAIN IN PLACE
SEDIMENT DITCH 9
TO BE REMOVED
END ACCESS ROAD 1
STATION 11+54END ROADSIDE
DITCH 2
END ROADSIDE
DITCH 1
BEGIN ROADSIDE
DITCH 2
TWO 48" HDPE DUAL WALL PIPES
EXISTING SUMP AND
CULVERT TO REMAIN
POND 2A
EXISTING ROADSIDE DITCH & SUMP TO BE
CLEANED THIS WORK WILL BE PAID FOR
UNDER ROAD MAINTENANCE
LEGEND
PROJECT BOUNDARY
PROPERTY LINE
STREAM
EXISTING 2 FT CONTOUR
EXISTING 10 FT CONTOUR
PROPOSED 2 FT CONTOUR
PROPOSED 10 FT CONTOUR
EXISTING ROAD
PROPOSED ROAD
PROPOSED DITCH
SEDIMENT DITCH TO
BE REMOVED
AREA TO BE
REGRADED
EACH PIPE LENGTH 60 FT
NOTE: DITCH DETAILS CAN BE
FOUND ON DETAIL SHEET 1 PAGE 19
TOP SURFACE
NOTE: MATERIAL EXCAVATED TO CREATE DITCH 5
BACKFILL HIGHWALL USING MATERIAL EXCAVATED TO CREATE DITCH 5
5 5 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00
2:1 2:1
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00
2:1 2:1
6 6
EXISTING
GROUND
PROPOSED
ACCESS ROAD 1
BERM
ROADSIDE DITCH #1
PROPOSED
GROUND ROADSIDE DITCH #2
PROPOSED
ACCESS ROAD 1
BERM
2:1 2:1
1.7:1 1.7:1
PROPOSED DITCH 5
2:1 2:1
1.7:1 EXISTING GROUND
ROADSIDE DITCH #1
PROPOSED
GROUND
PROPOSED
ACCESS ROAD 1
BERM
PROPOSED DITCH 5
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 20" DATE: SEPTEMBER 2025
CROSS SECTIONS 5 & 6
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
81081
810 810
770 770
0 910
0+00 0+50
1+00 1+50
2+00 2+50
3+00 3+50
4+00 4+50
5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 50" DATE: SEPTEMBER 2025
PLAN SHEET AREA D
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
LOUISA QUADRANGLES
0 50 100
DITCH 5
DITCH 6
DITCH 7
LEGEND
PROJECT BOUNDARY
PROPERTY LINE
STREAM
EXISTING 2 FT CONTOUR
EXISTING 10 FT CONTOUR
PROPOSED 2 FT CONTOUR
PROPOSED 10 FT CONTOUR
EXISTING ROAD
PROPOSED ROAD
PROPOSED DITCH
SEDIMENT DITCH TO
BE REMOVED
AREA TO BE
REGRADED
NOTE: DITCH DETAILS CAN BE
FOUND ON DETAIL SHEET 1 PAGE 19
TOP SURFACE
NOTE: MATERIAL EXCAVATED TO CREATE DITCH 5
7 7
8 8
2:1 2:1
2:1 2:1
EXISTING
GROUND
PROPOSED GROUND
PROPOSED DITCH 5
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00
2:1 2:1
2:1 2:1
EXISTING
GROUND
PROPOSED GROUND
PROPOSED DITCH 5
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 20" DATE: SEPTEMBER 2025
CROSS SECTIONS 7 & 8
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
810810
0+
0+
1+
1+
2+
2+
3+
3+50
4+00
4+50
5+00
5+50
6+00 6+50
7+00
7+50
8+00 8+50
9+00 9+50
10+00
16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1" = 50' DATE: SEPTEMBER 2025
PLAN SHEET AREA E
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
LOUISA QUADRANGLES
DITCH 5
EXISTING CULVERT
TO REMAIN IN PLACE
EXISTING ROAD SIDE DITCH
TO REMAIN IN PLACE
SEDIMENT DITCH 9
TO BE REMOVED
SEDIMENT DITCH 8
TO BE REMOVED
DITCH 11
DITCH 8
DITCH 9
DITCH 10
DRIVE-THROUGH
SEE DETAIL SHEET 2
BEGIN ACCESS ROAD 2
REALIGNMENT STATION 0+00
END ACCESS ROAD 2
REALIGNMENT STATION 10+00
POND 2A
0 50 100
LEGEND
PROJECT BOUNDARY
PROPERTY LINE
STREAM
EXISTING 2 FT CONTOUR
EXISTING 10 FT CONTOUR
PROPOSED 2 FT CONTOUR
PROPOSED 10 FT CONTOUR
EXISTING ROAD
PROPOSED ROAD
PROPOSED DITCH
SEDIMENT DITCH TO
BE REMOVED
AREA TO BE
REGRADED
GROUTED RIP-RAP
DRIVE-THROUGH
SEE DETAIL SHEET 2
GROUTED RIP-RAP
NOTE: DITCH DETAILS CAN BE
FOUND ON DETAIL SHEET 1 PAGE 19
TOP SURFACE
NOTE :MATERIAL EXCAVATED IN VALLEY FILL
WILL BE USED TO BACKFILL HIGHWALLS AREAS E & F
BACK FILL HIGHWALL USE
MATERIAL FROM VALLEY FILL
BACK FILL HIGHWALL USE
MATERIAL FROM VALLEY FILL
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00 4+10
9 9
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80
10 10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80
11 11
EXISTING
GROUND
PROPOSED GROUND 2:1
2:1
2.7:1
EXISTING GROUND
PROPOSED GROUND
EXISTING
GROUND
PROPOSED GROUND
PROPOSED DITCH 11
2:1 2:1
REVISIONS
DATE: ( ):BY:
TOTAL
SHT. NO.
..\..\..\..\DEP_36x24_template\DEP_36x24_TitleSheet - Standard\Dsize-TitleBlockProject\depep1.jpg
BUYER:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DEP REQ.:
WGS
WGS
CBF
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
SCALE: 1' = 20" DATE: SEPTEMBER 2025
CROSS SECTIONS 9, 10, & 11
WAYNE COUNTY, WEST VIRGINIA
POWDERMILL PROCESSING
PERMIT S-5027-08/U-5017-08
File details come from the government source that posted it. Updated .