The document is a Schematic Design - Basis of Design Narrative for the Orange County Adult Re-Entry Center Phase 1 project, prepared by Lionakis (Project No. 022137.02) for Orange County Public Works. The project involves the reconfiguration, renovation, and modernization of an existing Youth Guidance Center located at 3030 N. Hesperian Way in Santa Ana, California, transforming it into an Adult Re-Entry Center. Phase 1 will focus on renovating approximately 18,500 square feet across two westerly pods, including interior improvements, a new elevator structure for accessibility, and modifications to exterior walls and windows. The facility aims to provide supportive housing and services for adults transitioning out of jail, offering short-term stabilization, counseling, vocational training, and job readiness services.

The design narrative provides comprehensive details on the architectural, structural, mechanical, electrical, plumbing, and landscape systems for the project. Key design principles include creating a calming, home-like environment with nature-inspired color palettes, effective acoustics, and natural light to support rehabilitation. The renovation will include LED lighting, a four-pipe air handler HVAC system, fire sprinkler protection, and a high-efficiency irrigation system for landscaping. The interior finishes will prioritize durability, cleanability, and low maintenance, with a focus on creating spaces that promote healing, interaction, and personal growth. The project will utilize existing campus utilities and infrastructure, with minimal changes to the overall site conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORANGE COUNTY ADULT

RE-ENTRY CENTER

PHASE 1

3030 N. Hesperian Way

Santa Ana, California 92701

Lionakis Project No. 022137.02

Schematic Design - Basis of Design Narrative 10/06/2023

Page | 1

ARCHITECTURE

Overview The project is the reconfiguration, renovation, and modernization of the existing Youth Guidance Center (YGC) located at 3030 North Hesperian, Santa Ana, California 92706, into the new use as an Adult Re- Entry Center, which provides supportive housing and services for adults transitioning out of jail back into the community. The project's vision is to promote hope and motivation for improving life quality and transformation for a better future. The intent is to address the immediate needs of those coming out of custody or involved in the criminal justice system. This is not meant to be a homeless shelter or detox.

The facility will offer short-term housing for stabilization, and pending placement such as for hard-to-place individuals will be available to use until linked to other resources and services. Emphasis will be on coordination of care, basic life and social skills, emotional freedom, and other programs to be determined based on individual needs. It will include counseling for individuals who need to continue after being stabilized. Onsite vocational hands-on and virtual training, certification programs, job readiness services, job-specific training, and onsite recruitment process.

The existing building was built in 1969 and the site consists of a total of five octagon pods, a stand-alone Gym building, and outdoor landscape and field areas. The existing facility is partially occupied by juveniles in custody who will be relocated to the new Youth Transition Center (YTC) currently planned for the OC Juvenile Hall campus once it is completed. OCPW anticipates design and construction services for the Adult Re-Entry Center to begin immediately and the renovation of the center to be planned and constructed in phases. The current project will be Phase 1.

Phase-1 scope of work includes remodeling and tenant improvements of the two westerly pods at approximately 18,500 square feet net area with the addition of a stand-alone new elevator structure for accessibility compliance. Interior T.I. wall construction will consist of steel stud walls with sound insulation blankets. Ground level existing exterior doors and windows are proposed to be removed and replaced with new storefront glazing and doors at +8’-0” A.F.F. Second level existing exterior windows will be removed for new enlarged openable windows in the living units. The ground floor ceilings will be a combination of T-grid ceiling systems with lay-in acoustical ceiling tiles, and hard lid gypsum board ceilings in designated restroom/shower and storage areas. The second level central pod and common living areas will be open to the structure with exposed mechanical ducts and decorative suspended ceilings. Interior doors to be wood with stained finish. Provide interior glass wall systems as shown on floor plans.

Summary of Project Program

Ground Level

• Entry Lobby – to present a welcoming, warm, and cozy entrance with a coffee snack bar, and waiting lounge area.

• Admin. Open Office – provide admin. service counter, open office to accommodate 9 to 10 6’x6’ workstations with copy counter station provided by the client’s furniture vendor, supply counter with upper and base cabinets.

