ARFQ DEP25-043-AML - Weston (Curtis) Landslide-GWPP.pdf
PDF 3 MB Posted
- Attached to
- AML - Weston (Curtis) Landslide
- Solicitation number
- ARFQ 0313 DEP2500000043 4
- Issued by
- Lewis County, West Virginia
About this file
This is a Groundwater Protection Plan (GPP) prepared for the West Virginia Department of Environmental Protection (WVDEP), Office of Abandoned Mine Lands & Reclamation, for the Weston (Curtis) Landslide Project located in Lewis County, West Virginia. The plan was prepared by Dieffenbauch & Hritz, LLC in September 2024 and outlines comprehensive environmental protections and best management practices (BMPs) for the construction and reclamation activities at the site. The document inventories potential contaminants to be stored onsite, including fertilizers (including ammonium nitrate), fuels (1,000 gallons), and lubricants/oils (75 gallons total), and details specific procedures to prevent groundwater contamination, such as storing fuels in double-walled containers and maintaining materials according to WVDEP direction. The site is located adjacent to an unnamed tributary to Little Skin Creek with assumed shallow groundwater at the stream level, and is within the Weston Source Water Protection Area and near the Broken Wheel Campground Wellhead Protection Area.
The GPP requires quarterly inspections during the life of the construction activity to ensure all groundwater protection measures are functioning properly, with BMP inspections occurring at minimum every four calendar days and within 24 hours of any precipitation event exceeding 0.25 inches in a 24-hour period. All employees must receive training on their responsibility to ensure groundwater protection, and any repairs or maintenance to BMPs must be performed immediately following qualifying rain events. The plan incorporates compliance with West Virginia's Construction Stormwater General Permit and references the state's BMP manual for design criteria and detailed maintenance guidance. The site includes staging areas, temporary stockpiles, improved gravel access, delineated wetlands, woven belted silt fence, and rock check dams as erosion and sediment control measures.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUNDWATER PROTECTION PLAN
for the
WESTON (CURTIS) LANDSLIDE PROJECT
Lewis County, West Virginia
Prepared for:
West Virginia Dept. of Environmental Protection Office of Abandoned Mine Lands & Reclamation
1000 Technology Drive, Suite 3220 Fairmont, WV 26554
Prepared by:
1095 Chaplin Road, Suite 200 Morgantown, WV 26501
September 2024
WESTON (CURTIS) LANDSLIDE GPP Page 3
INVENTORY WORK SHEET FOR POTENTIAL CONTAMINANTS
(47 CSR 58.4.11.1)
Complete the following table providing the storage location, quantity and potential to contaminate soil or ground water. If the potential contaminate listed is not kept on site, then enter "NA" in all three columns. If this site maintains additional items with the potential to contaminate ground water. List the additional items in the spaces provided at the end of this list. The storage location should be indicated on a site map.
Potential Contaminant Storage Locations
Quantity in Gallons
Potential to Contaminate Soil or Ground Water
Fertilizers/ Including Ammonium Nitrate Onsite TBD Yes
Batteries/ Battery Acid N/A N/A N/A Fuels (tanks) Onsite 1000 GAL Yes
Lubricants (Oil/Grease) (tanks and drums) Onsite 20 Grease
55 H-Oil Yes
Parts Cleaners N/A N/A N/A
PROCEDURES DESIGNED TO PROTECT GROUND WATER AT
CONSTRUCTION SITES (47 CSR 58.4.11.2)
Complete the following table providing the practices and procedures which will be in place at the construction site to prevent contamination of ground water by the potential contaminates. Equipment cleaning, maintenance activities, pipelines, and sumps and tanks which contain potential contaminants must be addressed. Examples of Groundwater Protection Practices can be found in 47 CSR 58.4. et seq.
Potential Contaminant Procedures to Prevent Contamination of Ground Water
Fertilizers/ Including Ammonium Nitrate
Materials to be stored as directed by WVDEP-DLR-AML’s Environmental Health and Safety Specialist.
Batteries/ Battery Acid N/A
Fuels (tanks) Machinary and bulk storage onsite.
Material to be stored in double walled container.
Lubricants (Oil/Grease) (tanks and drums)
Machinery and bulk storage onsite. Material to be stored in approporiate containers and stores as directed by WVDEP-DLR-AML’s Environmental Health and Safety Specialist.
