Area_I_04_11_24.pdf
PDF 6 MB Posted
- Attached to
- Tetlin NWR Interpretive Exhibit Fab and Install Federal contract opportunity
- Solicitation number
- 140FS126Q0186
About this file
This document is a design pre-production specification for interpretive signage and graphics for the Tok, Alaska visitor center and interpretive display area.
The project comprises five main graphic components created by graphic designer Nan Hildebrandt for Split Rock Studios, vendor 3087 TOK APLIC. Component I.1 is a Tetlin Passage Reading Rail panel measuring 40"w x 50"h, depicting the valley's role as a migration corridor and archaeological significance from 14,000 years ago. Component I.2 is an Alaska Highway Panel measuring 73"w x 46"h that documents the 1942 construction of the Alaska Highway by 11,000 soldiers across 1,700 miles of Canadian and Alaskan wilderness in eight months, including the contributions of segregated Black Army regiments. Component I.3 consists of Migration Graphics including a primary mural panel (I.3.a) measuring 128.5"w x 46"h titled "Who's Passing Through?" with eight flip door elements (I.3.b-i), each 10"w x 10"h, providing information on caribou, invasive species, warblers, humpback fish, and migration routes. Components I.4.a through I.4.c are large-format wildlife cut-out displays featuring swans (60"w x 34"h), pintails (25"w x 19.5"h), and mallards (23"w x 22"h). All designs are drawn to 100% scale at 12"=12" and dated April 11, 2024, in design pre-production phase with no specific output or mounting specifications listed in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Area_F_04_11_24.pdf | ||
| Area_G_04_11_24_1.pdf | ||
| Tok_Area_F_240126.pdf | ||
| Tok_DDII_Design_Book_1.pdf | ||
| Tok_100__Design_Content_Manual_5_2_2024.pdf | ||
| Area_A_04_11_24.pdf | ||
| Sol_140FS126Q0186.pdf | ||
| Area_H_04_11_24.pdf | ||
| Tok_Area_A_240126.pdf | ||
| Tok_Area_I_240126.pdf | ||
| Tok_Area_K_240126.pdf | ||
| Tok_DDII_Design_Book_Part_2.pdf | ||
| Area_K_04_11_24.pdf | ||
| Tok_Area_H_240126.pdf | ||
| Tok_Area_G_240126.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I.1Size: 40”w x 50”h Output:
Mounting:
Scale Drawn: 100% @ 12” = 12” Vendor:
3087 TOK APLIC
03.04.24
I.1 Tetlin Passage Reading Rail
Design Pre-Production Graphic Designer: Nan Hildebrandt
Alaska
Siberia
Canada
Be ri ng L an d
Br id ge
TETL IN PASSAGE
Steve Hilebrand/USFWS
The Tetlin Passage at the end of the last Ice Age.
Archaeologists excavate a site to learn about the people who lived here 14,000 years ago.
Why did they come here? What did they hunt?
How did the climate affect their movement?
Every year, millions of birds, fish, and mammals migrate through this valley. Some have come just a few hundred miles, while others have traveled several thousand. Whoever they are and wherever they’re from, they’re all drawn here for the same reasons.
Tucked between rugged terrain on both sides, the “Tetlin Passage” is the easiest route through a vast landscape. Its lakes, forests, and wetlands offer food and habitat where migrating animals can rest up for the next stage of their journey.
The Valley of Great Migrations
Sam Coffman
G l a c i e r
G l a c i e r
G l a c i e r
04.11.24
I.2Size: 73”w x 46”h
3087 TOK APLIC
03.04.24
I.2 Alaska Highway Panel
Design Pre-Production Graphic Designer: Nan Hildebrandt
Building the Alaska Highway If you’re like most visitors to Tok, you probably came here through the Tetlin Passage by driving on the Alaska Highway.
But the journey wasn't always this easy—and this is more than just a road.
The Alaska Highway is a testament to courage, ingenuity, and perseverance. In 1942, 11,000 soldiers built this road through 1,700 miles (2,700 km) of Canadian and Alaskan wilderness.
Their success transformed Alaska—and America—forever.
| ��� | ���������� |
| ���� | ����� |
| � | ��� |
| �� | ���� |
| �������������� | �� |
| � | ������������ |
| ���� | ���� |
| ����������� | ����� |
| �������������� |
The soldiers built the road under grueling conditions. During the winter, they shivered in canvas tents in -40° weather.