• Counseling & Private Offices – provide interior glass panel wall systems in the corridor to introduce natural light into the central office area, and wood doors with stained finish and lock set hardware.

Page | 2

• Conference – provide interior glass panel wall systems, TV media, and required elect/data outlets at all walls.

• Orientation – provide TV media, counter, and base cabinets.

• Multi-purpose – provide counter with base cabinets, sink with garbage disposal, refrigerator with ice maker and waterline, TV media screen, and outlets at all walls.

• Restrooms – accessible staff restrooms, drug test, resident’s unisex restrooms and showers.

• Janitor’s room – located with access from outside, floor mop sink, shelving, with sealed concrete finish floor.

Second Level

• Natural light - to create an environment that is calming, and homelike feeling. Introduce additional natural light by enlarging exterior perimeter windows and a new central skylight at the second-level common activity area.

• Common lounge areas - to promote community and collaboration. Provide TV screen, Wi-Fi & elect. outlets. Decorative open ceiling panels.

• Work/Study areas – provide a combination of open partition and glass panel systems for openness and visual supervision. Areas for study, computer lab, vocational training, and multi-purpose group activities.

• Counseling – provide sound privacy, wood door with stain finish, and latch set hardware.

• Living Units – provide a sense of safety, comfort, and a home-like feeling. Phase-1 living units accommodate all male residents and are single occupancy dormitory style. Interior steel stud walls with sound insulation blanket, and hard lid ceilings with eggshell paint finish. Unit doors are residential stained wood doors with a transom glass above. Each unit will have a twin XL bedframe/mattress, desk/chair, and wardrobe closet/drawer unit. Provide ceiling light/switch, electrical & TV outlets on 2 walls.

• Laundry and Janitorial – to promote responsibility and independence. Each will include one washer/tray, dryer machine, counter, sink with gooseneck faucet, upper / base cabinets, and floor sink.

• Break / kitchenette – provide counter with 2 sinks with gooseneck faucets and garbage disposal, base cabinets, upper open shelves, 2 refrigerators with icemaker & waterline, 2 microwaves, and center counter island.

• Restrooms / Showers – accessible common and unisex restrooms, and showers.

• Safety - provide general security and privacy for the facility, existing gated fence to remain for phase-1, security cameras, and card access for staff and residents.

• Elevator – new free-standing elevator tower hoistway and machine control room will utilize

CMU masonry block construction with exterior plaster finish to match the existing building color and finish. Hydraulic 3500 lbs. capacity with glass panels on the rear wall for supervision. New open bridge access walkway from existing second level open walkway to the new elevator tower.

Page | 3

INTERIOR FINISHES

Overview The interior design will provide connections to the outdoors using a nature inspired color palette, varied materials, organic patterns, effective acoustics, and natural light to provide a place of healing and transformation where everyone can thrive. These elements have been shown to reduce anger, stress, anxiety, and depression and are key to creating an environment that feels calming and inviting. As we have learned from the Healthcare industry, there is growing evidence that a built environment can have a significant impact on a person’s feelings, behavior, and performance. Finishes will focus on durability and cleanability, while group areas will have softer finishes introduced like carpet and acoustic panels to enhance comfort, friendships, and a sense of home.

All products will have a record of abuse resistance, weather resistance and the ability to be maintained with minimal resources throughout the life of the facility. Materials and finishes will be specified which are appropriate for the intended use of the room or area, are highly durable, and are easy to clean, and reduce required maintenance. Floor finishes will be selected to effectively endure the anticipated traffic in each area, while patterns and accents will provide a sense of wayfinding where applicable. Corner Guards will be provided at high traffic corridors and outside of rooms that have equipment movement or storage. Highly durable tile will be utilized in restrooms and wainscots.

See the architectural narrative for ceilings, doors, frames, and hardware.

The following is the finish legend and schedule by room type for the Adult Reentry.