Parts Cleaners N/A Storage area for raw materials, product, or wastes Raw materials and product shall be restored and placed according to the direction provided by WVDEP-DLR-AML’s Environmental Health and Safety Specialist. Wastes shall be disposed of in accordance with the WVDEP regulations
WESTON (CURTIS) LANDSLIDE GPP Page 4
47 CSR 58.4.11.4.
A summary of all activities carried out under other regulatory programs that have relevance to ground water protection. Indicate below all permits, required plans and regulatory agencies who have any control over the facility and how the facility could impact ground water. Examples WV/National Pollutant Discharge Elimination System, WV/DEP/OWM Solid Waste Facility Permit, WV/DEP/OWM Hazardous Waste Facility Permit, WV/DEP/OWM Underground Storage Tank Program, Resource Conservation Recovery Act (RCRA), Comprehensive Environmental Response, Compensation & Liability Act (CERCLA), Toxic Substances Control Act, Underground Injection Control Permit, and WV Department of Health (septic tanks and sewage systems)
Permit Number
Permit
TBD
West Virginia General Water Pollution Control Permit for Stormwater Associated with Abandoned Mine Lands and Reclamations.
TBD NWP-Nationwide Permit N/A WVDNR OLS Permit N/A WV/NPDES Hydrostatic Test Water (New Pipeline) General
Permit
47 CSR 58.4.11.5.
A discussion of all available information reasonably available to the facility/activity regarding existing ground water quality at, or which may be affected by the site.
Complete the following table as much as possible and attach a brief description of readily available information such as soil type, type of underlying geologic formations, the results of any percolation tests conducted by the county health department for septic tanks, and the results of any sampling activity at the facility from drinking water wells, springs, or seeps. The location of the sampling points should be identified on the site sketch. Sampling is not a requirement of a GPP.
However, if the information is available, it should be included. Prior spills, remediation efforts, and known contamination, both on site and at adjacent or nearby sites, should be included.
WESTON (CURTIS) LANDSLIDE GPP Page 5
Closest surface water body: Unt to Little Skin Creek Distance to closest surface water body: 0 FT Depth to ground water (if known) Assumed Shallow at Stream Know ground water monitoring wells within 2000 feet:
None Known
Known public or private drinking water wells within 2000 feet:
None Known
Closest Well Head Protection Area: Broken Wheel Campground (WHPA) Closest Source Water Protection Area: WVAW-Weston (Within ZCC)
47 CSR 58.4.11.6.
No wastes will be used for deicing, ice control, structural fills, road base or other uses unless provided for in existing regulations.
47 CSR 58.4.11.7.
All employees will be trained on their responsibility to ensure groundwater protection. Current job procedures provide direction on how to prevent ground water contamination through proper work practices.
47 CSR 58.4.11.8.
Every three months during the life of the construction activity the site will be inspected to ensure that all elements and equipment of the sites ground water protection program are in place, properly functioning, and appropriately managed.
West Virginia Department of Environmental Protection
BMP Inspection & Maintenance Guidance
West Virginia’s Construction Storm water General Permit requires that all erosion and sediment control Best Management Practice’s [BMP’s] be inspected on a routine basis. These inspections must be maintained on the construction site at all times.
WV DEP has developed this document to provide guidance on conducting and documenting BMP inspections at your construction site.
The West Virginia Construction Storm Water General Permit sets forth General Management Controls that the SWPPP must contain.
Additional requirements for Construction Activities in the SWPPP.
The following are guidelines to assist you in inspection protocol for your BMP’s.
1. Describe the specific BMP you are inspecting. (You are required to inspect all erosion and sediment control structures as well as storm water management structures).
2. Record the date, time and weather conditions on your inspection report.
3. Make sure the inspector’s name is on the report; they should also sign the inspection report.
4. Describe actions that are taken to resolve/repair problems with the BMP’s
The next page is a sample inspection report. You may use this report or develop your own, however the inspection report should contain all the information that is outlined on the next page. These reports must be maintained on the construction site for the duration of the project.
