This is Addendum No. 1 to a Request for Quotation (RFQ) issued by West Virginia for prefabricated metal buildings at Stevens Correctional Center and Jail. The addendum addresses ten questions and three clarifications regarding the project specifications and logistics. Key specifications confirmed include acceptance of 35 PSF loading (standard versus the specified 40 PSF), horizontal siding, vertical roof sheets, and R17 insulation for carport-style buildings. The project allows for man doors positioned five feet from the building end and permits use of the area behind the old building for material laydown. The bid submission deadline has been moved to December 18, 2025, at 10:30 AM E.S.T.

The addendum provides essential project logistics and site information. No electrical outlets are available at the facility, requiring contractors to provide a portable generator for tools and equipment. Contractors cannot use an existing storage container on the concrete pad of building number one but may access facility restrooms located in the lobby. The new concrete pad for building number one measures fifty feet long by twenty feet wide, with four feet of the prefabricated metal storage building to be located on the existing eight-foot-wide sidewalk. A pre-bid sign-in sheet was attached to the addendum, indicating that a bidders conference was held prior to the issuance of this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARFQ 0608 DCR2600000045

REQUEST FOR QUOTATION

PREFABRICATED METAL BUILDINGS PROJECT

STEVENS CORRECTIONAL CENTER AND JAIL

PREFABRICATED 1 ADDENDUMS

METAL BUILDINGS

ADDENDUM NO. 1

Questions:

Q1: The standard loading on this type of building is 150 MPH and 35 PSF. The specs call for

40 PSF. Is 35 acceptable?

A1: Yes

Q2: Can man doors be 5’ from end of building to miss framing?

A2: Yes

Q3: Is siding to be horizontal or vertical?

A3: Horizontal

Q4: If we go with a boxed eave the roof sheets run length ways and they will be a two piece roof sheet. If we go with vertical roof sheets which is how most buildings are, you wouldn’t have the boxed eave. I would recommend doing the vertical sheets.

A4: Vertical sheets are acceptable.

Q5: These carport style buildings can only install R17 insulation. Is this acceptable?

A5: Yes

Q6: Are there electric at both locations that the contractor can use for tools? If so, what electric is available. If not, the contractor must use a portable generator.

A6: Electrical outlets are not available. The contractor must provide a portable generator for electric for the project.

Q7: Can the contractor use the existing storage container?

A7: The contractor cannot use the existing storage container that will be on the concrete pad of building no. 1.

Q8: Will the contractor have to provide port-a-john?

A8: No, the contractor can use the restroom that is located in the lobby at the facility.

Q9: Material laydown area? Could they use the area back in the area where the old building

ARFQ 0608 DCR2600000045

REQUEST FOR QUOTATION

PREFABRICATED METAL BUILDINGS PROJECT

STEVENS CORRECTIONAL CENTER AND JAIL

PREFABRICATED 2 ADDENDUMS

METAL BUILDINGS

is located?

A9: Yes, the contract can use the area behind the old building.

Q10: We would like to have the bid date moved to December 18, 2025.

A10: Yes, the bid date will be changed.

Clarifications:

C1: Please see the attached pre-bid sign-in sheet.

C2: The new concrete pad for building no. 1 will be located is fifty (50’) feet long by twenty

(20’) feet wide. The existing sidewalk is eight (8’) feet wide. Four (4’) feet of the back of the new pre-fabricated metal storage building will be located on the existing sidewalk.

C3: The date and time the bids must be submitted by has changed: 10:30 AM E.S.T on

December 18, 2025.