INTERIOR FINISH MATERIAL LEGEND

Finish Material Legend ACP Wall Mounted Acoustic Panels PT-E Paint - Epoxy CPT Carpet Tile PT-L Paint - Latex CT Ceramic Tile RB Rubber Base CTB Ceramic Tile Cove Base RS Roller Shade LVT Luxury Vinyl Tile (E) Existing to Remain PL Plastic Laminate (vertical surface) SV Sheet Vinyl QT Quartz Solid Surface RB Rubber Stair and nosing’s FRP Marlite

Page | 4

Residents, Staff, and Support

Room Type Floor Base Wall Wainscot Casework Window Covering

Notes

Entry Waiting LVT RB PT-L N/A RS Administration CPT RB PT-L N/A RS Conference CPT RB PT-L N/A RS Mechanical (E) (E) (E) (E) (E) (E) Break Room/Co ffee LVT RB PT-L N/A QT/PL N/A Accent Tile Backsplash Restrooms CT CTB PT-E CT QT/PL N/A 48 ” Wainscot Office CPT RB PT-L N/A RS Counseling CPT RB PT-L N/A RS Corridor (1st Floor) CPT RB PT-L N/A N/A Corridor (2nd Floor) LVT RB PT-L N/A N/A Foyer Lobby CT CTB PT-L N/A N/A Orientation CPT RB PT-L N/A QT/PL N/A QT 4 ” backsplash Multi-Purpose LVT RB PT-L N/A QT/PL N/A Accent Tile Backsplash Electrical (E) (E) (E) (E) (E) (E)

Storage SV RB PT-L N/A N/A Shower CT CTB PT-E N/A N/A CT shower to ceiling Unit LVT RB PT-L N/A R S Laundry LVT RB PT-L N/A QT/PL R S QT 4 ” backsplash Study LVT/

CPT

RB PT-L/ACP N/A N/A 50% carpet/ 50% LVT

Lounge LVT/

CPT

RB PT-L/ACP N/A N/A 50% carpet/ 50% LVT

Work LVT/

CPT

RB PT-L/ACP N/A N/A 50% carpet/ 50% LVT

Computer CPT RB PT-L/ACP N/A N/A Kitchenette LVT RB PT-L N/A QT/PL N/A Common Living Area CPT/

LVT

RB PT-L N/A N/A 50% carpet/ 50% LVT

Stairs RB/SV RB PT-L N/A N/A SV at landings Janitor SV COVE PT-E FRP N/A 5 ’ Wainscot

Page | 5

Structural System Overview Structural services proposed are for the first phase of tenant improvement, repurposing the existing 65,250 SF Youth Guidance Center for use as an Adult Re-Entry Facility. The existing, two-story Youth Guidance Center is comprised of (5) seismically-connected octagonal-shaped “pods” interconnected at the second floor and roof by structural steel framing. Phase 1 of the proposed renovation will focus on approximately 18,700 SF of the two western-most pods and partial improvement of spaces bordering the west and south sides of the middle pod. Renovations to the three remaining pods will be considered in future phases.

Structural scope for Phase 1 will provide support for the proposed architectural project design, which includes a new elevator tower, new rooftop skylights, relocation and replacement of existing rooftop mechanical units, modifications to the existing exterior walls at the second floor, plus new exterior walls at first floor, revised partition wall and ceiling layouts throughout.

Based on preliminary assessments of the project site, it has been determined that the project site resides within a United States Geological Survey (USGS) seismic hazards zone due to potential soil liquefaction. In consideration of the existing building construction and proposed alterations to the structure, structural design will be prepared in accordance with the provisions of the 2022 California Existing Building Code (CEBC). Alterations to the existing structure will be closely coordinated with the requirements of the CEBC to avoid triggering a mandatory seismic rehabilitation. New components of the structural design will be prepared in accordance with the 2022 California Building Code (CBC), non- DSA/OSHPD Chapters.