G.4.e.2.(E) Inspection of all erosion and sediment controls will occur at least once every 4 calendar days and within 24 hours after any precipitation event greater that 0.25 inches per 24 hour period, unless such inspections are not practicable within 24 hours, in which case that fact shall be noted in the inspection report:
Repairs or maintenance to BMPs shall be performed immediately following the .25-inch rain event in a 24-hour period, and repairs shall be re-inspected no later than the next inspection date. If repairs cannot be completed within that 4-day period, that fact shall be explained on the inspection report and such explanation shall include an anticipated completion date.
G.4.d.1.A Preventative Maintenance – A preventative maintenance program shall involve inspection and maintenance of sediment and erosion control devices and storm water management structures to uncover conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters.
BMP Inspection Report
Date: Time:
Weather conditions during inspection:
Name of project:
Name of person conducting inspection:
Signature:
FOR EACH BMP – FILL OUT THE FOLLOWING
For more information on specific construction site Best Management Practices (BMP’s) please consult West Virginia’s BMP manual. The BMP manual will provide design criteria and detailed information about maintenance of BMP’s. Available Fall 2006.
For more information about West Virginia’s BMP manual please visit our website:
http://www.wvdep.org/dwwm/stormwater/index.htm
BMP you are inspecting:
Condition of the BMP:
Does this BMP need to be repaired or have other maintenance performed?
What maintenance or repairs are being performed?
When will repair or maintenance of this BMP be complete?
Other Comments:
http://www.wvdep.org/dwwm/stormwater/index.htm
Addendum to BMP Inspection Report, Use as many of these BMP inspection boxes as necessary.
DATE:
Please print legible – Yellow Fields Required Page of
Column Number
(from chart)
Time per Instructor (hrs:min)
Date
Daily Start Time
Daily Finish Time
Daily Total Hours
Total hours for multi-day classes
Column Number Date Submitted
Instr. A (from below)
Instr. B (from below)
Instr. C (from below)
Instr D (from below)
1 2 3 4 5 6 7
C o u rs e
N am e u rs e
N u rs e
N u rs e
N u rs e
N u rs e
N u rs e
N
Send e-mail confirmation receipt to: Training Location/ Room
Instr Instructor ID # Instructor Last Name Instructor First Name Instructor Phone #
A Days Learner Attended
Class (optional)
B
C
D
Learner ID # Learner Last Name Learner First Name M.I. Initials S, U, I, T S, U, I, T S, U, I, T S, U, I, T S, U, I, T S, U, I, T S, U, I, T
1 M T W T F
2 M T W T F
3 M T W T F
4 M T W T F
5 M T W T F
6 M T W T F
7 M T W T F
8 M T W T F
9 M T W T F
10 M T W T F
11 M T W T F
12 M T W T F
Comments:
X
X
X
FH
GLM
G
G
G
W
W
W
WV
WV
GAS
GAS
GAS
GAS
GAS
PP
PP
PP
PP
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
PP
PP
PP
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
G GGG
W
SA
N
SA
N
SAN
SAN
PHILIP J BARTLING &
CLARA MARIE SPATAFORE
TM 8J PCL. 46
DB 572 PG. 525
3.26 AC
MATTHEW R AMANDA L BENNETT
TM 8K PLC 32.4
DB 662 PG. 634
2 AC
SCOTT A & CYNTHIA A GODWIN
TM 8J PCL. 44
DB 666 PG. 88
1.04 AC
SCOTT A & CYNTHIA A GODWIN
TM 8J PCL. 45
DB 666 PG. 88
1.21 AC
RICKY LEE & JOYCE LEE STOUT
TM 8J PCL.42
DB 484 PG. 270
1.09 AC
MICHAEL J & MARY C GASPER
TM 8K PCL. 32.2
DB 603 PG. 771
2.65 AC
KATELYN & LOGAN THOMAS
TM 8K PCL. 32.5
DB 761 PG. 808
1 AC
KELLY J BARBINA
TM 8J PCL. 52
DB 723 PG. 494
1.3 AC
MARK L MELCHER SR
TM 8K PCL. 32.3
DB 767 PG. 215
2.35 AC
AMELIE MARIE GISELE CORMIER
TM 8J PCL. 41
DB 805 PG. 50
3.39 AC
ROGER L & ETHEL M CURTIS
TM 8K PCL. 32
DB 458 PG. 583
69.88 AC
UNITED STATES OF AMERICA
TM 8K PCL. 29
DB 348 PG. 532
32 AC
JANE BRADY
TM 8J PCL. 43
DB 530 PG. 750
2 AC
SCOTT A & CYNTHIA A
GODWIN
TM 8J PCL. 45
DB 666 PG. 88
1.21 AC
PROJECT SIGN
WITH RAIN GAUGE
CC
C
C
C
C
CCC
C
C C
C
C
C
C C C
C
C C
C C
C
C C
F F F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C
C
C
C
C
C
CF F
F
(GRAVEL)
RESIDENTIALSTRUCTURE
RE
SI
DE
NT
IA
L
ST
RU
CT
UR
E
RESIDENTIAL
STRUCTURE
RESIDENTIAL
STRUCTURE
BLDG.