When summer arrived, the frozen ground turned into a muddy mess. Thirty men died during the eight months of construction. But the work went on.
American Society of Civil Engineers
Construction equipment sank into thawing permafrost.
In October 1942, soldiers linked the last two segments of road work. They had finished the highway in just eight months!
After a year of discouraging news from the war, the success cheered war-weary Americans.
U.S. Army Signal Corps.
Engineers from two segregated regiments shake hands to mark the completion of the highway.
In the early 1940s, America’s military was still racially segregated. Of the seven regiments assigned to the highway, three were made up of Black soldiers. Those men faced discrimination and hostility from their white counterparts. But their construction skills proved the racist skeptics wrong.
When road construction reached the Sikanni Chief River, engineers estimated that building a bridge would take two weeks. The Black soldiers of the 95th regiment bet a month’s pay that they could complete the bridge in just four days. It only took them three!
Black soldiers of the 95th Regiment pose for a photo on the completed bridge over the Sikanni Chief River.
University of Alaska, Fairbanks
When World War II broke out, Alaska was in danger. Japanese forces invaded the Aleutian Islands and bombed American bases. The U.S. government feared an invasion of mainland Alaska. The territory was poorly defended and difficult to reinforce. The only safe route was over land, but there was no road... yet.
The government decided to build a highway that ran from British Columbia to Alaska. Seven regiments of Army engineers were assigned to the task. They were given less than one year to complete it.
Dawson Creek
Alaska
Delta Junction
Canada
I.3Size: various
128.5”w x 46”h
I.3.a Migration Topic Panel Mural 128.5”w x 46”h
I.3.b-i Flip Doors 10”w x 10”h
Scale Drawn: 100% @ 12” = 12” Vendor:
3087 TOK APLIC
03.04.24
I.3 Migration Graphics
Design Pre-Production Graphic Designer: Nan Hildebrandt
Front Back Front Back Front Back Front Back
Front Back Front Back Front Back Front Back
| ���� | �� |
| ���� | �� |
| ���� | �� |
| ����� | �� |
| ��� | ���� |
| �������������� | ������������ |
| ����� | �� |
| ������� | �� |
| �� | �� |
| ������ | �������������� |
Who’s Passing Through?
Chelsea Arnold/USFWS
USGS Stanley-Mason Collection, Tacoma Public LibraryEric Carlson/U.S. Army
Migration Route of the Nelchina Caribou Herd
B eri ng Land Bridge
P A C I F I C O C E A N
A R T I C O C E A N
B E A R I N G
S E A
C hi sa na
R iv er
Ta n a n a R i v e r
Yu k o n R i v e r
The route followed by early gold miners.
Glenn Highway
Denali Highway
Parks H ighw ay
To k C ut off Nabesna Road
Ta yl or H ig hw ay (c lo se d w in te rs
Richardson H ighw ay
Alaska Highway
Top of the World Highway
Steese Highway
Elliot H ighway
C h is an a R iv er
N ab es na
R iv er
For tymi le R ive r
G u lca n a R i ve r
C ha r l ey
R iv er
A L A S K A R A N G E A L A S K A R A N G E
W R A N G E L L M O U N T A I N S
Yu k o n R i v e r
Ta n a n a R i v e r
C o p p e r R i v e r
Common visitor routes through Alaska
Migration route of warblers
Migration route of many waterfowl
C h is an a R iv er
N ab es na
R iv er
Ta n a n a R i v e r
P A C I F I C O C E A N
A R T I C O C E A N
Ways that invasive species reach Alaska
I.4.aSize: 60”w x 34”h
3087 TOK APLIC
09.22.23 12.18.23
I.4.a Swans Cut Out
Design Pre-Production Graphic Designer: Nan Hildebrandt 04.11.24
I.4.bSize: 25”w x 19.5”h
3087 TOK APLIC
09.22.23 12.18.23
I.4.b Pintail Cut Out
I.4.cSize: 23”w x 22”h
3087 TOK APLIC
09.22.23 12.18.23
I.4.c Mallard Cut Out
File details come from the government source that posted it. Updated .