To accommodate the Phase 1 Scope, the structural design of the elevator tower will utilize fully-grouted, specially-reinforced 8” CMU shear walls for vertical elements of the tower’s gravity and lateral force resisting systems. At the top of the CMU walls, structural steel ledgers will be anchored to the CMU to support structural steel beams and a bare-steel deck roof diaphragm. The elevator tower will be seismically-separated from the existing building at a distance sufficient to limit pressures applied to elevator pit foundations by existing building pad footings. Elevator tower foundations are to be determined, pending receipt of project geotechnical and geohazard report.

Per CEBC provisions, skylights at the roof will be calibrated at each pod to minimize the removal of each roof diaphragm to less than 10% in every direction. Additionally, new mechanical unit weights and locations will be coordinated such that the building mass increase does not exceed 10% of the original building design. Supplementary structural steel framing will be provided as required at skylights and mechanical unit locations to distribute revised structural demands. Total building mass increase will be documented on the construction documents.

Interior partition walls, new and modified exterior stud walls will utilize cold-formed steel framing, attached to the existing structure with post-installed concrete anchors at floors and supplementary cold-formed steel framing elements at the roof.

For Structural Provisions only, based on the new occupancy type of the repurposed structure, the Risk Category of the structure will be reduced from Risk Category 3 to Risk Category 2. Structures and non-structural components will be analyzed for Risk Category 2. However, if feasible, structural design will maintain the Risk Category 3 classification for flexibility in future building usage.

Page | 6

Mechanical System Overview

HVAC SYSTEMS AND CONTROLS

Systems Narrative The (2) octagon pods on the west end of building A will have a four-pipe air handler serving each level of each pod. There will be one air handler assigned per level for a total of (4) new air handlers. The air handlers serving the second level of each pod will be located on the roof. The air handlers serving the first level of each pod will be located in a mechanical room at level 1. New ductwork will be installed for all new systems. The new air handlers will be controlled via the EMS.

Design Criteria, Controls, Ventilation, Exhaust Energy-Pro will be used for heating and cooling load calculations. The calculations will be based on the 2022 Building Energy Efficiency Standards using 93°F DB and 70°F WB during summer and 39°F during winter.

Indoor Design Conditions (summer/winter):

74°F / 70°F +/- 2°F Office

74°F / 70°F +/- 2°F Work Room

74°F / 70°F +/- 2°F Meeting Room

74°F / 70°F +/- 2°F Lobby

74°F / 70°F +/- 2°F Common Areas

74°F / 70°F +/- 2°F Living Areas

80°F Max/ N/A +/- 2°F Electrical Room

The basis of design for the air handlers will be Energy Labs with temperature sensors per zone that can monitor space temperatures through the EMS.

The ventilation for the spaces will be set based on the California Building Energy Efficiency Standards

Greater of 15 CFM/Person or 0.15 cfm/sq.ft.

The minimum exhaust to the outdoors will be 75 CFM per water closet or urinal. For janitor closets and kitchenette, the exhaust will be the minimum per code.

Seismic Anchorage and restraints are a deferred submittal by the contractor and must be coordinated with the structural engineer and authority having jurisdiction.

ELECTRICAL SYSTEMS & LIGHTING

Narrative Description of System The existing campus is served by a 480Y/277V, 1000 amp service, and an emergency standby generator.

Recent upgrades were completed to the head end distribution switchboards in the existing electrical room in the north pod at the west end of Building A. For phase 1, the (2) octagon pods on the west end of building A will be renovated. New branch panels will be provided in the 2nd floor of the pods. For the 1st floor, branch panels will be evaluated on an individual basis, but most are beyond their useful life

Page | 7 and manufactured by FPE so they are recommended to be replaced. A new feeder from the electrical room will serve the new elevator.

Lighting Indoor Lighting – All fixtures will be LED and designed to follow IES recommended guidelines. Fixtures will consist of troffers, downlights, strip lights, as well as accent lighting where appropriate.

Outdoor Lighting - Design will follow IES recommended guidelines to minimize light pollution and glare while meeting the light distribution requirements for a given category. A designation of full cutoff shall be considered one measure of compliance, but not the sole criteria in evaluating fixture selection.

Consideration will also be given to the building theme and color palette.