STRUCT.
RESIDENTIAL
STRUCTURE
LITTLE SKIN CREEK RD. COUNTY ROUTE 36 VARYING RIGHT-OF-WAY (ASPHALT)
CURTIS LANE
(GRAVEL)
RESIDENTIAL
STRUCTURE
CU
RT
IS
LA
NE
(AS
PH
AL
T)
RESIDENTIAL
STRUCTURE
RESIDENTIAL
STRUCT.
BLDG.
STRUCT.
(GRAVEL DRIVEWAY)
BLDG.
STRUCT.
NOTES:
1. SEE SHEET 2 FOR LEGEND AND GENERAL NOTES.
2. TOPOGRAPHIC INFORMATION PROVIDED BY MEAD & HUNT AND
DRAWN BY:
APPROVED BY:
DESIGNED BY:
CHECKED BY:
PWH
D&H
HLP
JHL
REVISIONS
DATE: ( ):BY:
DATE: SEPTEMBER, 2024
SHT. NO.
REV.
OF 1
Division of Land Restoration
Office of Abandoned Mine Lands and Reclamation
West Virginia Department of Environmental Protection
SURVEY CONTROL
No. Northing Easting Elev. Description
10 717823.36 2137601.38 1099.91 CAPPED REBAR SET
116 718460.21 2136719.30 1273.78 CAPPED REBAR SET
120 718145.87 2136317.46 1193.57 CAPPED REBAR SET
600 718424.36 2136691.13 1267.96 IRON PIN AND CAP
WESTON (CURTIS) LANDSLIDE
LEWIS COUNTY, WEST VIRGINIA
DIEFFENBAUCH & HRITZ, LLC
1095 Chaplin Road, Suite 200
Morgantown, WV 26501 www.dandhengineers.com
P: 304.985.5555 F:304.985.5557
E R O S I O N S E D I M E N T
PL
O
TT
ED
: 1 0/
/2
:2
AM
FI
LE
: M
:\C
LI
EN
T\
W
VD
EP
A
M L\
\2
-0
W
ES
TO
N
(C U
R
TI
S) L
AN
D
SL
ID
E W
V-
\S
U R
VE
Y\
D R
AW
IN
G \W
ES
TO
N C
U R
TI
S
PL
AN
S
ET
\W
ES
TO
N
C U
R
TI
S
FA
C
IL
IT
Y
M
AP
.D W
G
10/2024 RME ENS
1GPP OVERALL EROSION AND SEDIMENT
CONTROL PLAN PHASE II
0 50' 100'
STAGING AREA /
TEMPORARY STOCKPILE
IMPROVED GRAVEL ACCESS
AND LAYDOWN AREA
DELINEATED
WETLAND
UNT TO LITTLE SKIN CREEK
(INTERMITTENT STREAM)
DELINEATED
WETLAND
W
V DOH VARIABLE RIGHT-OF-W
AY
UNT TO LITTLE SKIN CREEK
(EPHEMERAL STREAM)
UNT TO LITTLE SKIN CREEK
(EPHEMERAL STREAM)
STAGING AREA AND
FUEL STORAGE
CONCRETE
WASHOUT AREA
WOVEN BELTED SILT FENCE
(TYP.)
ROCK CHECK DAM
(TYP.)
| BMP Inspection Report.pdf |
| West Virginia’s Construction Storm water General Permit requires that all erosion and sediment control Best Management Practice’s [BMP’s] be inspected on a routine basis. These inspections must be maintained on the construction site at all times. |
| FOR EACH BMP – FILL OUT THE FOLLOWING |
| DATE: |
File details come from the government source that posted it. Updated .