Automatic Lighting Controls - All exterior fixtures shall have an integral photocell and be connected to a central lighting control panel. Interior fixtures shall have occupancy and daylight harvesting sensors where required. All fixtures and controls will be Title 24 compliant.

FIRE ALARM AND DETECTION

A complete and operable fire alarm system will be provided for this project. This will include updates to individual devices and additional booster panels as required. Duct smoke detectors installed in HVAC units providing airflow greater than 2,000 CFM will transmit a supervisory condition while achieving global shutdown in the associated area or building. Fire alarm system shall meet all local AJH and national fire protection requirements.

STRUCTURED CABLING / COMMUNICATIONS

Telecommunications Room For the most part, the main BDF room located within the first-floor storage room will remain as is. The existing rack is properly bonded and grounded. The rack has sufficient space to add additional patch panels and network switches to accommodate the remodel needs for the wing.

The south wing (area B) will require a small IDF cabinet to accommodate the data cabling needed for the first and second floors of the south wing. Fiber optic cabling will be needed to interconnect the new IDF to the existing BDF.

Telecommunications Cabling – Copper Cable shall be CAT 6A or better and rated for plenum-rated installations.

Cable pathways are to be in straight lines with as few turns as possible.

Cables will primarily be installed in conduits and within systems furniture.

Maximum cable length = 328 feet

All jacks for each Work Area Outlet are to be terminated at the patch panel in the Telecommunication Room.

Provide and install, at a minimum, copper CAT 6A cabling as specified from IDF to all Work Area Outlet locations.

All cables and connectors are to be clearly labeled in accordance with the labeling standards included herein.

Page | 8

Velcro cable ties are required every 9” except when cables are in conduit. Tie wraps are not acceptable in any instance. The following products will be provided and installed by the Contractor as required:

Hook-and-loop tie, 8", 40lb, 1.9" bundle diameter, 0.50" W, black

B-Line J-Hooks are to be used for all applications when J-Hooks are called for.

Fastening of J-Hooks to the structure is to be determined in the field and done to the manufacturer’s specification.

The following pre-approved products will be provided and installed by the Contractor:

Straight J-Hook, 1-1/4", 1/4" x 1-1/4", zinc

Straight J-Hook, 2", 1/4" x 1-1/4"

Offset J-Hook, 4", 3/8" x 1-1/2"

Design Requirements per space:

Offices/Administration: Each desk and office shall have a 4-port faceplate with a minimum of 3 active CAT 6A or better ports for VOIP and data applications, installed by the Contractor. The 4th port will be blanked for future use and may be specified for voice depending upon project.

Multipurpose/Orientation/Conference Rooms: A minimum of (2) 2-Port face places with (2) active CAT6A cables shall be installed within the room based on programming needs.

Lounge/Study/Work: A minimum of (1) 2-Port face places with (2) active CAT6A cables shall be installed within the room based on programming needs.

Wireless Local Area Network The Wireless LAN System will consist of redundant CAT6A cabling to all local wireless access points to provide appropriate coverage throughout the first and second floor areas. All necessary mounting hardware is to be included with the Wireless LAN System.

DOMESTIC WATER AND FIXTURES

Narrative description of system The domestic water system is existing to remain. However, all existing plumbing fixtures will be replaced with new and all piping connections from the point of disconnect will be new. If new plumbing fixtures are added that are not existing, new plumbing will be provided for these fixtures.

Potable Water Potable water will be distributed throughout the building using type L copper for above ground applications or type K copper pipe for underground installation. All fittings shall be wrought or drawn copper sweat type fittings. Valves and other devices shall be certified lead free. All pipes and fittings conform to appropriate ASTM and ANSI specifications. Connections to dissimilar metals shall be made with dielectric unions. Velocity for cold water piping shall be less than 8 feet per second and hot water to be less than 5 feet per second.

Page | 9

Domestic Hot Water Domestic hot water will be existing to remain. If new plumbing fixtures require hot water, a point of connection to the existing hot water loop will be made. All piping will be insulated with a conductivity range of 0.22-0.28 BTU-IN/HR per SQFT/°F and have a vapor barrier jacket.

Waste and Vent Waste and vent piping located within the building and within five feet of the building’s foundation shall be scheduled 40 no hub cast iron for piping above grade. Waste lines below grade shall be scheduled 40 PVC DWV. All piping shall conform to appropriate ASTM standards.

Roof Drains Where roof drain piping must be relocated or provided new, it shall be schedule 40 no hub cast iron for piping above grade. Waste lines below grade shall be scheduled 40 PVC DWV. Overflow drains shall be piped separately to outside the building. All piping shall conform to appropriate ASTM standards.

Condensate Piping from HVAC condensate shall be type L copper.

Plumbing Fixtures All potable water fixtures shall be lead free (AB 1953) compliant. All plumbing fixtures shall comply with California Plumbing Code flow rates as well as CalGreen plumbing fixture requirements.

FIRE SPRINKLER

Narrative description of system The (2) octagon pods on the west end of building A are to be protected throughout with an automatic wet fire suppression system, in accordance with California Fire Code (CFC) and NFPA Standards. The supply is to be by a dedicated line connected to the municipal water supply. A backflow assembly device to be installed, on the dedicated line, outside the building, as part of the fire supply line. Downstream of the backflow assembly, a fire department connection (FDC) to be provided to allow the fire department to pressurize the building fire system. The automatic wet fire suppression system will connect to a flanged fitting within the designated fire riser space, adjacent to the exterior of the building. The systems will be equipped with drains, valving, and monitoring per the requirements of NFPA.

Design Criteria and Calculations Hydraulic Design The automatic sprinkler systems' hydraulic demand shall be calculated and demonstrated to be below the city supply curve with a 10% reduction applied to the supply curve.

Light Hazard –Offices/Admin, Lobby, Conference, Restrooms, Dwelling Units, Common Living Area

Design Density: 0.10 GPM/SF, 1500 SQ FT

Hose Stream Allowance: 100 GPM

Ordinary Hazard Group I –Telecom rooms, Mechanical rooms, Storage rooms (Up to 8 ft stockpiles), Electrical rooms, Custodial rooms

Design Density: 0.15 GPM/SF, 1500 SQ FT

Hose Stream Allowance: 250 GPM

Page | 10

Ordinary Hazard Group II – Storage rooms with Class I-IV commodities top of storage > 8 ft < 12 ft

Design Density: 0.20 GPM/SF, 1500 SQ FT

Hose Stream Allowance: 250 GPM

Seismic Design The zone of influence for the sprinkler system shall be identified on the plans, and calculations shall be provided to justify the brace components, anchorage, sizes, and spacing. Brace locations shall be shown on the plans and labeled for identification of size and type. Structural drawings shall be referenced to determine the applicable Cp factor.

Page | 11

Civil Overview

The majority of the existing site outside the structure will remain unchanged. A new elevator attached to the outside of the structure and a fire line for the new fire sprinkler system, are proposed as additional upgrades for the Orange County Adult Re-Entry Center, located west of the Interstate 5, Highway 22, and Highway 57 interchange, and east of the Santa Ana River.

Existing Conditions Existing site improvements will largely remain unchanged, except for existing landscaping in the immediate area of the proposed elevator and existing surface improvements along the proposed fire line alignment.

Site Grading The existing site drainage appears to follow the same direction as the Santa Ana River, draining in a northeast to southwest direction. Any modifications to the existing surface improvements for trenching purposes will be repaired in accordance to public works’ standards. An addition of an elevator to the outside of the existing building will be set approximately at the same elevation as the existing finished floor to provide drainage away from the elevator addition and accessible access from the existing walkway.

Civil Utilities The existing domestic water mainline and sewer mainline will need to be confirmed by a Utility Master Plan, or utility survey, and are anticipated to be reused. Fire Service Water is anticipated to make a connection to the existing fire/domestic water system on the campus. The proposed connection point is located on the west side of the building and adjacent to the existing parking lot. A backflow preventer and fire department connection will be required for the structure’s proposed sprinkler system. The existing sewer lateral on the south side of the existing building may need to be relocated because the footprint of the proposed elevator is on top of the sewer lateral.

Attached is Exhibit 1, showing the location of the existing utilities from an as-built plan and the proposed utility revisions and additions.

The Dry Utility (electrical / communication / natural gas) and chilled water, proposed design, relocations, and extensions will be addressed on the Site MEP's Plans.

Stormwater Treatment Water quality treatment BMP’s or any combination of underground storage systems are not anticipated for this project.

Page | 12

Landscape and Irrigation System Overview

Landscape and hardscape surrounding the OC Adult Reentry Center will complement the Architectural design improvements of the existing structure, respond to the dynamic interior uses, facilitate accessible circulation, seek to extend the learning environment opportunities into the outdoor realm, encourage interaction and exploration, function and integrate with the storm water management system, and provide planting areas that complement the established horticultural program and feature low water use, campus-approved species. The landscape will be designed to meet sustainable criteria, with energy and water resource conservation as well as habitat enhancements in mind.

A high-efficiency, weather-based irrigation system connected to the existing campus potable water source will irrigate drought tolerant/low water use plant species and support the long-term success and low maintenance needs for the project site. The selection of adapted ornamental and native plants with low or very low water requirements and proven performance in public educational settings, will promote water conservation, increase habitat, and expand the educational opportunities. Soil cover in shrub planting areas will consist of gravel or wood bark mulch to meet State requirements for reducing evapotranspiration of applied irrigation water and improve site soil conditions.

A water efficient landscape design will meet or exceed the State of California’s MWELO ordinance (Model Water Efficient Landscape Ordinance). The Design Team understands that use of the Water Ordinance provides direction, guidelines, and standards that provide clear direction for development of the construction documents. Plant selection, proper hydro zoning (grouping of plants based on water needs), consideration of climate, geographical location, solar exposure, topographical conditions, and employment of an efficient irrigation system are all principles that have been applied to this project to create a sustainable landscape site.

New exterior hardscape will respond to the architectural forms and interior circulation, be designed to provide intuitive and accessible circulation, rest opportunities where applicable, and visual interest.

Wide walkways with large planters and preservation of existing trees where possible will complement the campus theming and shade the circulation and gathering spaces. Redesign of the storm water rain garden will surround the new elevator structure with the intent to remove some of the high-water use/ high maintenance turf area.

New tree locations will be coordinated with underground storm water infiltration pipes, site utilities, and interior view lanes. Root barriers will be installed at new tree locations that are within 10’ of any hardscape. Native and ornamental grasses will be planted over any storm water infiltration pipes as soil cover will be limited to a depth of no more than 3’-4’.

The plant palette will respond to the OCPW approved plant list(s) as well as include proven commercially available adapted ornamental and California native species. Plant species will be selected for safety and visibility, educational value, water conservation, and the comfort and sensory enrichment of the users. The form and layout of plants will aid in the surveillance of the site by staff, encourage visual openness, while achieving aesthetic interest through color, texture, size and fragrance. Shrubs will be spaced widely to allow for full mature growth and reduce required long-term trimming and maintenance. Flowering accent trees and evergreen shade trees will be located for human comfort to offer visual relief and interest as viewed from interior spaces.

ARCHITECTURE
Overview
Summary of Project Program
INTERIOR FINISHES
Overview
INTERIOR FINISH MATERIAL LEGEND
Structural System
Overview
Mechanical System
Overview
HVAC SYSTEMS AND CONTROLS
ELECTRICAL SYSTEMS & LIGHTING
Lighting
FIRE ALARM AND DETECTION
STRUCTURED CABLING / COMMUNICATIONS
DOMESTIC WATER AND FIXTURES
FIRE SPRINKLER
Civil
Overview
Existing Conditions
Site Grading
Civil Utilities
Stormwater Treatment
Landscape and Irrigation System
Overview

File details come from the government source that posted it. Updated .